Cyclopentane storage/feed, premixing or inline blending and monitoring interfaces configured for a PU/PIR panel line. The project schedule defines supply boundaries and equipment documentation. Concept illustration — not a photograph of delivered equipment or a customer installation.
Pentane Dosing Range
2–15 kg/min supplied reference; match formulation and actual panel duty
Feed Pressure
10 – 25 bar (Metering feed pressure)
Accuracy Reference
±0.2% (Coriolis mass flowmeter)
Electrical Supply
380 V / 50 Hz reference; enclosure and electrical suitability from ordered documents
Product Overview
The HF-PENT-SAFE reference coordinates cyclopentane feed and blending with the PU/PIR metering system. Storage, transfer, tank conditioning, detection, ventilation and stop/isolation functions are identified in the project supply schedule. Actual hazardous-area suitability, equipment documentation and commissioning tests are reviewed for the ordered installation; this page does not establish an ATEX certificate or prescribe alarm thresholds.
Concept illustration — not a photograph of delivered equipment or a customer installation.
See the industrial panel solution for production-line integration.
Need a quote for this equipment?
Request a QuoteTechnical Specifications
| Technical Parameter | HF-PENT-SAFE |
|---|---|
| Accuracy Reference | ±0.2% (Coriolis mass flowmeter) |
| Power Supply | 380 V / 50 Hz reference; enclosure and electrical suitability from ordered documents |
| Working Pressure | 10 – 25 bar (Metering feed pressure) |
| Pentane Dosing Range | 2–15 kg/min supplied reference; match formulation and actual panel duty |
| Monitoring and Interlocks | Project-specific detection, ventilation, feed isolation and stop actions |
| Equipment Documentation | Hazardous-area suitability and certificates reviewed for ordered configuration |
Key Features
Configured Feed and Blending
Metering and mixing arrangement selected for polyol formulation and line demand.
Monitored Interfaces
Detection, ventilation and stop/isolation signals are coordinated with site and line controls.
Defined Supply Scope
Storage, transfer, nitrogen and ventilation duties are identified as supplied, optional or site-provided.
Discuss Your Equipment Configuration
Share your product, materials, tooling and production requirements so we can review the equipment and interfaces for your project.
Related Production Systems
Frequently Asked Questions
How is cyclopentane introduced?
How are detection and stop actions specified?
Can the system be integrated with an existing line?
Does this page establish a certificate or environmental classification?
Ready to discuss your project?
Contact Our Team