Automotive Carpet Acoustic PU Foaming Solution Banner background

Automotive Carpet Acoustic PU Foaming Solution

Coordinate acoustic carpet backfoaming around the carpet construction, mold and required NVH test.

15–20dB Reference: Structure-Borne Noise Reduction
130kg/m³ Reference: Optimal Acoustic Foam Density
90s Reference: Demolding Cycle Time
Acoustic & NVH Engineering

High-Precision Polyurethane Backfoaming for Automotive Carpets

Carpet backfoaming combines the selected substrate and PU layer in a defined molded construction. Foam density, layer geometry, bonding and acoustic response depend on the formulation and tooling. Sound absorption, airborne transmission loss and structure-borne response must be specified separately rather than summarized by one universal decibel benefit.

Defined supply scope

Define the metering, dispensing, carpet positioning, mold handling and finishing package. Adhesive-free bonding and low-void appearance require validation with the actual surface and formulation.

Inputs for process selection

Carpet layer drawing, geometry, material system, acoustic test/baseline, shot mass, mold and finishing requirements.

Equipment scope, retained factory interfaces and acceptance are agreed for the selected material and part. Define the metering, dispensing, carpet positioning, mold handling and finishing package. Adhesive-free bonding and low-void appearance require validation with the actual surface and formulation.

Production route

Automotive Carpet Acoustic PU Foaming Workflow

Review the acoustic construction → Prepare substrate and material → Dispense and backfoam → Inspect and test the assembly. Define preparation, filling, cure and output timing separately for the selected configuration.

01

Review the acoustic construction

Identify carpet layers, molded contours and the target acoustic measurement.

02

Prepare substrate and material

Confirm bonding preparation, material conditions and tool temperature.

03

Dispense and backfoam

Validate the pouring path, venting and cure for the carpet geometry.

Configuration & Process Parameters

Engineering Specifications & Technical Parameters

Existing configuration and test references. Equipment settings, material results and finished-assembly results are separate; apply each value only to its documented configuration and conditions.

Technical ParameterStandard Specification / ValueEngineering Context & Verification
Target ApplicationFront/Rear Automotive Carpets, Wheelhouse InsulatorsCabin floor NVH acoustic insulation
Material FormulationSemi-Rigid Acoustic PU Foam (Open-Cell)High sound-dissipative formulation
Metering Output Capacity30 – 100 kg/min (Customizable)Servo axial piston pumps with Ratio Lock
Foam Core Density120 – 140 kg/m³Acoustic transmission loss optimization
Demolding Cycle Time80 – 110 seconds (Standard 90 s)High-cadence multi-station carousel
Noise Reduction Rating15 – 20 dB Structure-Borne AttenuationPack and body-in-white acoustic testing
Scope of SupplyTurnkey (Foaming Skid, Robot, TCU + Optional Mold Fixtures)Complete workcell or carousel line integration
Existing application note: Robot stroke length, carousel station counts (4 to 12 stations), and clamping platen dimensions are customized according to vehicle floorpan footprint. Supplementary references: core density 120–140 kg/m³; compression set <8% after the stated footfall test; component conditioning ±0.5°C; demolding 90 seconds; site work 14 days. Confirm the specimen, sampling, cycle endpoints and site scope; these are not general NVH or service-life guarantees. Other brief details include a 6-axis dispensing robot and compression-set measurement after 100,000 footfall cycles; validate the actual robot configuration and specimen/test basis. Confirm the configuration, material, test method and cycle endpoints before using reference values as acceptance commitments.
Engineering Considerations

Process controls and application checks

Evaluate these functions with the selected material, tooling and production brief. Finished-part results require their own acceptance evidence.

Construction-specific NVH

Relate the requested acoustic result to a defined layer structure and test frequency range.

Large-area dispensing

Coordinate metered delivery and pouring paths with deep contours and mold venting.

Defined bonding checks

Assess interface strength, density distribution and visible voids on representative assemblies.

Related Applications & Projects

Related Projects

These are related application references. Compare the actual material, process and delivered modules; reported project figures are not acceptance results for another line.

View Project
Production Planning Questions

Frequently Asked Questions

Engineering and purchasing questions about this polyurethane production route.

Does metering accuracy guarantee an acoustic improvement? +
No. The complete carpet structure and test arrangement determine the measured result. Metering is one process control input.
How does this differ from the general carpet-cell and acoustic-pad pages? +
This page focuses on the acoustic carpet construction. The carpet-cell page covers mold-carrier interfaces; the acoustic-pad page concerns separately defined pad parts and their handling.
What information is needed for a preliminary configuration? +
Carpet layer drawing, geometry, material system, acoustic test/baseline, shot mass, mold and finishing requirements. Identify the equipment and interfaces to retain, plus the required test and acceptance documents.

Discuss Your Automotive Production Project

Share the following with your production brief: Carpet layer drawing, geometry, material system, acoustic test/baseline, shot mass, mold and finishing requirements. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Contact us

For how we handle your inquiry information, read our Privacy Policy.

Configuration review based on the application and material data Agreed equipment, interface and acceptance documentation Training and support defined for the supplied package
Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube