Office Chair Foam Cushion Line Project in Morocco

Molded Seating Foam in Morocco project reference: Material metering, molded seating production, indexed carriers, curing and post-demold processing.

Project Reference and Configuration

Illustration notice. Process illustrations are not verified photographs of this installation.

Project reference basis. Figures and configuration details are reported in the supplied project brief. They are reference values for the stated application, rather than verified acceptance results or a guarantee for another installation. Confirm the source records, material, tooling, operating schedule and test method when assessing a comparable project.

This project reference describes material metering, molded seating production, indexed carriers, curing and post-demold processing.

Configuration and numerical values are reproduced from the supplied project brief for discussion. Original production, inspection and acceptance records have not been verified; these values do not establish certification or performance for another configuration.

Configuration Listed in the Project Brief

Solution Module Typical Panels / Parts Core Material Main Process Typical Production Mode
Furniture & Comfort Foam Office Chair Seat Cushions MDI Cold-Cure HR PU Foam In-Mold High-Pressure Foaming 18-Station Oval Mold Carousel

Equipment References in the Project Brief

The supplied brief lists the following equipment references. Model identities, quantities and the actual delivery scope follow the original equipment schedule.

1. High-Pressure Seating Dosing Unit: Stoichiometric ratio metering, dynamic pressure regulation & shot weight control
2. 6-Axis Pouring Robot Workstation: Automated precision trajectory dispensing inside contoured open molds
3. 18-Station Mold Carousel Line: Oval continuous conveyor with pneumatic mold clamping and heating interfaces
4. Multi-Stage Inline Roller Crusher: High-speed cell membrane mechanical fracture and dimensional stabilization
5. Master Automation PLC Control Cabinet: Master process logic, line speed coordination & temperature logging

Installation, training, warranty and service arrangements follow the project agreement; durations in this brief are references.

For a similar installation, confirm the mold layout, utility connections, commissioning materials and installation responsibilities in the project agreement. Remote support, where configured, requires an agreed network connection, customer authorization and on-site technical assistance.

Equipment Model Qty Function
High-Pressure Seating Dosing Unit HF-HP-SEAT40 1 Unit Stoichiometric ratio metering, dynamic pressure regulation & shot weight control
6-Axis Pouring Robot Workstation HF-ROBOT-6AX 1 Set Automated precision trajectory dispensing inside contoured open molds
18-Station Mold Carousel Line HF-CAROUSEL-18 1 Set Oval continuous conveyor with pneumatic mold clamping and heating interfaces
Multi-Stage Inline Roller Crusher HF-CRUSH-200 1 Unit High-speed cell membrane mechanical fracture and dimensional stabilization
Master Automation PLC Control Cabinet HF-PLC-CAR-V4 1 Set Master process logic, line speed coordination & temperature logging

Project Reference Values

65%
Reference: Ball-Rebound
Project-brief reference; original records pending. The brief lists 65% rebound compared with 46% on its baseline foam. Confirm the specimen, test method and comparison conditions.
180 s
Reference: Submitted Demolding-Time
Project-brief reference; original records pending. The brief lists 180 s from pouring to ejection and 300 s for a manual baseline. This is not automatically the full station-entry-to-demold cycle or line output interval; confirm all timing endpoints.
<4.0%
Reference: Thickness-Loss
Project-brief reference; original records pending. The brief lists <4.0% thickness loss after 100,000 dynamic test cycles, compared with 14.8%. Original test method, samples and reports are pending; no furniture-standard conformity is asserted.

Start a Similar Project

Share your application, material system, target output and factory conditions. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube