Headrest PIP Foaming Line Solution
Configure PU pour-in-place headrest production with material preparation, dispensing and rotary mold handling for your headrest construction and output.
Headrest PIP Foaming Line Solution
With more than two decades in polyurethane complete equipment, Haifeng Polyurethane Machinery delivers a turnkey PU foaming line for automobile headrests, built around precise injection, consistent density, efficient cycle and flexible changeover. The line integrates an HF-HPM series high-pressure foaming machine, a mixing head and a turntable line with selectable 8-station, 10-station or 12-station configurations, covering the full process from raw material metering and mixing, metered injection, foaming and curing, to mold opening and part removal. Dosing accuracy reaches ≤±0.3% with density fluctuation of ≤±3%, and the automatic high/low-pressure cycle switching keeps injection stable.
Precise Injection & Consistent Density
Closed-loop metering with metering pump, safety valve and VFD keeps density fluctuation ≤±3%.
Stable Injection & Flexible Turntable
Automatic high/low-pressure switching prevents build-up and dripping; 8/10/12-station optional.
Customized to your headrest mold and cycle targets, the turnkey line is delivered with commissioning, pilot production support and after-sales service; individual units can also be purchased separately.
Implementation Process
Our turnkey service covers the full journey from on-site survey and recipe design to commissioning, pilot production and long-term after-sales support.
Customized Solution Planning
Engineers survey on site and determine turntable station count and line configuration based on headrest mold structure, target cycle time and environmental standards.
High-Resilience Recipe Design
The R&D center completes customized high-resilience recipe and process design with feasibility verification.
Turnkey Equipment Delivery
Core equipment including the high-pressure foaming machine, mixing head and turntable line is built in our factory, and field engineers complete installation and commissioning.
Technical Parameters
Core equipment specifications for the headrest PIP high-pressure foaming machine and the turntable line.
| Equipment Unit | Qty | Function |
|---|---|---|
| HF-HPM High-Pressure Foaming Machine | 1 set | Two-component high-pressure impingement mixing & metered injection, dosing accuracy ≤±0.3% |
| Mixing Head | 1 set | High-pressure mixing, precise shot volume, self-cleaning |
| Turntable Line | 1 set | 8/10/12-station optional; cyclic mold operation: injection–foaming–mold opening–part removal |
| Electrical Control System | 1 set | PLC intelligent control with parameter setting, status monitoring and fault alarm |
| Parameter | Value |
|---|---|
| Model | HF-HPM-1A1B-HeadrestPIP |
| Pouring rate | 50–1000 g/s |
| Mix ratio | Polyether : Isocyanate = 100 : 45~60 |
| Tank capacity | 100L / 150L per tank, optional |
| Dosing accuracy | ≤±0.3% (Full Dynamic Range); specified HF-HPM-1A1B-HeadrestPIP configuration |
| Metering units | Polyether / Isocyanate, one each, pump + safety valve + VFD motor |
| Recirculation system | High/low-pressure cycle switching system |
| Pressure protection | Pressure limiting and control system |
| Tank configuration | 1A1B two-component independent temp control + circulation stirring |
| Temperature control | 20–45℃ |
| Mixing pressure | 10–18 MPa |
| Cleaning system | Automatic air purge, solvent-free |
| Power | 5.5–7.5 kW |
| Control system | PLC + touch screen + multi-formula storage |
| Application system | PU high-resilience flexible foam system |
| Warranty | 1 year |
| Certification | CE, ISO9001 |
| Component | Function |
|---|---|
| Polyether polyol metering unit | Metering pump + safety valve + VFD motor, closed-loop flow control |
| Isocyanate metering unit | Metering pump + safety valve + VFD motor, closed-loop flow control |
| Pressure limiting & control system | Keeps injection pressure stable |
| High/low-pressure cycle switching | Prevents pressure build-up and settling |
| Hydraulic unit | Stable power for mixing head and turntable motions |
| Mixing head | High-pressure impingement mixing, precise shot volume |
| Pipeline tanks | Two-component tanks with independent temp control + circulation stirring |
The listed dosing accuracy is a metering reference for the specified configuration. Define the measured quantity, material condition, flow and shot range, calibration and acceptance method. It is not a finished-part dimensional or performance tolerance.
Supporting Equipment for Your Foaming Line
This turnkey line is built around core equipment available as standalone solutions.
Why Choose Haifeng's Headrest PIP Line
Engineered for precise injection, consistent density, efficient cycle and flexible changeover.
Precise Injection & Consistency
Dosing accuracy ≤±0.3% with density fluctuation ≤±3% for fine, consistent surface.
Stable Injection
Automatic high/low-pressure cycle switching prevents pressure build-up and dripping.
Flexible Turntable Config
Selectable 8, 10 or 12 stations to match your cycle and output needs.
Turnkey or Standalone
Line delivered as a turnkey set, or foaming machine, mixing head and turntable purchased separately.
Related Projects
Explore how Haifeng's headrest PIP foaming line is deployed in automotive interior production.
Production Planning FAQ
Selection, supply scope and validation for this production route.
What does a PIP headrest line produce?
How is the rotary layout selected?
How is dispensing stability accepted?
What is needed for a proposal?
Get a Free Quote
Tell us your headrest mold and cycle targets, and our engineers will provide a customized PIP foaming line proposal. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.