Utility Tunnel Polyurea Waterproofing Project in China

Project draft for review

Project Overview

Illustration notice. Process illustrations are not verified photographs of this installation.

Project reference basis. Figures and configuration details are reported in the supplied project brief. They are reference values for the stated application, rather than verified acceptance results or a guarantee for another installation. Confirm the source records, material, tooling, operating schedule and test method when assessing a comparable project.

A leading municipal infrastructure development authority in Northern China deployed Haifeng’s mobile dual-circuit waterproofing spray trucks to construct seamless elastomeric barriers across 48,000 m² of concrete expansion joints and roof decks in a multi-compartment utility tunnel network.

Prior to the deployment, the project experienced severe groundwater intrusion across structural settlement joints. Legacy preformed bituminous sheet membranes tore when differential ground settling produced dynamic movements exceeding 1.5 mm, while high subterranean air humidity prevented conventional liquid primers from curing properly, allowing water to track behind the membrane.

Haifeng deployed two HF-TUN120-MOB integrated mobile spray trucks engineered for subterranean access. By combining infrared surface flash-drying, moisture-tolerant priming, and high-pressure impingement spraying of high-elongation pure polyurea (≥ 450%), the team constructed an impermeable barrier bridging 2.0 mm joint movements and withstanding 0.5 MPa hydrostatic pressure heads.

Solutions Delivery

Haifeng engineered an integrated mobile deployment capable of navigating narrow 2.5-meter tunnel bays. The self-propelled vehicle drives along the concrete floor while front-mounted short-wave quartz infrared lamps flash-dry damp joint bevels, lowering substrate surface moisture below 6%.

Immediately behind the drying bank, an integrated medium-pressure circuit applies a moisture-tolerant penetrating epoxy primer, sealing microscopic concrete pores. Ten minutes later, the vehicle’s high-pressure hydraulic proportioning skid displaces pure polyurea components at 17.5 MPa through 65°C heated fluid lines.

Technicians operate mechanical-purge spray guns to apply a seamless 2.0 mm elastomeric membrane across expansion joint details and concrete sidewalls. The formulation gels in 15 seconds, eliminating running or sagging on vertical concrete walls. The cured lining achieves an ultimate tensile elongation greater than 450%, easily accommodating dynamic joint displacement without debonding. The entire application was executed without venting toxic solvents inside the confined tunnel compartments.

EquipmentModelQtyFunction
Mobile Waterproofing Spray TruckHF-TUN120-MOB2 unitsSelf-propelled chassis carrying IR dryers, priming, and 18 MPa polyurea skids.
Onboard Infrared Pre-Drying BankHF-IRB-122 setsShort-wave quartz lamps rapidly drying damp concrete substrate to < 6% moisture.
Medium-Pressure Airless Priming UnitHF-APU-022 unitsPenetrating epoxy primer delivery sealing concrete capillaries.
Mechanical-Purge Polyurea Gun SkidHF-MPG-024 unitsHigh-velocity impingement atomization with solvent-free mechanical shutoff.

Reported Project Results — Pending Record Verification

0.5 MPa
Hydrostatic Sealing Pressure
Reported in the supplied project brief: 0.5 MPa for 72 hours on the specified water-pressure test arrangement. Joint detail, substrate, curing, sampling and original pressure-test records require verification; this is separate from spray-circuit pressure.
1,200 m²
Daily Single-Vehicle Coverage
Reported in the supplied project brief: summary states 1,200 m²/day while the condition table states 1,220 m²/day. Reconcile per-vehicle/two-vehicle counting, two-shift hours and the 48,000 m²/40-day total.
2.0 mm
Dynamic Joint Movement Bridging
Reported in the supplied project brief: 2.0 mm joint movement on concrete specimens for 500 cycles. Joint geometry, film build, test temperature and original cyclic test records require verification; elongation at break alone does not establish movement capacity.