Dry-Process Transfer Coating Solution Banner background

Dry-Process Transfer Coating Solution

Coordinate dry-process transfer coating, release-paper tension, drying and lamination for the selected leather construction.

Process configuration

High-Peel, Cold-Flex Mechanical Superiority for Athletic Footwear

Transfer coating forms the specified layers on release paper before drying, lamination and peeling. Tension control and coating geometry support stable application; they do not guarantee wrinkle-free or streak-free product. Cold flexing and peel strength are properties of the actual finished leather, not stand-alone coater ratings.

Defined supply scope

Define coating station types, paper/web handling, ovens and lamination interfaces. Dry-process does not establish solvent-free chemistry; material and cleaning arrangements must be selected explicitly.

Inputs for process selection

Layer build, release-paper and substrate data, coating weight/thickness, width, tension, ovens and lamination conditions.

Equipment scope, retained factory interfaces and acceptance are agreed for the selected material and part. Define coating station types, paper/web handling, ovens and lamination interfaces. Dry-process does not establish solvent-free chemistry; material and cleaning arrangements must be selected explicitly.

Production route

Dry-Process Transfer Coating Workflow

Prepare release paper and mixture → Control tension and coat → Dry and laminate → Peel and test. Define preparation, filling, cure and output timing separately for the selected configuration.

01

Prepare release paper and mixture

Confirm web, resin layers and substrate.

02

Control tension and coat

Validate tension and wet application across the usable width.

03

Dry and laminate

Coordinate residence, temperature and bonding conditions.

Process configuration

Reference Solution Engineering Envelope

Existing configuration and test references. Equipment settings, material results and finished-assembly results are separate; apply each value only to its documented configuration and conditions.

ParameterValue / UnitApplicable Configuration / Conditions
Working Web Coating WidthUp to 1,600 mmPrecision enclosed slot die and reverse roll stations
Release Paper Tension PrecisionWithin ±2.0 NClosed-loop servo floating dancer arm feedback
Liquid Coating Thickness Profile0.05 to 0.25 mmTolerance held strictly within ±1.5 µm across web
Cold-Flex Fatigue ResistanceGreater than 200,000 CyclesBally flexometer tested at -20°C under ISO 5423
Interfacial Peel Bond StrengthGreater than or equal to 60 N/3cmISO 2411 testing on high-density microfiber substrates
Synchronized Production Line Speed10.0 to 30.0 m/minMulti-zone hot air convection drying tunnels
Existing application note: Topcoat and adhesive circuits use their selected chemistries and rates. A dry-process route may use different formulation systems. Flex, peel and VOC performance apply to the selected substrate, coating thickness, conditioning and test method. Original process references, with their existing values: Web tension 120–150 N ± 2 N; Speed up to 30 m/min; confirm for selected material and tooling; Dry film 0.05–0.12 mm; Thickness tolerance ±1.5 µm; confirm for selected material and tooling; Primary oven 30m; Temperature 75–125°C; confirm for selected material and tooling; Nip pressure 0.6 MPa; Adhesive thickness 0.10 mm; confirm for selected material and tooling; Peel strength ≥ 60 N/3cm; Cold-flex > 200,000 cycles; confirm for selected material and tooling. The process example uses 1,420 mm release paper. The existing 85% reduction in paper-tear shutdowns is a comparison reference requiring operating records and a matched baseline, not a guaranteed effect of tension control. The original secondary-oven example is 24m. Confirm installed drying length, zones and usable residence for the actual web. Confirm the configuration, material, test method and cycle endpoints before using reference values as acceptance commitments.

Core Equipment for This Solution

Equipment references are selected by their documented process. Main metering, auxiliary supply and alternative routes are not a single standard package.

Process controls and application checks

Evaluate these functions with the selected material, tooling and production brief. Finished-part results require their own acceptance evidence.

Measured tension control

Set accepted variation, measuring location and response under the actual web conditions.

Defined thickness inspection

Separate wet application from dry thickness and agree cross-web sampling.

Finished-construction evidence

Use the actual layers and test method for flex and peel results.

Related Projects

These are related application references. Compare the actual material, process and delivered modules; reported project figures are not acceptance results for another line.

Review Project
Planning questions

Production Planning FAQ

Selection, supply scope and validation for this production route.

Does a slot die eliminate streaks? +
No. Material, filtration, die condition, web and drying affect appearance. Define an inspection and adjustment procedure.
How is a thickness tolerance accepted? +
State wet or dry basis, usable width, material, instrument, sampling and operating conditions.
What information is needed for a preliminary configuration? +
Layer build, release-paper and substrate data, coating weight/thickness, width, tension, ovens and lamination conditions. Identify the equipment and interfaces to retain, plus the required test and acceptance documents.

Discuss Your Production Goals

Share the following with your production brief: Layer build, release-paper and substrate data, coating weight/thickness, width, tension, ovens and lamination conditions. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Contact us

For how we handle your inquiry information, read our Privacy Policy.

Configuration review based on the application and material data Agreed equipment, interface and acceptance documentation Training and support defined for the supplied package
Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube