Rotary-Table Car Seat Cushion Foaming Line Upgrade Case | Jiangxi

A Jiangxi car seat cushion upgrade combining high-pressure PU foaming, a rotary table, mold temperature control and robotic pouring.

Rotary-Table Car Seat Cushion Foaming Line Upgrade in Jiangxi

Project Background Located in an auto parts industrial park in Jiangxi Province, the customer is a manufacturer specializing in automobile seat cushions, producing about 750,000 cushion and backrest foamed parts per year with revenue of about RMB 210 million in 2025. Challenges The old lines ran a slow 60 s cycle in a single fixed mode, with density fluctuation of ±10%, a defect rate of 8%–12% and changeover time over 1 hour. Haifeng Solution The customer adopted the Haifeng turnkey rotary-table car seat cushion PU foaming line, integrating an HF-HPM high-pressure foaming machine, a rotary table line with mold temperature control and a pouring robot. Results Per-line capacity rose about 67%, density fluctuation fell to ≤±3%, defect rate to ≤2%, manpower dropped from 18 to 9, with annual savings of about RMB 2.33 million and a payback period of about 3.3 years.

Turnkey Line Configuration

The customer selected the Haifeng rotary-table car seat cushion PU foaming line turnkey solution, consisting of an HF-HPM high-pressure foaming machine, a rotary table line with mold carriers and mold temperature controller, and a pouring robot.

EquipmentModelQtyFunction
HF-HPM Series High-Pressure Foaming Machine (Rotary-Table Cushion)HF-HPM-1A1B-CushionRotary1 setTwo-component high-pressure impingement mixing & metered pouring, dosing accuracy ≤±0.3%
Rotary Table Line (with mold carriers & mold temperature controller)1 setIntermittent/continuous production, VFD speed control, manual/automatic mold carrier opening & closing, automatic mold number identification
Pouring Robot1 setAutomatic pouring along set trajectories, uniform spreading and accurate positioning
Electrical Control System1 setPLC intelligent control, separable step debugging, on-line debugging without stopping

Upgrade Results

+67%
Per-Line Capacity
Per-line capacity up from about 1,200 to 2,000 pcs/day
≤2%
Finished-Product Defect Rate
Project-reported defect rate reduced from 8%–12% to ≤2%. Figures apply to the stated project conditions; no single relative reduction is inferred from the baseline range.
-50%
Manpower
Operators cut from 18 to 9
Rotary-Table Car Seat Cushion Foaming Line Upgrade Case Jiangxi-1
Rotary-Table Car Seat Cushion Foaming Line Upgrade Case Jiangxi-2
Rotary-Table Car Seat Cushion Foaming Line Upgrade Case Jiangxi-3

Looking for a Similar Solution?

Explore our turnkey rotary-table car seat cushion foaming line to upgrade your seating production.

Plan Your Polyurethane Production Project