Polyurethane Machinery &Equipment
74 Views

PU Elastomer Casting Machine | Road Construction

The HF-CPUE-2A2B-Cons-Road is a PU elastomer casting machine for road crack filling and pavement maintenance, with 2A2B two-component metering, wear-resistant additive dosing and fast-curing BDO system.

Pouring Rate

100~1800 g/s

Dynamic Metering Accuracy

≤±0.3% (Full range)

Tank Capacity

220 / 300 L

Pouring Pressure

0.8~2.5 MPa

Availability on Request Delivery Schedule on Quotation 1-Year Warranty
PRODUCT OVERVIEW

PU Elastomer Metering for Road-Maintenance Applications

Configured heated preparation, metering and dispensing for selected PU road-maintenance formulations.

The HF-CPUE-2A2B-Cons-Road is a PU elastomer metering and casting configuration for agreed road-maintenance applications. The supplied reference lists prepolymer and BDO processing, heated material preparation, dynamic mixing and controlled dispensing.

Crack or joint geometry, substrate preparation, material viscosity, reaction window and curing conditions define the selected equipment and site procedure. Bonding, movement capability and return-to-service requirements are established for the actual formulation and installation.

PU Elastomer Metering for Road-Maintenance Applications

Configured

To Your Production Brief

Working Sequence

Define Material and Site Conditions

Review the selected prepolymer/curative formulation, repair geometry, substrate condition and available site utilities.

Condition and Calibrate

Establish material temperature, circulation and component delivery for the agreed recipe and operating flow.

Meter, Mix and Dispense

Dynamically mix and dispense the selected PU system through the configured outlet and site tooling.

Cure and Inspect

Follow the material cure procedure and inspect the repair against the agreed application requirements.

DETAILS

Technical Specifications

The listed values are configuration references. Component identities, material temperatures, dosing range, site interfaces and acceptance methods are agreed for the selected road-maintenance formulation.

Technical ParameterHF-CPUE-2A2B-Cons-Road
Pouring Rate100~1800 g/s
Raw Material RatioPolyurethane Prepolymer : BDO Curing Agent = 100:4~7
Tank Capacity220 / 300 L
Mixing Head Speed6000~10000 r/min
Dynamic Metering Accuracy≤±0.3% (Full range)
Tank Configuration2A2B two-component + wear-resistant additive tank
Material Temperature ControlTank A: 30~80℃; Tank B(BDO): 25~50℃
Pouring Pressure0.8~2.5 MPa
Cleaning SystemHigh-pressure circulation cleaning + air purge cleaning
Control SystemPLC + touch screen + multi-formula storage
Applicable SystemPolyurethane Elastomer System
Warranty1 year
CertificationsConfirm applicable documents for the quoted configuration
WHY CHOOSE US

Key Features

Advanced engineering delivers measurable advantages in productivity, quality, and operational efficiency.

Heated Material Preparation

Component conditioning follows the selected prepolymer and curative processing windows.

Component Metering

Calibrate delivery and ratio at the agreed viscosity, temperature and flow; finished repair performance is assessed separately.

Configured Dispensing

Outlet, hose and tooling interfaces are selected for the repair geometry and material reaction window.

Recipe and Alarm Controls

The configured PLC records settings and provides equipment alarms for the selected supply package.

Defined Supply Interfaces

Agree material preparation, dispensing, site utilities, substrate preparation and curing responsibilities.

Application-Specific Acceptance

Bonding, movement, dimensional and return-to-service checks follow the material and project requirements.

MORE EQUIPMENT

Browse other equipment in our catalog. These listings are for product discovery; compatibility and production-line scope are confirmed separately for your material, process and output requirements.

SUPPORT

Frequently Asked Questions

What does this equipment supply?
It supplies configured material preparation, metering, dynamic mixing and dispensing for the selected PU road-maintenance application. Substrate preparation and the final repair are defined separately.
Which material data are needed?
Provide prepolymer and curative data, viscosity and processing temperatures, mixing ratio, reaction window and the intended repair geometry.
Does metering accuracy guarantee repair life?
No. Service performance also depends on material selection, substrate preparation, cure and the agreed application tests.
What information should accompany an inquiry?
Send the repair dimensions, material data, target dispensing rate, site conditions and required inspection criteria.