Wet-Process PU Synthetic Leather Production Solution Banner background

Wet-Process PU Synthetic Leather Production Solution

Explore wet-process PU synthetic leather production, including coating, water-bath coagulation, washing, solvent-recovery interfaces and line controls.

Efficient, environmentally friendly, and flexible production using wet-processed leather.

Wet-Process PU Synthetic Leather Production Solution

Wet-processed PU synthetic leather is widely used in automotive interiors, handbags, and footwear. Traditional wet-processing lines rely on manual adjustment of process parameters, resulting in inconsistent film quality, limited production speed, and long changeover times. Furthermore, the low DMF recovery efficiency poses environmental risks, and the resulting product lacks the durability and quality demanded by high-end brands. The Hai Feng wet-processing PU synthetic leather solution centers around an intelligent wet-processing line, combined with a three-stage DMF recovery system and a fully digitalized control platform. This allows for the establishment of a complete, automated production line or the modular upgrade of existing lines. The solution includes specialized PU formulations, online quality control, and certification documentation, ensuring stable production of high-quality, environmentally friendly, and compliant wet-processed leather.

Solvent-Recovery and Emissions Interfaces

A specified three-stage DMF recovery system can be integrated into the wet route. Recovery rate, exhaust emissions and workplace exposure are separate measurements with their own sampling points and operating conditions.

Efficient and flexible re-manufacturing

Complete specification changes can be implemented in ≤1 hour, reducing material waste and enabling the production of small-batch, customized orders across multiple product lines.

Separate coating, coagulation, washing and solvent recovery when defining a wet-process project. A retrofit should identify retained tanks, new circulation and monitoring, recovery-plant capacity, wastewater and extraction interfaces, together with the permitted shutdown.

Manufacturing Workflow

Wet-process leather manufacturing process

A fully automated wet-process leather production process, from raw material preparation to final product sampling and verification, ensures continuous and stable production.

01

Base fabric pretreatment process

Complete the substrate preparation, including substrate release, leveling, and stress stabilization, to create a suitable surface for applying the coating.

CONTROLLABLE SUBSTRATE TENSION
02

The paste application process

Prepare and meter the selected PU paste under agreed component-ratio, viscosity and temperature conditions. Coating thickness or coat weight is checked separately using the specified cross-web and machine-direction sampling plan.

COMPONENT-RATIO REFERENCE ±0.8%; COATING UNIFORMITY ACCEPTED BY THE AGREED MEASUREMENT METHOD
03

Water bath solidification process

The coated substrate enters the aqueous coagulation bath. Solvent exchanges with water, causing phase separation and formation of the porous PU layer. Bath composition, temperature and residence time are defined for the selected paste.

COAGULATION-BATH COMPOSITION, TEMPERATURE AND RESIDENCE TIME DEFINED FOR THE PASTE
Technical specifications

Main technical specifications

Core technical parameters for the wet-process synthetic leather production line. The following values represent the design targets; actual performance may vary depending on the PU resin, backing material, and operating conditions.

Parameter options Parameter values
Coating Line Speed20–25 m/min — configuration reference; confirm for the selected paste, working width and coating construction
Component-Ratio Tolerance±0.8% reference for the selected paste-preparation system; measurement basis, ratio range and operating conditions agreed for acceptance
Coating Uniformity AcceptanceDefine thickness or coat-weight tolerance, cross-web/machine-direction sampling, conditioning and the acceptance method for the selected coating
Third-tier DMF recovery rate ≥95%
Emission AssessmentConcentration and limits defined for the specified sampling point, operating state and applicable assessment; measured separately from solvent-recovery rate
Time required for full specification change ≤ 1 hour
Target finished product pass rate ≥98%
Target defect rate ≤2%
Finished product: 23°C bend resistance ≥ 200,000 times
Associated unit Key processes include: pre-processing, online intelligent quality control, and a three-stage DMF recovery system.
Values on this solution page must be confirmed for the selected material, product, test method and operating conditions in the project proposal. Existing project records are specific to their own configurations.
Metering, Mixing & Line Equipment

Equipment for Integrated solution for wet-process synthetic leather production

The coagulation/washing equipment is distinct from the distillation, wastewater and ventilation systems; identify which modules are supplied or retained.

Key Advantages

Key features of the plan

The complete wet-cast leather production line offers a comprehensive advantage in terms of quality, environmental friendliness, flexibility, and technical service, enabling customers to consistently produce high-quality leather.

Achieve consistent film quality.

Precise viscosity and coating control minimize pinholes and cracks, resulting in uniform film formation and improved durability of the finished product.

Configured DMF Recovery Interfaces

Coordinate solvent collection, recovery and wastewater responsibilities within the ordered line. Recovery efficiency and emissions are validated separately; a recovery percentage does not establish workplace or site-wide compliance.

Efficient and flexible production

Quickly adapts to various types of leather, including car leather, luggage leather, and shoe leather. Also supports the modular modification of existing production lines, reducing project costs.

End-to-end implementation services

Customized solutions, formulation adaptation, DMF system integration, sample testing, and assistance with certification documentation, along with long-term maintenance and support.

Application evidence

Related Projects

The linked energy retrofit concerns its documented washing and recovery interfaces; compare only the same production and measurement boundary.

View Record
Production Planning Questions

Questions About Integrated solution for wet-process synthetic leather production

Find answers about Integrated solution for wet-process synthetic leather production, including material selection, equipment configuration and the information needed to plan a production line.

Is solvent recovery part of the same equipment package? +
Recovery and wastewater interfaces must be explicitly included in the proposal. They cannot be inferred from a metering/coating machine listing.
What information is needed to size the production line? +
Fabric and resin data, coating mass, tank layout, wash flows, DMF measurements, recovery capacity, utilities and shutdown window. Identify retained equipment, the working schedule and required acceptance documents.
What is included in the equipment package? +
The coagulation/washing equipment is distinct from the distillation, wastewater and ventilation systems; identify which modules are supplied or retained. Separate coating, coagulation, washing and solvent recovery when defining a wet-process project. A retrofit should identify retained tanks, new circulation and monitoring, recovery-plant capacity, wastewater and extraction interfaces, together with the permitted shutdown.
Are cycle time and finished-product performance fixed? +
They are established for the selected material, geometry, tooling and acceptance tests. The proposal identifies target conditions and the validation needed before a final performance commitment.
How is coating uniformity accepted? +
Select thickness or coat weight as the measured quantity. Agree on positions across and along the web, conditioning, sample count, tolerance and the acceptance method; do not use an undefined percentage.
Does the DMF recovery rate establish emission compliance? +
No. Recovery efficiency, exhaust concentration and workplace exposure require different measurements. Define the sampling point, operating state, method and applicable requirements for each.
What should be agreed at the interface to the DMF recovery plant? +
Define liquor flow, concentration, temperature and transfer points, plus the mass-balance and utility measurements. Recovery percentage, residual DMF and workplace emissions use different measurement boundaries.

Submit Your Production Goals

Share the following for this application: Fabric and resin data, coating mass, tank layout, wash flows, DMF measurements, recovery capacity, utilities and shutdown window. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Contact us

For how we handle your inquiry information, read our Privacy Policy.

Response Schedule Confirmed on Request No Obligation Quote NDA Available
Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube