Dual-Density Car Seat Foaming Line Solution Banner background

Dual-Density Car Seat Foaming Line Solution

Configure dual-density seat-foam production around the selected material systems, zone geometry, molding sequence and production target.

Complete Turnkey Solution for Dual-Density Seat Foaming

Dual-Density Car Seat Foaming Line Solution

With more than two decades in polyurethane complete equipment, Haifeng Polyurethane Machinery delivers a turnkey PU foaming line for dual-density car seats, built around one-shot dual-density molding, precise density control, flexible mixed-line efficiency and safety. The line integrates a 3-component dual-density high-pressure foaming machine, a pouring robot and a turntable line. One machine completes the dual-density pouring of the soft-density layer and the high-resilience support layer, enabling mixed-line foaming production of front seat, rear seat and headrest. Dosing accuracy reaches ≤±0.3% with density fluctuation of ≤±3%.

One-Shot Dual-Density

A four-component dual-chamber mixing head molds the soft layer and high-resilience layer in one shot on a single line.

Mixed-Line Flexibility

Front seat, rear seat and headrest foam on one line with one-click recipe changeover.

Customized to your seat mold and dual-density process, the turnkey line is delivered with factory commissioning, pilot production support and after-sales service for stable, high-quality output.

From Survey to After-Sales

Implementation Process

Our turnkey service covers the full journey from on-site survey and recipe design to commissioning, pilot production and long-term after-sales support.

01

Customized Solution Planning

Engineers survey on site and customize the solution based on seat mold structure, dual-density process, target cycle time and environmental standards.

DENSITY FLUCTUATION ≤±3%
02

Dual-Density Recipe Design

The R&D center completes customized dual-density recipe and mixing-index process design with feasibility verification.

DOSING ACCURACY ≤±0.3%
03

Turnkey Equipment Delivery

Core equipment including the 3-component dual-density foaming machine, pouring robot and turntable line is built in our factory, and field engineers complete installation and commissioning.

CYCLE ABOUT 60 S
Key Technical Specifications

Technical Parameters

Core equipment specifications for the dual-density high-pressure foaming machine and the dual-density process.

Line Composition
Equipment UnitQtyFunction
3-Component Dual-Density High-Pressure Foaming Machine1 set2 POLY + 1 ISO, four-component dual-chamber L-type mixing head, closed-loop metering
Pouring Robot1 setAutomatic pouring along set trajectories, uniform spreading and accurate positioning
Turntable Line1 setMulti-station turntable, cyclic operation: pouring–foaming–mold opening–part removal
Electrical Control System1 setPLC intelligent control with parameter setting, status monitoring and fault alarm
Dual-Density High-Pressure Foaming Machine
ParameterValue
ModelHF-HPM-2A1B-DualDensityCarSeat
Component configuration3 components: 2 polyether polyol tanks + 1 isocyanate tank
Mixing headFour-component L-type high-pressure mixing head with dual mixing chambers
Metering method3 metering units; flow meters + VFDs control output flow and mix ratio
Density adjustmentChange recipe or mixing index for two dual-density process routes
Pouring rate50–1000 g/s
Dosing accuracy≤±0.3%, full dynamic range
Tank configurationIndependent temp control + circulation stirring for each tank
Temperature control20–45℃
Mixing pressure10–18 MPa
Cleaning systemAutomatic air purge, solvent-free
Power5.5–7.5 kW
Control systemPLC + touch screen + multi-formula storage
Application systemDual-density cold-cure / high-resilience flexible foam system
Warranty1 year
CertificationCE, ISO9001
Dual-Density Foaming Process
ItemDescription
Component configuration2 polyether polyol tanks + 1 isocyanate tank
Mixing methodFour-component dual-chamber L-type mixing head, chambers adjusted independently
Metering control3 metering units with flow meters and VFDs
Density adjustmentChange recipe or mixing index to change foam density
Process routes2 density routes, switchable between soft layer and support layer
Mixed-line productionFront seat, rear seat and headrest on one line
Specifications are illustrative and customizable per project; contact our engineers for project-specific configuration.
Solution Advantages

Why Choose Haifeng's Dual-Density Seat Line

Engineered for one-shot dual-density molding, precise density control, flexible mixed-line efficiency and safety.

One-Shot Dual-Density

A four-component dual-chamber mixing head completes soft and high-resilience layers in one shot.

Precise Density Control

Dosing accuracy ≤±0.3% with density fluctuation ≤±3% for consistent seating feel.

Mixed-Line Flexibility

Front seat, rear seat and headrest foam on one line with one-click recipe changeover.

Lower Investment & Turnkey Delivery

One line replaces separate soft/hard lines, delivered with commissioning, training and after-sales support.

Case Studies

Related Projects

Explore how Haifeng's dual-density seat foaming line is deployed in automotive seating production.

View All Projects

Production Planning FAQ

Selection, supply scope and validation for this production route.

What is defined before selecting a dual-density seat line? +
Specify the required zones, foam systems, interfaces, shot masses and seat geometry. The feed and molding arrangement is defined for the selected construction.
Are density and seating hardness interchangeable? +
No. Density and load-deflection behavior are different properties. Define both with the selected specimen conditioning and test method.
How is the zone interface validated? +
Use representative molded seats to inspect the interface, zone dimensions, bonding and the required mechanical or comfort tests.
What is needed to estimate production capacity? +
Provide seat and mold drawings, material data, zone targets, cure residence, product mix and output requirements.

Get a Free Quote

Tell us your seat mold and dual-density process, and our engineers will provide a customized foaming line proposal. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Turnkey Installation & Training One-Shot Dual-Density Fast After-sales Support
Contact Our Team