Discharge Flow Rate
80–1200 g/s
Material Mix Ratios
MOCA: 100:10~13; BDO: 100:4~6
Metering Accuracy Reference
≤±0.3% (Full range)
Temperature Control
Tank A: 30~80°C; Tank B: MOCA(90~115°C)/BDO(25~50°C)
Textile Dyeing Roller Covering — Configuration and Scope
PU covering for textile dyeing, padding and finishing rollers, reviewed against the process bath and fabric-contact requirements.
The listed HF-CPUE-2A2B-Roller-Dyeing configuration is reviewed around bath chemistry, cleaning procedure, temperature, core drawing and fabric-contact requirements. Any additive feed follows the approved formulation. Acid, alkali or dye resistance is a finished-material property and is checked under the actual exposure conditions.
Haifeng configures material preparation, degassing, metering and dynamic mixing. Core preparation, tooling, curing, grinding and inspection are defined as supplied or integrated interfaces in the proposal.
Finished-part performance is determined by the selected materials, processing conditions and agreed tests. Chemical exposure, fabric contact, cover finish and bond testing are reviewed against the agreed service and test conditions.
Compare application requirements: Extrusion-Line Roller Covering · Cold-Rolling Support and Guide Roller Covering · Vacuum and Suction Roller Covering · General Industrial Roller Covering · Printing Roller Covering
Operation Workflow
Define the Roller Duty
Provide bath chemistry, cleaning procedure, temperature, core drawing and fabric-contact requirements.
Prepare Material and Core
Confirm the selected formulation, feed configuration, core preparation, bond system and tooling.
Meter, Cast and Cure
Coordinate material conditioning, metered shot, mold filling and the formulation-specific cure schedule.
Finish and Inspect
Review chemical exposure, fabric contact, cover finish and bond testing. Finished-part performance is determined by the selected materials, processing conditions and agreed tests.
Need a quote for this equipment?
Request a QuoteTechnical Specifications
Standard configuration parameters for the dyeing roller PU elastomer casting machine. Customizations are available upon request.
| Technical Parameter | HF-CPUE-2A2B-Roller-Dyeing |
|---|---|
| Pouring Rate | 80~1200 g/s |
| Raw Material Ratio | MOCA: 100:10~13; BDO: 100:4~6 |
| Tank Capacity | 220 L |
| Mixing Head Speed | 6000~10000 r/min |
| Dynamic Metering Accuracy | ≤±0.3% (Full range) |
| Tank Configuration | 2A2B two-component + anti-corrosion additive tank |
| Material Temperature Control | Tank A: 30~80℃; Tank B: MOCA(90~115℃)/BDO(25~50℃) |
| Vacuum Defoaming | Vacuum ≤-0.095MPa |
| Cleaning System | Automatic circulation + air purge cleaning |
| Power | 11~15 kW |
| Control System | PLC + touch screen + multi-formula storage |
| Applicable System | CPU Prepolymer + MOCA/BDO Chain Extender |
| Warranty | 1 year |
| Certifications | Confirm applicable documents for the quoted configuration |
Equipment Configuration and Application Inputs
Configuration features are reviewed for the selected roller, material and factory interfaces. Finished-part performance is determined by the selected materials, processing conditions and agreed tests.
Textile Dyeing Roller Covering
PU covering for textile dyeing, padding and finishing rollers, reviewed against the process bath and fabric-contact requirements.
Listed Feed Arrangement
Listed 2A2B arrangement with an additive-feed option. Any additive feed follows the approved formulation. Acid, alkali or dye resistance is a finished-material property and is checked under the actual exposure conditions.
Material Conditioning
Heating, degassing and circulation follow the selected material data and equipment operating limits.
Shot and Mold Coordination
Review bath chemistry, cleaning procedure, temperature, core drawing and fabric-contact requirements. Metered filling is coordinated with the actual tooling and reaction window.
Core and Finishing Interfaces
Chemical exposure, fabric contact, cover finish and bond testing are included in the scope and acceptance review.
Finished-Roller Validation
Finished-part performance is determined by the selected materials, processing conditions and agreed tests.
Discuss Your Equipment Configuration
Share your product, materials, tooling and production requirements so we can review the equipment and interfaces for your project.
Explore Other Equipment
Browse other equipment in our catalog. These listings are for product discovery; compatibility and production-line scope are confirmed separately for your material, process and output requirements.
Frequently Asked Questions
Does an additive tank establish chemical resistance?
What information is needed to configure this equipment?
Does the casting machine guarantee roller service performance?
Can the configuration use different cast PU formulations?
Ready to discuss your project?
Contact Our Team