40ft Reefer Container Foaming Solution Banner background

Решение для вспенивания 40-футовых рефрижераторных контейнеров

Configure six-head PU delivery and vertical fixture interfaces for long reefer-container sidewall panels.

Конфигурация процесса

Monolithic Thermal Integrity for 40ft Global Intermodal Reefer Containers

Long reefer sidewalls need a defined skin construction, injection layout, head sequence, fixture restraint and cure. Combined chemical output is the complete system rate, not a per-head value. Container heat leakage and transport qualification require tests of the actual assembly and cannot be inferred from the foaming equipment alone.

Определенный объем поставки

Define the metering circuits, heads, vertical fixture, temperature control and safety interfaces. Different container lengths and skins require their own tool and changeover assessment.

Исходные данные для выбора процесса

Container sidewall build, lengths/thicknesses, skins, total shot, head layout, fixture, blowing-agent system and thermal-test requirements.

Equipment scope, retained factory interfaces and acceptance are agreed for the selected material and part. Define the metering circuits, heads, vertical fixture, temperature control and safety interfaces. Different container lengths and skins require their own tool and changeover assessment.

Производственный маршрут

40ft Reefer Container Foaming Workflow

Prepare and clamp the panel → Condition and balance feeds → Inject and cure → Demold and inspect. Define preparation, filling, cure and output timing separately for the selected configuration.

01

Prepare and clamp the panel

Confirm skins, dimensions, spacers, vents and fixture closure.

02

Condition and balance feeds

Review material conditions, head delivery and the total shot.

03

Inject and cure

Validate sequencing and fill along the long panel.

Конфигурация процесса

Технические характеристики эталонного решения

Существующая конфигурация и справочные данные испытаний. Настройки оборудования, результаты по материалам и результаты по готовой сборке приведены отдельно; применяйте каждое значение только к его задокументированной конфигурации и условиям.

Для более широкого планирования производства и ознакомления со смежными технологическими маршрутами изучите Cold Chain PU Insulation Turnkey Plant.

ПараметрЗначение / единица измеренияПрименимая конфигурация / условия
Clamping Platen LengthUp to 13,500 mm (12.2m finished panel)Accommodates standard 40ft High-Cube reefer side walls
Clamping Pressure Resistance1.2 bar continuous side-wall counter-pressureHeavy-duty welded steel frame with hydraulic toggles
Combined Chemical Output80.0 to 240.0 kg/min — configuration referenceComplete six-head system total; confirm the selected flow with shot mass, duration, material and injection records
Container Heat Leakage RateU ≤ 0.32 W/(m²·K)reported under ATP international perishable transport rules
Panel Thickness UniformityWithin ±0.5 mm across 12.2m lengthPrecision-machined heated vertical clamping platens
In-Mold Foam Curing CycleLess than or equal to 20 minutesWater-heated platens maintained at 48°C ± 1°C
Existing application note: Shot mass, injection duration and combined output are agreed for the complete multi-head configuration. Whole-container heat transmission is evaluated for the finished assembly, separately from material conductivity and machine ratings. Original process references, with their existing values: Panel length up to 12.2 m; Clamping counter-pressure 1.2 bar; confirm for selected material and tooling; Tank temp 24°C ± 0.5°C; Metering pressure 15.0–17.5 MPa; confirm for selected material and tooling; Combined output reference 80–240 kg/min; shot mass and duration agreed for the selected configuration; Core thickness 60–100 mm; Platen temp 48°C ± 1°C; confirm for selected material and tooling; Panel parallelism ±0.5 mm; U-value ≤ 0.32 W/(m²·K); confirm for selected material and tooling. The process example includes a 70 mm core gap. The 1.2 Bar restraint reference concerns the panel fixture, not material-line pressure. Confirm the actual panel build, mold and cure sequence. Other original configuration examples include a 13.5-meter fixture, dual 500 L tanks, a 12-meter panel discussion and 20 minutes cure. Confirm actual panel dimensions, tank working volume and cycle boundary. Confirm the configuration, material, test method and cycle endpoints before using reference values as acceptance commitments.

Основное оборудование для этого решения

Справочные данные по оборудованию выбираются по документированному для них процессу. Основное дозирование, вспомогательная подача и альтернативные схемы не являются единым стандартным комплексом.

Управление процессом и прикладные проверки

Оцените эти функции с учетом выбранного материала, оснастки и производственного задания. Для результатов готовых деталей требуется отдельное приемочное подтверждение.

Combined-flow clarity

Use total shot mass and duration to interpret the system output.

Long-tool coordination

Match platen envelope, restraints and injection points to the finished panel.

Assembly-level thermal evidence

Report heat leakage with the tested container construction and method.

Связанные проекты

Это справочные данные по родственным применениям. Сравнивайте фактические материалы, процесс и поставленные модули; приведенные показатели проекта не являются приемочными результатами для другой линии.

Смотреть проект
Вопросы планирования

Часто задаваемые вопросы

Can the system flow be multiplied by the number of heads? +
No. The published reference describes combined output; establish actual simultaneous-head delivery from shot records.
Does the listed heat-leakage value establish transport approval? +
No. Request the original report, tested assembly and applicable scope. Equipment configuration alone does not confer approval.
Какая информация необходима для предварительной конфигурации? +
Container sidewall build, lengths/thicknesses, skins, total shot, head layout, fixture, blowing-agent system and thermal-test requirements. Identify the equipment and interfaces to retain, plus the required test and acceptance documents.

Обсудите ваши производственные задачи

Share the following with your production brief: Container sidewall build, lengths/thicknesses, skins, total shot, head layout, fixture, blowing-agent system and thermal-test requirements. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Связаться с нами

О том, как мы обрабатываем информацию из вашего запроса, читайте в Политика конфиденциальности.

Анализ конфигурации на основе данных о применении и материалах Согласованная документация по оборудованию, интерфейсам и приёмке Обучение и поддержка, определённые для поставляемого комплекта
Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube