Cleanroom Sandwich Panel Production Solution Banner background

Cleanroom Sandwich Panel Production Solution

Configure PU/PIR foaming or rock wool lamination for cleanroom wall and ceiling panels, with controlled surfaces, joints, sealing and cutting. Concept illustration — not a photograph of delivered equipment or a customer installation.

≤0.3mm / 1 m Reference surface deviation over 1 m measurement length
50–150mm Reference panel thickness
PU/PIR/RW Separate configured core routes
Controlled Environment Enclosure

Panel Manufacturing for Controlled Environments

Cleanroom panel manufacturing coordinates facing preparation, core processing, joint design and handling. The supplied surface-deviation reference is ≤0.3 mm over a 1 m measurement length, as confirmed by Haifeng. Room cleanliness classification, pressure retention and chemical-cleaning compatibility require assessment of the complete installed enclosure and ventilation system; the panel line does not certify a cleanroom class.

Surface Measurement

Specify the 1 m measurement length, instrument, panel support and sampling plan for the reported ≤0.3 mm deviation.

Joint and Seal Design

Agree gasket channels, joint tolerances and pressure-test conditions for the assembled envelope.

Haifeng configures facing, metering or adhesive application, lamination, cutting and handling for the selected panel route. Cleanroom qualification is a separate facility task.

Cleanroom Manufacturing Workflow

Precision Cleanroom Panel Lamination Process

Facing preparation, route-specific core processing, controlled lamination and cutting with dust extraction.

01

High-Precision Flush Joint Roll Forming

Pre-painted medical-grade coils pass through micro-adjustable forming cassettes, shaping flush tongue-and-groove edges with integrated sealant channels.

TOLERANCE: ±0.1 MM | MATERIAL: SUS304 / ANTI-STATIC STEEL
02

Automated Core Positioning & Edge Foaming

For rock wool panels, slit and orient mineral strips, apply adhesive and configure PU edge foaming where specified. PU/PIR foam-core panels use a separate reactive laydown configuration; mineral wool is not itself foamed.

MINERAL DENSITY: 100–120 KG/M³ | PU EDGE DOSING
03

High-Rigidity Heated Double-Belt Lamination

The supplied 30 m reference laminator controls panel thickness and cure conditions. The reported surface deviation is ≤0.3 mm over a 1 m measurement length; thickness tolerance is a separate quantity.

TRACK LENGTH: 30 M | FLATNESS: ≤0.3 MM OVER A 1 M MEASUREMENT LENGTH
Configuration & Process Parameters

Technical Specifications

Review the equipment and process parameters for Cleanroom Controlled Environment Panel Line. Final values depend on the material, tooling, production target and agreed configuration.

Technical ParameterStandard Specification / ValueEngineering Context & Verification
Target ApplicationPharmaceutical GMP, Semiconductor, Bio-lab CleanroomsApplication planning; installed-room classification is separate
Core MaterialsPolyurethane (PUR) / Polyisocyanurate (PIR) / Structural Basalt Rock WoolRoute-specific core; finished-panel performance requires testing
Surface Flatness Tolerance≤0.3 mm over a 1 m measurement lengthUser-confirmed 1 m measurement basis; agree instrument and sampling
Joint ConfigurationFlush Cleanroom Tongue-and-Groove with Gasket Slot50 Pa is a supplied pressure-test reference; define leakage criterion and assembly
Panel Thickness Range50 mm – 150 mmStandard cleanroom wall and ceiling dimensions
Continuous Line Speed4 – 10 m/minBalanced for rock wool insertion and curing
Confirm specifications against the selected formulation, tooling and operating conditions before final equipment selection.
Engineering Considerations

Key Cleanroom Engineering Advantages

For Cleanroom Controlled Environment Panel Line, assess material compatibility, process control, equipment interfaces and changeover needs against your production brief.

Measured Surface Control

Reference deviation ≤0.3 mm over 1 m; agree sampling and panel support.

Facing and Cleaning Compatibility

VHP compatibility depends on the selected coating, seal and cleaning conditions; qualify them separately.

Joint Inspection

Check profile and seals against the agreed leakage test.

Core Route Selection

Specify foam-core production or mineral-wool adhesive lamination. Finished-panel fire performance includes facings, adhesive and edge foam.

Production Planning Questions

Frequently Asked Questions

Find answers about Cleanroom Controlled Environment Panel Line, including material selection, equipment configuration and the information needed to plan a production line.

How is the surface-deviation value measured? +
The confirmed basis is maximum deviation ≤0.3 mm over a 1 m measurement length. Agree the instrument, support, sampling positions and acceptance procedure.
Can one configuration process foam and rock wool? +
Hybrid equipment requires the separate mineral-wool feeding/adhesive modules and PU/PIR metering/laydown modules in its supply schedule.
Does the equipment certify ISO cleanroom class or VHP resistance? +
No. Room air classification belongs to the complete commissioned facility; coatings, seals and panels require compatibility tests for the cleaning process.
How is cutting dust controlled? +
Specify enclosed cutting, extraction airflow and filters; verify collection in the installed configuration.
How long does commissioning take? +
The related supplied project brief records 36 days. Your schedule depends on site readiness, integration and agreed trials.

Discuss Your Sandwich Panel Project