Premixing Station
169 Views

Cyclopentane Safety and Premixing System | PU Foaming

Cyclopentane storage/feed, premixing or inline blending and monitoring interfaces configured for a PU/PIR panel line. The project schedule defines supply boundaries and equipment documentation. Concept illustration — not a photograph of delivered equipment or a customer installation.

Pentane Dosing Range

2–15 kg/min supplied reference; match formulation and actual panel duty

Feed Pressure

10 – 25 bar (Metering feed pressure)

Accuracy Reference

±0.2% (Coriolis mass flowmeter)

Electrical Supply

380 V / 50 Hz reference; enclosure and electrical suitability from ordered documents

Availability on Request Delivery Schedule on Quotation 1-Year Warranty
Sandwich Panel Production Equipment

Product Overview

The HF-PENT-SAFE reference coordinates cyclopentane feed and blending with the PU/PIR metering system. Storage, transfer, tank conditioning, detection, ventilation and stop/isolation functions are identified in the project supply schedule. Actual hazardous-area suitability, equipment documentation and commissioning tests are reviewed for the ordered installation; this page does not establish an ATEX certificate or prescribe alarm thresholds.

Concept illustration — not a photograph of delivered equipment or a customer installation.

See the industrial panel solution for production-line integration.

Concept illustration of an enclosed premixing skid with vessels, pipework, ventilation ducting and control panels

Need a quote for this equipment?

Request a Quote
HF-PENT-SAFE

Technical Specifications

Technical Parameter HF-PENT-SAFE
Accuracy Reference ±0.2% (Coriolis mass flowmeter)
Power Supply 380 V / 50 Hz reference; enclosure and electrical suitability from ordered documents
Working Pressure 10 – 25 bar (Metering feed pressure)
Pentane Dosing Range 2–15 kg/min supplied reference; match formulation and actual panel duty
Monitoring and Interlocks Project-specific detection, ventilation, feed isolation and stop actions
Equipment Documentation Hazardous-area suitability and certificates reviewed for ordered configuration

Key Features

Configured Feed and Blending

Metering and mixing arrangement selected for polyol formulation and line demand.

Monitored Interfaces

Detection, ventilation and stop/isolation signals are coordinated with site and line controls.

Defined Supply Scope

Storage, transfer, nitrogen and ventilation duties are identified as supplied, optional or site-provided.

Discuss Your Equipment Configuration

Share your product, materials, tooling and production requirements so we can review the equipment and interfaces for your project.

Frequently Asked Questions

How is cyclopentane introduced?
Select a documented premixing or inline blending arrangement and calibrate the material streams for the selected formulation.
How are detection and stop actions specified?
The approved project design defines monitoring, isolation, ventilation and interlock actions. Thresholds and response times require installed-system validation and are not prescribed on this page.
Can the system be integrated with an existing line?
Review material compatibility, metering turndown, interfaces and site services before defining a retrofit package.
Does this page establish a certificate or environmental classification?
No. Applicable equipment certificates and material data are reviewed separately for the supplied configuration and blowing-agent formulation.

Ready to discuss your project?

Contact Our Team
Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube