NEV Composite Workshop Overall Planning Case | Shandong, China

A Shandong NEV composite workshop planning project covering equipment layout, material flow, cutting and layup areas, molding, curing and downstream operations.

Shandong NEV Composite Workshop Overall Planning Case

Project Background A Shandong new energy vehicle composite parts enterprise founded in 2017 supplies composite structural and interior parts to NEV makers, and planned a new composite molding workshop covering molding, autoclave forming, oven curing, trimming, cutting, machining, gluing, painting and assembly. Challenges No mature workshop layout plan, unplanned logistics aisles and storage, no cleanroom for cutting and lay-up, scattered equipment parameters and no cold storage. Haifeng Solution Haifeng undertook the turnkey workshop overall planning and engineering project, covering design, manufacturing, transportation, installation, commissioning, training and trial production, with smooth one-way material flow and informatization boards. Results Logistics distance shortened about 30%, planned capacity rose about 40%, with annual savings of about RMB 3.00 million and a payback period of about 5 years.

Turnkey Workshop Overall Planning

Haifeng undertook the turnkey workshop overall planning and engineering project covering design, manufacturing, transportation, installation, commissioning, training and trial production, including overall layout, logistics aisles, storage and cleanroom, and informatization display.

EquipmentModelQtyFunction
Composite Molding & Forming Section1 systemMolding, autoclave forming and oven curing of composite parts
Post-Processing Section1 systemTrimming, cutting, machining, gluing, painting and assembly
Workshop Utility & Storage1 systemRaw material/WIP/finished storage, cold storage and utility plans
Informatization Board1 setReal-time display of equipment parameters in each process section

Project Results

-30%
Logistics Distance
Logistics distance about 30% shorter than the original plan
+40%
Planned Capacity
Planned capacity about 40% higher than the original plan
RMB 3.0M
Annual Saving
Combined annual saving about 3.00 million CNY
NEV Composite Workshop Overall Planning Case Shandong, China-2
NEV Composite Workshop Overall Planning Case Shandong, China-1

Looking for a Similar Solution?

Explore our composite workshop overall planning and HP-RTM preforming line solutions for your manufacturing layout.

Plan Your Polyurethane Production Project

Our engineering team is ready to design a customized PU machinery solution that matches your production targets, quality standards, and investment plan. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.