Shreds foam offcuts and suitable textile scraps for rebond foam preparation. The described cutting assembly uses three rotary cutter rows and four stationary cutter rows with a cooling-water circulation arrangement.

Equipment

Heavy Duty Foam Scrap Shredder

Application

Rebond Foam Preparation

Configuration

1 listed option

Application Review Configuration on Request
Rebond Foam Preparation

Product Overview

Shreds foam offcuts and suitable textile scraps for rebond foam preparation. The described cutting assembly uses three rotary cutter rows and four stationary cutter rows with a cooling-water circulation arrangement.

Shreds foam offcuts and suitable textile scraps for rebond foam preparation. The described cutting assembly uses three rotary cutter rows and four stationary cutter rows with a cooling-water circulation arrangement.

Review the material, dimensions, handling sequence and interface requirements with Haifeng to define the final supply scope.

Reference photographs have been reconstructed for clarity. Check equipment details against the approved configuration and drawings.

Review this equipment within the Sponge Foam Turnkey Plant. Compare the Continuous Slabstock Foaming Solution for upstream foam production; cutting, recycling and packaging equipment are separate downstream modules.

Product Overview

Haifeng

Rebond Foam Preparation

Equipment Selection and Integration

Define the Material

Provide the foam type, density, input dimensions and intended finished product.

Select the Configuration

Confirm the working envelope, material-handling arrangement and required options.

Review Process Interfaces

Coordinate upstream preparation, this equipment operation and downstream receiving.

Agree Acceptance Conditions

Define sample trials, settings, measurement method and final supply scope.

Equipment Configuration

Technical Specifications

Listed values describe reference configurations. Final capacity, finished dimensions and tolerances depend on the selected material, settings and acceptance conditions. Confirm site utilities and access clearances before layout approval.

Technical ParameterConfiguration A
Dimensions (L×W×H)2250 × 1850 × 1800 mm
Listed output500–1200 kg/h, reference
Feed opening650 × 500 mm
Rotary diameter380 mm
Rotary cutter arrangement3 rows × 1 set
Stationary cutter arrangement4 rows × 1 set
Screen opening range8–40 mm
Total power35.5 kW
Rebond Foam Preparation

Equipment Functions

Functions described for the listed arrangement. Optional items require confirmation in the final supply scope.

Three rotary cutter rows

Included in the described equipment arrangement; confirm implementation for the selected configuration.

Four stationary cutter rows

Included in the described equipment arrangement; confirm implementation for the selected configuration.

Interchangeable screens

Included in the described equipment arrangement; confirm implementation for the selected configuration.

Cooling-water circulation

Included in the described equipment arrangement; confirm implementation for the selected configuration.

Foam Production and Finishing

Compare equipment options for the selected process. Not every listed machine is required for every project.

Equipment Selection

Frequently Asked Questions

What is this equipment used for?
Shreds foam offcuts and suitable textile scraps for rebond foam preparation. The described cutting assembly uses three rotary cutter rows and four stationary cutter rows with a cooling-water circulation arrangement.
Which configuration should I select?
Provide input material, density, block or web dimensions, finished geometry, target production schedule and available factory space. Haifeng will review the working envelope and process interfaces.
Are all listed rates and tolerances guaranteed?
Listed technical values are reference configuration data. Confirm material conditions, operating settings, trials and acceptance criteria for the final order.
What must be confirmed before installation?
Confirm the electrical supply, utilities, guarding, access clearances, loading method and included auxiliary equipment.