40ft Reefer Container Foaming Solution

Configure six-head PU delivery and vertical fixture interfaces for long reefer-container sidewall panels.

Process configuration

Monolithic Thermal Integrity for 40ft Global Intermodal Reefer Containers

Long reefer sidewalls need a defined skin construction, injection layout, head sequence, fixture restraint and cure. Combined chemical output is the complete system rate, not a per-head value. Container heat leakage and transport qualification require tests of the actual assembly and cannot be inferred from the foaming equipment alone.

Defined supply scope

Define the metering circuits, heads, vertical fixture, temperature control and safety interfaces. Different container lengths and skins require their own tool and changeover assessment.

Inputs for process selection

Container sidewall build, lengths/thicknesses, skins, total shot, head layout, fixture, blowing-agent system and thermal-test requirements.

Equipment scope, retained factory interfaces and acceptance are agreed for the selected material and part. Define the metering circuits, heads, vertical fixture, temperature control and safety interfaces. Different container lengths and skins require their own tool and changeover assessment.

Production route

40ft Reefer Container Foaming Workflow

Prepare and clamp the panel → Condition and balance feeds → Inject and cure → Demold and inspect. Define preparation, filling, cure and output timing separately for the selected configuration.

01

Prepare and clamp the panel

Confirm skins, dimensions, spacers, vents and fixture closure.

02

Condition and balance feeds

Review material conditions, head delivery and the total shot.

03

Inject and cure

Validate sequencing and fill along the long panel.

Process configuration

Reference Solution Engineering Envelope

Existing configuration and test references. Equipment settings, material results and finished-assembly results are separate; apply each value only to its documented configuration and conditions.

For wider production planning and related process routes, explore the Cold Chain PU Insulation Turnkey Plant.

ParameterValue / UnitApplicable Configuration / Conditions
Clamping Platen LengthUp to 13,500 mm (12.2m finished panel)Accommodates standard 40ft High-Cube reefer side walls
Clamping Pressure Resistance1.2 bar continuous side-wall counter-pressureHeavy-duty welded steel frame with hydraulic toggles
Combined Chemical Output80.0 to 240.0 kg/min — configuration referenceComplete six-head system total; confirm the selected flow with shot mass, duration, material and injection records
Container Heat Leakage RateU ≤ 0.32 W/(m²·K)reported under ATP international perishable transport rules
Panel Thickness UniformityWithin ±0.5 mm across 12.2m lengthPrecision-machined heated vertical clamping platens
In-Mold Foam Curing CycleLess than or equal to 20 minutesWater-heated platens maintained at 48°C ± 1°C
Existing application note: Shot mass, injection duration and combined output are agreed for the complete multi-head configuration. Whole-container heat transmission is evaluated for the finished assembly, separately from material conductivity and machine ratings. Original process references, with their existing values: Panel length up to 12.2 m; Clamping counter-pressure 1.2 bar; confirm for selected material and tooling; Tank temp 24°C ± 0.5°C; Metering pressure 15.0–17.5 MPa; confirm for selected material and tooling; Combined output reference 80–240 kg/min; shot mass and duration agreed for the selected configuration; Core thickness 60–100 mm; Platen temp 48°C ± 1°C; confirm for selected material and tooling; Panel parallelism ±0.5 mm; U-value ≤ 0.32 W/(m²·K); confirm for selected material and tooling. The process example includes a 70 mm core gap. The 1.2 Bar restraint reference concerns the panel fixture, not material-line pressure. Confirm the actual panel build, mold and cure sequence. Other original configuration examples include a 13.5-meter fixture, dual 500 L tanks, a 12-meter panel discussion and 20 minutes cure. Confirm actual panel dimensions, tank working volume and cycle boundary. Confirm the configuration, material, test method and cycle endpoints before using reference values as acceptance commitments.

Core Equipment for This Solution

Equipment references are selected by their documented process. Main metering, auxiliary supply and alternative routes are not a single standard package.

Process controls and application checks

Evaluate these functions with the selected material, tooling and production brief. Finished-part results require their own acceptance evidence.

Combined-flow clarity

Use total shot mass and duration to interpret the system output.

Long-tool coordination

Match platen envelope, restraints and injection points to the finished panel.

Assembly-level thermal evidence

Report heat leakage with the tested container construction and method.

Related Projects

These are related application references. Compare the actual material, process and delivered modules; reported project figures are not acceptance results for another line.

Review Project
Planning questions

Frequently Asked Questions

Can the system flow be multiplied by the number of heads? +
No. The published reference describes combined output; establish actual simultaneous-head delivery from shot records.
Does the listed heat-leakage value establish transport approval? +
No. Request the original report, tested assembly and applicable scope. Equipment configuration alone does not confer approval.
What information is needed for a preliminary configuration? +
Container sidewall build, lengths/thicknesses, skins, total shot, head layout, fixture, blowing-agent system and thermal-test requirements. Identify the equipment and interfaces to retain, plus the required test and acceptance documents.

Discuss Your Production Goals

Share the following with your production brief: Container sidewall build, lengths/thicknesses, skins, total shot, head layout, fixture, blowing-agent system and thermal-test requirements. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Contact us

For how we handle your inquiry information, read our Privacy Policy.

Configuration review based on the application and material data Agreed equipment, interface and acceptance documentation Training and support defined for the supplied package
Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube