Underground Tunnel Polyurea Solution Banner background

Underground Tunnel Polyurea Solution

A mobile dual-circuit package for primer application and two-component polyurea waterproofing, with configured surface-conditioning interfaces.

Production Line Planning

Seamless Elastomeric Defense for Subterranean Lifeline Infrastructure

A mobile dual-circuit package for primer application and two-component polyurea waterproofing, with configured surface-conditioning interfaces. The package covers the mobile spray chassis, infrared surface-conditioning module, separate primer and polyurea circuits, gun and controls. Generation and laser-guided scanning are optional. Coating and primer are supplied separately; lighting and drainage are customer interfaces. Site ventilation, exposure control and access arrangements are addressed separately from formulation solids content.

Mobile Dual-Circuit Package

The primer and polyurea circuits are separately configured on the specified mobile chassis.

Surface-Conditioning Interfaces

Preparation, drying and priming are selected for the substrate and coating supplier requirements.

Confirm vehicle access, tunnel section, joints and work-window organization before selecting the mobile package. Primer and polyurea paths remain separate; drying, gel, cure and readiness for water pressure have different acceptance points.

Manufacturing Workflow

Turnkey Underground Waterproofing Process

A configured sequence of substrate preparation, material conditioning, application, cure and inspection for the selected coating system.

01

Joint Preparation & Debris Evacuation

Concrete joints and walls are mechanically ground to remove laitance, followed by vacuum cleaning and installing backing rods in 20 mm expansion bevels.

SURFACE PROFILE CSP 3–5; JOINT BEVEL WIDTH 20 MM
02

Vehicle Infrared Flash-Drying

The specified surface-conditioning module is used within the substrate and primer supplier requirements. A single surface reading is not assumed to establish bulk dryness or adhesion suitability.

SURFACE MOISTURE < 6%; SURFACE TEMP 40–50°C
03

Medium-Pressure Capillary Primer Sealing

An airless priming circuit applies moisture-tolerant penetrating epoxy primer, sealing microscopic concrete pores to prevent subsequent outgassing.

PRIMER DRY FILM 70–90 µM; CURE TIME 10–15 MIN
Configuration & Process Parameters

Reference Solution Engineering Envelope

Supplied configuration and coating-system references. Values depend on the stated material, substrate, test and operating conditions.

ParameterValue / UnitApplicable Configuration / Conditions
Subterranean Daily OutputUp to 1,200 m²Mobile self-propelled dual-circuit spray vehicle; shift length, coating thickness and good-area counting require confirmation
Polyurea Working Pressure16.0 to 18.0 MPaHeavy-duty hydraulic proportioning skid
Membrane Tensile ElongationGreater than 450%ASTM D412 test on cured pure polyurea; supplied material/test result requires original specimen, method and report
Dynamic Crack BridgingUp to 2.0 mm fissureCyclic concrete joint movement testing; supplied material/test result requires original specimen, method and report
Hydrostatic Resistance Head0.5 MPa (50m water head)Sustained 72 hours under GB 50108 test cell; supplied material/test result requires original specimen, method and report
Vehicle Operating Dimensions4.2m length x 1.75m widthNavigates standard 2.5m utility tunnel compartments
Vehicle track gauge, chemical drum payload capacities, and infrared lamp wattage are customized according to utility tunnel bay cross-sections. Values are configuration references and require confirmation under the stated material and operating conditions.
Metering, Mixing & Line Equipment

Core Equipment for This Solution

The mobile dual-circuit reference includes its specified chassis and surface-conditioning modules; generation and guided scanning are selected options.

Engineering Considerations

Core Advantages of Haifeng Tunnel Solutions

Configured process mechanisms and project interfaces for the selected equipment package.

Mobile Dual-Circuit Package

The primer and polyurea circuits are separately configured on the specified mobile chassis.

Surface-Conditioning Interfaces

Preparation, drying and priming are selected for the substrate and coating supplier requirements.

Joint-System Design

Movement capacity depends on the complete joint detail, reinforcement and tested coating build-up.

Waterproofing Verification

Hydrostatic performance and application output require defined specimens, curing conditions and project records.

Related Applications & Projects

Related Projects

The utility-tunnel project supports its defined substrate, membrane and work arrangement. Material elongation or crack-bridging is separate from complete-system watertightness.

Review Project
Production Planning Questions

Frequently Asked Questions

Find answers about Underground Tunnel Polyurea Solution, including material selection, equipment configuration and the information needed to plan a production line.

How is a tunnel waterproofing system selected? +
Coating, primer, joint detail, substrate preparation and reinforcement are selected as a complete system. Adhesion and water-tracking performance require the actual substrate and test conditions.
How is vehicle access confirmed? +
The supplied 1.75 m vehicle width is a reference. Tunnel turns, gradients, clearance, equipment obstructions and required access space must be checked in the site layout.
How are gel time, cure and readiness for water pressure separated? +
Gel, tack-free, handling and full-cure conditions are different milestones. Readiness for flooding, backfilling or hydrostatic testing is confirmed with the selected material and original cure/test procedure; a short gel time is not sufficient.
Does a high-solids formulation remove tunnel ventilation requirements? +
No. Spray exposure, site ventilation, access and any generator exhaust are addressed for the actual material and equipment arrangement. Solids content or a stated low-VOC formulation alone does not establish safe confined-space operation.
What inputs are needed for this configuration? +
Tunnel section/gradient, vehicle clearance, substrate/moisture, joints, coating build, work window, power and ventilation. Identify retained equipment and the required acceptance documents.
How should daily tunnel area be compared with the site plan? +
State shift length, film thickness, effective accepted area, preparation, relocation and downtime. Include joint details, cure and inspection rather than treating spray flow as crew productivity.

Request an Underground Waterproofing Proposal

Share the following for this application: Tunnel section/gradient, vehicle clearance, substrate/moisture, joints, coating build, work window, power and ventilation. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Contact us

For how we handle your inquiry information, read our Privacy Policy.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube