Low Pressure Polyurethane Machine
66 Views

Low-Pressure PU Foaming Machine | OTR Solid Tires

Compact PU system for OTR solid tires, with IBC direct feed, plunger metering (±0.3%), static mixing, pressure safety control, and complete air treatment system.

Discharge Flow Rate

300~1000 L/h

Mix Ratio (A:B)

100 : 100

Metering Accuracy

±0.3%

Working Pressure

0~2 MPa

Availability on Request Delivery Schedule on Quotation 1‑Year Warranty
Engineered for Durable, High‑Performance OTR Solid Tires

Product Overview

The HF‑LPM‑1A1B‑OTR is a compact PU system for OTR solid tires, featuring IBC direct feed, plunger metering (±0.3%), static mixing, and complete air treatment.

The HF-LPM-1A1B-OTR is a compact low-pressure PU foaming system for manufacturing OTR polyurethane solid tires with two-component raw materials. Two independent metering units draw materials directly from IBC totes for uninterrupted supply. Plunger metering pumps with variable frequency motors deliver ±0.3% accuracy, with flow rate adjusted by motor speed to suit various formulations. Materials blend in a leak-proof, anti-clogging static mixer, and a glue shut-off valve at the outlet connects quickly to tire air nozzles. Working pressure is limited within 0–2 MPa, with automatic injection stop and alarm once the threshold is exceeded. Each pipeline is fitted with a 300 μm mesh filter to block impurities. PLC control with HMI touch panel displays real-time flow rates, sampling duration, component pressure and post-filling tire pressure, with multi-level fault detection and audio-visual alarms for automatic shutdown under critical faults. Separate pipelines deliver raw materials and compressed air, the latter pre-treated through oil-water separators and oil mist eliminators for clean, dry supply. Remote injection start/stop and reserved remote maintenance ports support convenient after-sales service.

Product Overview

0.3

Metering Accuracy (±%)

Production Workflow

Raw Material Feeding from IBC Totes

Two independent metering units draw polyurethane components A and B directly from IBC tote tanks for continuous production.

High‑Precision Metering & Ratio Setting

Plunger metering pumps with VFD control deliver ±0.3% accuracy; flow rate is adjusted per formula (standard A:B = 100:100).

Static Mixing & Tire Filling

Materials pass through 300μm filters and blend in the static mixer; mixed PU is pumped into tire cavities via glue shut‑off valve connected to tire air nozzles.

Pressure Control, Venting & Curing

Complete tire filling is achieved through controlled pressure (0‑2 MPa) and venting; overpressure triggers automatic shutdown and alarms.

Precision parameters for durable, reliable OTR solid tires

Technical Specifications

Specifications are based on standard configurations. Custom flow rates, tank sizes, and remote maintenance interfaces available upon request.

Technical ParameterHF-LPM-1A1B-OTR
Discharge Flow Rate300–1000 L/h
Raw Material Mix RatioA:B = 100:100
Tank Volume30 L
Total Motor Power2.2 kW
Metering Accuracy±0.3%
Working Pressure0–2 MPa
Filtration300 μm mesh filter per pipeline
Weight160–180 kg
Warranty Period1 year
CertificationsConfirm applicable documents for the quoted configuration
Brand NameHaifeng
Why Choose Our OTR Solid Tire PU System

Key Advantages

Six engineering and production benefits that deliver durable, high‑performance OTR solid tires with precision control, safety protection, and easy maintenance.

High‑Precision Plunger Metering & Stable Delivery

Plunger metering pumps with variable frequency motors deliver ±0.3% accuracy. Flow rate is precisely regulated to meet various mixing ratios, ensuring consistent tire quality across batches.

Wide Flow Range for Versatile Production

Discharge flow rate from 300 to 1000 L/h covers a broad range of OTR tire sizes and filling requirements, from smaller agricultural tires to large mining equipment tires.

Superior Filtration & Anti‑Clog Static Mixing

300 μm mesh filters on each pipeline block impurities effectively. The static mixer offers leak‑proof, anti‑clogging performance with easy cleaning and maintenance.

Intelligent PLC Control with Comprehensive Safety Protection

PLC + HMI touch panel displays real‑time flow rates, pressure, and tire fill status. Multi‑level fault detection with audio‑visual alarms and automatic shutdown protects equipment and ensures safety.

Complete Air Treatment System for Clean Operation

Separate compressed air pipelines with oil‑water separators and oil mist eliminators deliver clean, dry air—critical for consistent PU curing and preventing contamination.

Compact Design with Remote Operation & Maintenance

Lightweight (160‑180 kg) and compact footprint fits easily into existing workshops. Remote injection start/stop switches and reserved remote maintenance ports enable convenient after‑sales support.

COMPLETE SOLUTION

Integrate the product with our full range of auxiliary equipment for a turnkey polyurethane processing system.

SUPPORT

Frequently Asked Questions

What types of OTR tires can this machine produce?
This machine is designed for manufacturing OTR polyurethane solid tires used in construction equipment, mining machinery, agricultural vehicles, forklifts, and other off‑road applications. The flow rate range of 300‑1000 L/h accommodates various tire sizes from small agricultural tires to large mining tires.
How does the machine achieve ±0.3% metering accuracy?
The machine uses plunger metering pumps driven by variable frequency motors. Motor speed can be precisely regulated to adjust flow rate, while the PLC monitors and controls the output in real time to maintain the A:B ratio at 100:100 with ±0.3% accuracy.
How does the pressure safety system work?
The working pressure of raw materials is limited within 0‑2 MPa. The system continuously monitors pressure; if the pressure exceeds the threshold, the machine automatically stops injection and triggers audio‑visual alarms to alert operators—protecting both equipment and tire integrity.
Why is the air treatment system important for this application?
Compressed air is used for tire filling and pressure control. The oil‑water separator and oil mist eliminator remove moisture and contaminants from the air supply, ensuring clean, dry air that prevents contamination of the PU material and ensures consistent tire quality.
What is the typical installation and training timeline?
Due to the compact and modular design, on‑site installation, commissioning, and operator training can be completed within 3‑5 working days after machine arrival. Trial runs with your specific tire formulations take an additional 2‑3 days to confirm stable production parameters.