STM Battery Protection Panels

STM Battery Underbody Shield Molding Project in China

Haifeng integrated a two-component PU spray-to-press line for composite battery underbody shields. The project has been delivered and accepted.

Battery Underbody Shield Production and Cell Integration

Haifeng coordinated this automotive battery-underbody-shield project as general contractor/integrated-line supplier. The line has been delivered and customer acceptance is complete. The project connects two-component PU spraying, workpiece gripping and robotic transfer with compression molding and the specified manual operating stations.

Component and Material Scope

The application is a composite battery underbody protection panel. Specify the actual reinforcement, core or inserts, mounting features and target protection duties in the approved part drawing. A battery top cover is a related application with separate closure, sealing and validation requirements; the supplied platform label does not establish a paper-honeycomb core for this panel.

Concept illustration of a composite battery underbody shield with perimeter mounting holes; identifying markings removed
Concept illustration based on supplied component imagery. Identifying markings removed; panel construction and qualification follow the approved part specification.

Operating Sequence

Operators prepare the selected blank and manually load it onto the station. A presence check precedes robot picking. The configured gripper presents the workpiece for PU application to the specified two faces, then transfers it to the available press mold within the material’s reaction window. After compression forming/cure, the finished panel is manually removed through the permitted access sequence.

Supplied Technical References

The following figures describe the selected technical package. They are not a list of measured acceptance results or simultaneous operating maxima.

Parameter Selected technical reference Condition and meaning
Material system Two-component PU; rigid and semi-rigid foam systems listed The actual reinforcement, core, formulation and approved part drawing determine suitability.
Material pressure 10–20 MPa, adjustable reference Material delivery/spraying pressure; it is not press forming pressure or a finished-part strength value.
Specified injection/spray flow 25–90 g/s Confirm the flow basis, material conditions and discharge-calibration procedure for the selected setup.
Adjustable component ratio 1:3 to 3:1 reference Confirm whether the ratio is specified by mass or volume and match it to the approved formulation. A is polyol; B is isocyanate.
Material temperature control ±2 °C stated control reference Temperature-control performance is separate from ratio accuracy and spray-mass uniformity; agree measurement points and operating conditions.
Loading and unloading Manual loading and finished-part removal; robotic handling between stations This configuration is not unattended operation from raw blank to finished panel.
Workpiece gripping Part-specific clamp span and tooling Review panel size, mass, stiffness, edge condition, orientation, collision clearances and the transfer window.
Compressed-air interface 1.0 MPa stated supply-pressure reference Required flow, air quality and point-of-use conditions need a separate utility schedule; pressure alone is not air consumption.
Electrical interface 380 V, 50 Hz; 50 kW reference excluding the press Confirm the selected modules and the separate press, thermal-unit and site-extraction loads. This is not measured energy consumption.

Robot Gripping and Cell Interfaces

The workpiece-clamping concept combines a main/follower beam arrangement, clamp arms and jaws, with the selected servo/ball-screw adjustment and rotation functions. Span, grip points, allowable contact pressure, handling orientation and clearance are determined for the actual panel. The cell coordinates material detection, spray station, press handshakes, temperature-control area, enclosure access and extraction interfaces.

Concept illustration of blue press equipment and a temperature-control cabinet for STM component production; identifying markings removed
Concept illustration based on supplied equipment imagery. Third-party markings removed. This edited image does not establish press tonnage or serve as an acceptance photograph.

Layout and Press Scope

The supplied plan coordinates robot reach, press positions, loading/removal areas, a spray chamber, the material unit and thermal equipment. The presentation and plan show different arrangements, including a reserved second-press position. The approved installed configuration determines the number of active presses, press force, final dimensions and utility loads; neither the concept drawing nor the image establishes those values alone.

Delivery and Component Verification

Haifeng completed the agreed integrated-line delivery and customer acceptance. For the target panel, agree spray-mass distribution, material conditions, transfer timing, mold/press settings, dimensional and laminate checks, and the applicable impact, insulation, fire, sealing or pack-level validation requirements. No specific weight saving, cycle improvement or certification result is claimed here.

Project Questions

What did Haifeng deliver?

Haifeng coordinated the integrated spray-to-press project, covering the agreed equipment and cell interfaces. The project has been delivered and accepted.

Does this prove every battery cover and shield uses the same layup?

No. The underbody panel’s reinforcement, core and material specification belong to this project. Related top covers and PHC constructions require their own design review.

Was a second press shown as operating equipment in every source?

No. The presentation includes a reserved second-press location, while the plan shows two press positions. The installed equipment schedule determines active and future stations.

Are the edited images acceptance evidence?

No. They are Concept illustrations based on supplied component/equipment imagery with third-party markings removed. Delivery and acceptance status is based on the project confirmation, not the reconstructed images.

Explore the corresponding STM battery cover and underbody shield solution.

Haifeng Coordination of Spraying, Transfer and Press Interfaces

Haifeng coordinated the selected two-component PU spray unit, robot/gripper, loading and spray stations, press/mold interfaces, thermal-control area and cell controls within the agreed delivery scope. Manual loading and finished-part removal are defined operations. Final press force, installed station count, material architecture and factory utilities follow the approved project configuration.

Delivery and Acceptance Status

Delivered
Integrated-line delivery
Haifeng completed the agreed general-contracting/integrated-line delivery.
Accepted
Customer acceptance
Customer acceptance is complete for the agreed project scope.

Discuss Your Battery Protection Panel Line

Send the part drawing, material system, target output and existing press/site conditions. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube