PU Elastomer Casting Machine | Railway Engineering
High-performance casting system for railway track applications, featuring anti-aging additives and precise filling for expansion joints and sleepers
Discharge Flow Rate
120–1800 g/s
Mix Ratio
Polyurethane Prepolymer : Curing Agent (MOCA) = 100:10~14
Metering Accuracy Reference
≤±0.3% (Full range)
Temperature Control
Tank A: 30~80°C; Tank B(MOCA): 90~115°C
Product Overview
PU preparation, metering and dispensing for specified rail components or site applications. Acceptance follows the agreed tests and scope.
This configured PU unit supplies material preparation, metering, mixing and dispensing for specified railway components, filling or sealing applications. The listed 2A2B arrangement and any additive feed are selected for the formulation and processing task.
Temperature control, delivery pressure, site access and any mobile-working interfaces are defined for the application. Material compatibility, substrate preparation, filling and cure conditions must be reviewed together.
Wear, impact, aging, bonding and vibration performance belong to the material and completed component or installation. Equipment supply does not establish track stability, operational safety or railway qualification. Component tests, infrastructure acceptance and service-release responsibilities are agreed with the responsible project parties.
Operation Workflow
Raw Material & Additive Preparation
Prepare polyurethane prepolymer and MOCA curing agent at the target mix ratio (100:10-14); select anti-aging and anti-vibration additives and load them into the dedicated additive tank.
Tank Loading & Temperature Setting
Load prepolymer into Tank A and MOCA curing agent into Tank B; set Tank A temperature to 30-80°C and Tank B to 90-115°C according to the curing agent requirements.
Metering, Mixing & Precision Pouring
The PLC metering system (accuracy ≤±0.3% full range) dispenses precisely; the mixing head runs at 6000-10000 r/min, with pouring rate (120-1800 g/s) and pressure (1.2-2.8 MPa) adjustable for track filling.
Curing & Quality Inspection
Allow the poured elastomer to cure; precise temperature control ensures controllable curing speed without affecting railway schedules, and filled areas are inspected for full, dense filling with uniform stress distribution.
Need a quote for this equipment?
Request a QuoteTechnical Specifications
Standard configuration parameters for the railway engineering cast unit. Customizations are available upon request.
| Technical Parameter | HF-CPUE-2A2B-Railway |
|---|---|
| Pouring Rate | 120~1800 g/s |
| Raw Material Ratio | Polyurethane Prepolymer : Curing Agent (MOCA) = 100:10~14 |
| Tank Capacity | 220 / 300 L |
| Mixing Head Speed | 6000~10000 r/min |
| Dynamic Metering Accuracy | ≤±0.3% (Full range) |
| Tank Configuration | 2A2B two-component + anti-aging additive tank |
| Material Temperature Control | Tank A: 30~80℃; Tank B(MOCA): 90~115℃ |
| Pouring Pressure | 1.2~2.8 MPa |
| Cleaning System | High-pressure circulating cleaning + air purge cleaning |
| Power | 8~16 kW |
| Control System | PLC + touch screen + multi-formula storage |
| Applicable System | Polyurethane Elastomer System |
| Warranty | 1 year |
| Certifications | Confirm applicable documents for the quoted configuration |
Key Features & Advantages
Engineered for durability, precision, and efficiency in demanding railway track construction and maintenance.
2A2B Configuration with Anti-Aging & Anti-Vibration Additives
Long-term resistance to outdoor erosion, UV, rain and train vibration, suitable for long-term outdoor railway working conditions.
Dynamic Precise Metering & Controllable Pouring Pressure
Full and dense filling with adjustable pouring rate (120–1800 g/s) and pressure (1.2–2.8 MPa), suitable for precise filling of track expansion joints and sleepers with uniform stress.
Precise Temperature Control Across Wide Range
Adaptable to complex outdoor construction environments with controllable curing speed that does not affect railway operation and construction progress.
Strong Bonding with Steel Rails & Concrete Substrates
Bonds firmly with steel rails and concrete, prevents moisture and debris intrusion, ensures track stability and driving safety.
Mobile Working Vehicle Compatible
Designed for use with mobile working vehicles, meeting high-load and high-efficiency railway construction requirements across multiple work sites.
Intelligent PLC Control with Multi-Formula Storage
PLC + touch screen interface with multi-formula storage simplifies operation, reduces errors, and enables rapid changeovers between formulations for different railway construction specifications.
Discuss Your Equipment Configuration
Share your product, materials, tooling and production requirements so we can review the equipment and interfaces for your project.
Explore Other Equipment
Browse other equipment in our catalog. These listings are for product discovery; compatibility and production-line scope are confirmed separately for your material, process and output requirements.
Frequently Asked Questions
What railway engineering applications is this machine designed for?
How does the machine resist outdoor railway conditions?
How is filling quality assessed?
Can the machine adapt to complex outdoor construction conditions?
How strong is the bonding with steel rails and concrete?
What certifications does this equipment hold for railway construction?
Ready to discuss your project?
Contact Our Team