Concept illustration of PU Solid Tire Lines for Bikes & Medical WheelsConcept illustration; not a photograph of a delivered machine or customer project.

Solid PU Tire Manufacturing Turnkey Plant

Plan molded solid or microcellular PU tire and wheel production for bicycles, mobility components, garden equipment and specified industrial applications. Select materials and tooling for each wheel assembly.

Small Solid-Tire and Medical Wheel Applications

Match the component, formulation and production process to its own application requirements.

Bicycles and Shared Bikes

Microcellular or solid PU tires with the required tire/rim geometry.

E-Bikes and Light Mobility

Select formulation, load and speed requirements for each application.

Children’s and Balance Bikes

Configure small tire sizes, tread patterns and finishing.

Wheelchair Tires

Define tire position, size, rim fit and rolling requirements.

Medical Wheels and Casters

Small medical wheel components with application-specific cleaning and rolling requirements.

Lawn and Agricultural Equipment

Define wheel geometry, hub interfaces, load and terrain before selecting molding equipment.

Worksite and Off-Road Equipment

Evaluate the specific wheel assembly, operating duty and material requirements; equipment delivery does not establish wheel load or service qualification.

Small Solid-Tire and Medical Wheel Solutions

Compare existing bicycle and medical-caster routes with the four related garden, agricultural, worksite and off-road wheel solutions. A wheelchair configuration inquiry is identified separately from the small-caster solution.

Bicycle and E-Bike Solid Tires

Microcellular PU tire manufacturing with application-specific density, tooling and production cadence.

Process and Configuration

Bicycle and light-mobility tire toolingLow-pressure or dedicated high-pressure configurationsCuring and quality checks

Medical Mobility and Small Medical Wheels

Configure medical wheel production around diameter, hardness, tread, cleaning requirements and the intended component. The existing medical solution describes small caster components.

Process and Configuration

Medical caster and mobility component requirementsApplication-specific moldsLow-noise and cleaning requirements

Lawn and Garden Equipment Wheels

Plan molded PU wheel manufacture around hub geometry, tire dimensions, formulation and the selected garden-equipment duty.

Process and Configuration

Wheel and hub designMolding and curing configurationApplication-specific component tests

Agricultural Utility Vehicle Wheels

Match casting, hubs and tooling to the specified agricultural support wheel. Load and field suitability require the selected component validation.

Process and Configuration

Part drawings and hub interfaceFormulation and casting processLoad and operating-duty evaluation

Worksite Construction Equipment Wheels

Define wheel size, hub preparation, casting and curing for the selected worksite equipment and duty.

Process and Configuration

Hub and tooling requirementsMaterial and process planningComponent acceptance criteria

Off-Road Heavy Equipment Wheels

Review closed-mold manufacture of PU wheel assemblies for the specified off-road application. Filling an existing pneumatic tire casing uses a separate process.

Process and Configuration

Molded wheel assembly routeHub, mold and material selectionDuty-specific validation

Share Wheel Drawings, Mold Cavities, Cycle Time and Daily Working Hours

Small Solid-Tire Production Equipment

The automatic carousel is a bicycle-tire line. The other linked platforms describe bicycle, medical-wheel or general solid-tire metering; they are not automatically a complete heavy-duty off-road wheel line. Related equipment cards describe route-specific references, not a single standard line.

Existing configuration and application references

Figures apply to their listed models, configurations or applications. They are not a guarantee for every production system.

24 Mold Stations
HF-BIKE-CAROUSEL-24 Bicycle-Line Configuration

Delivery Scope and Integration

Coordinate hub preparation, material metering, molding, curing and demolding for the selected wheel assembly. Tire geometry, formulation and acceptance conditions define each production configuration. Included stages and customer-provided interfaces follow the agreed project scope.

Application-Specific Configuration

Define material chemistry, component geometry, output and factory conditions.

Integrated Equipment and Controls

Coordinate dosing, material handling, mixing and downstream work stages.

Commissioning and Training

Provide installation, operating setup and operator training within the delivery scope.

Warranty and Spare Parts Support

Confirm warranty coverage, commencement, spare parts and service responsibilities in the equipment agreement.

Factory Planning FAQ

Review the route, equipment interfaces and project inputs before planning your production system.

How do solid and microcellular PU tire configurations differ?

The selected material system, density target, mold design and curing conditions differ. Hub preparation, material delivery and handling are specified for the tire or wheel assembly.

Is tire filling included in this molding route?

Tire filling treats an existing casing and is a separate application. This page concerns molded PU tires and wheels; choose the tire-filling route where a retained casing is required.

Does a casting machine establish tire performance?

Load capacity, rolling behavior, wear and bonding depend on the complete material and wheel assembly and the required tests. The equipment package addresses controlled processing and agreed factory interfaces.

What is needed for a preliminary factory proposal?

Send your material data, product dimensions, production target, planned site utilities and required process stages. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days. Equipment scope, commissioning milestones and acceptance criteria are agreed for each project.

Let’s Plan Your Tire Equipment Configuration

Provide wheel and hub drawings, formulation, cavity count, mold/station arrangement, working hours and target quantity. State cycle time from station entry to demolding separately from the line output interval; parts per cycle depend on mold cavities, commonly one part per mold. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube