Medical Caster and AGV PU Wheel Production Line Upgrade Project in China

Medical Polyurethane Caster & AGV Wheel Production Line Intelligent Upgrade showcases an intelligent polyurethane caster and AGV wheel production solution designed to improve automation, production efficiency, dimensional consistency, and manufacturing.

Project Overview

Project reference basis. Figures and configuration details are reported in the supplied project brief. They are reference values for the stated application, rather than verified acceptance results or a guarantee for another installation. Confirm the source records, material, tooling, operating schedule and test method when assessing a comparable project.

The customer is a medical tire manufacturer with 12 years of experience, specializing in operating table casters and medical AGV polyurethane wheels. Its original 3 semi-automatic production lines produced approximately 120,000 tires annually. Low production efficiency, unstable quality, lack of international certifications and high production costs prevented the company from meeting increasingly stringent requirements for precision, cleanliness, biocompatibility and overseas market access. Haifeng Polyurethane Machinery implemented an integrated intelligent upgrade covering equipment modernization, medical-grade formula optimization, full-process quality control and certification support within 6 months.

Daily output increased from 320 to 1,200–1,500 tires, representing a 3.7–4.7x capacity increase; annual output exceeded 450,000 tires; order lead time decreased from 20 to 7 days; finished-product pass rate increased from 82% to 98.5%; customer complaint rate decreased from 18% to 0.8%; FDA and CE certifications were obtained; overseas sales increased from 0% to 35% of total revenue; raw material waste decreased from 15% to 6%; labor cost per tire decreased from RMB 12 to RMB 5; monthly maintenance downtime fell below 1 hour; total production costs decreased by 28%; domestic hospital customers increased from 86 to 210; and long-term supply contracts were secured with two leading global medical equipment brands.

Solutions Delivered

Haifeng Polyurethane Machinery upgraded the customer’s 3 traditional semi-automatic production lines with an integrated intelligent solution based on the HF-CPU series low-pressure foaming system (standard base model: HF-LPM-1A1B-T), combined with an 8-station rotary mold carrier for automatic material proportioning, constant-temperature pouring and online inspection. A multi-specification parameter database for 12–24 inch medical tires, high-precision metering technology and medical-grade modified polyurethane formulas enable rapid specification changeover, stable molding and medical-grade performance including antistatic and disinfectant resistance. The project also established a three-tier quality control system covering raw materials, semi-finished products and finished products, together with FDA and CE certification support, on-site installation and commissioning, operator training, 24-hour technical support and regular maintenance.

Equipment Model Qty Function
Low-Pressure Foaming Machine HF-LPM-1A1B-T 1 set Precise polyurethane metering, mixing and low-pressure foaming for medical casters and medical AGV wheels.
Rotary Mold Carrier 8-Station 1 set Supports continuous multi-station molding and automated mold rotation.
Automated Foaming Production Line HF-CPU Series 1 line Integrates automatic proportioning, constant-temperature pouring and online inspection.

Project Results

+370%
Production Capacity Increase
Daily output increased from 320 to 1,200–1,500 medical tires, with annual production exceeding 450,000 units.
98.5%
Finished Product Pass Rate
The finished product pass rate increased from 82% to 98.5%, while the customer complaint rate dropped from 18% to 0.8%.
-28%
Production Cost Reduction
Overall production costs decreased by 28% through lower material waste, labor costs and equipment maintenance expenses
Haifeng Polyurethane Machinery Polyurethane Medical Tire Production Upgrade Project Case 1

Explore Related Manufacturing Solutions

Review the manufacturing route and equipment interfaces associated with Medical Polyurethane Caster & AGV Wheel Production Line Intelligent Upgrade. Submit your own product and production requirements to discuss an appropriate line configuration.

Discuss Your Production Configuration

Plan Your Polyurethane Production Project

Our engineering team is ready to design a customized PU machinery solution that matches your production targets, quality standards, and investment plan. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube