Automatic PU Wheel Casting Line | AGV and Forklift Wheels
Automatic PU Wheel Casting Line for AGV and Forklift Wheels. Review configuration, material requirements and process interfaces with Haifeng.

Polyurethane elastomer casting equipment for wheels, rollers, mining screens, seals and wear liners, with heated metering and application-specific tooling.
Automatic PU Wheel Casting Line for AGV and Forklift Wheels. Review configuration, material requirements and process interfaces with Haifeng.
Centrifugal PU Casting Machine for Pump and Cyclone Liners. Review configuration, material requirements and process interfaces with Haifeng.
Seal-component casting with heated preparation, vacuum degassing and controlled metering. Vacuum tooling and subsea qualification are separate requirements.
Mining-screen casting with vacuum preparation, stepped dispensing and configured aperture tooling and mold handling.
Three-Component PU Casting Machine for Industrial Elastomers. Review configuration, material requirements and process interfaces with Haifeng.
Printing Roller Covering: listed color-paste feed and recipe-control arrangement, with material preparation, metered casting and finishing interfaces reviewed for the roller.
Cast PU delivery for pipe linings, with heated preparation and metering coordinated with substrate preparation, tooling and cure requirements.
General Industrial Roller Covering: listed 2a2b arrangement with auxiliary or color-paste feed options, with material preparation, metered casting and finishing interfaces reviewed for the roller.
Vacuum and Suction Roller Covering: listed 1a1b arrangement with independent temperature control, with material preparation, metered casting and finishing interfaces reviewed for the roller.
Textile Dyeing Roller Covering: listed 2a2b arrangement with an additive-feed option, with material preparation, metered casting and finishing interfaces reviewed for the roller.
Metering and casting for PU hydraulic-seal blanks, with material conditioning, tooling and machining interfaces selected for the sealing duty.
PU preparation, metering and dispensing for specified rail components or site applications. Acceptance follows the agreed tests and scope.