Project Overview
Illustration notice. Process illustrations are not verified photographs of this installation.
Project reference basis. Figures and configuration details are reported in the supplied project brief. They are reference values for the stated application, rather than verified acceptance results or a guarantee for another installation. Confirm the source records, material, tooling, operating schedule and test method when assessing a comparable project.
A leading global intermodal container and logistics equipment giant in Qingdao deployed Haifeng’s 40-foot vertical reefer container foaming press station. The project was commissioned to establish an automated, monolithic side panel insulation line for standard 40ft High-Cube marine refrigerated containers.
Prior to the modernization, the manufacturer utilized horizontal casting beds. Pouring 110 kg of chemical mix horizontally across a 12.2-meter panel resulted in trapped air along the top corrugated skin and horizontal platen deflection, causing thickness deviations exceeding 3.5 mm at the center. These structural variances created thermal bridges upon container assembly, pushing total box heat leakage (U-value) past 0.38 W/(m²·K) and failing the strict ATP Class FRC international perishable transport agreement.
Haifeng engineered a complete vertical foaming cell centered on the HF-RFC40-VPR station. Featuring a 13.5-meter vertical hydraulic clamping frame and synchronous six-head impingement injection, the line eliminated horizontal platen deflection, holding 12-meter panel thickness deviations within ±0.5 mm and delivering assembled container thermal leakage coefficients of U ≤ 0.32 W/(m²·K).
Data limitations: The supplied chemical-shot reference is 110 kg. At the equipment reference maximum of 240 kg/min, constant delivery gives a calculated injection time of 27.5 s; actual project timing requires the shot record. Whole-container heat transmission is a finished-assembly test, not the material conductivity or machine rating; ATP-related claims need original assembly reports.
Concept illustration: Generated concept illustration for process discussion; not a photograph of the specified machine, a customer facility or a delivered project.
For process planning beyond this project reference, explore the 40ft Reefer Container Foaming Solution. The solution scope and configuration are selected for each application; this project does not establish performance for another installation.
Solutions Delivery
Configuration reported in the supplied brief.
Haifeng engineered an automated vertical clamping cell designed to process 12.2-meter composite panels. Exterior corrugated stainless steel sheets and interior lining plates are transferred into the vertical clamping bed, where heavy-duty hydraulic toggles lock the 13.5-meter platens under 1.2 bar continuous counter-pressure.
Raw materials—low-k cyclopentane polyol and polymeric isocyanates—are conditioned in twin 500 L jacketed tanks at 24°C under dry nitrogen blankets. Axial piston metering pumps displace chemicals at 17.0 MPa through six synchronized impingement mixing heads mounted along the bottom edge of the vertical tool.
The six-head configuration supplies a 110 kg reference shot within the selected 80–240 kg/min combined-output range. Actual shot duration follows the qualified flow profile and material window. The liquid creams and expands upward smoothly through the 70 mm vertical cavity, venting air naturally through top exhaust channels without forming pockets. Multi-circuit tempered water circulation (48°C) cures the core uniformly in 20 minutes. Following hydraulic unclamping, an overhead crane extracts the finished 12.2-meter panel, transferring it directly to container box assembly.
The supplied chemical-shot reference is 110 kg. At the equipment reference maximum of 240 kg/min, constant delivery gives a calculated injection time of 27.5 s; actual project timing requires the shot record. Whole-container heat transmission is a finished-assembly test, not the material conductivity or machine rating; ATP-related claims need original assembly reports.
| Equipment | Model | Qty | Function |
|---|---|---|---|
| 40ft Vertical Reefer Foaming Press | HF-RFC40-VPR | 1 complete unit | 13.5m vertical hydraulic clamping bed resisting 1.2 bar cavity pressure. |
| 6-Head High-Pressure Dosing Skid | HF-HPS-06 | 1 set | Core 17 MPa servo metering and 6-channel synchronized fluid delivery. |
| Multi-Zone Platen Water Heating Skid | HF-PWU-48 | 1 set | Closed-loop tempered water unit holding vertical platens at 48°C ± 1°C. |
| Overhead Panel Extraction Rig | HF-OER-12 | 1 unit | Automated crane gripper extracting finished 12-meter monolithic panels. |
Related Equipment Families
Catalog references describe related equipment families. The delivered model, auxiliaries and acceptance conditions follow the project configuration.