Automobile Headrest PIP Foaming Line Upgrade Case | Anhui, China
An Anhui automotive headrest project integrating high-pressure PU metering, a mixing head and a 12-station turntable to replace manual small-shot injection.
Headrest PIP Foaming Line Upgrade in Anhui
Project Background Located in an auto parts industrial park in Anhui Province, the customer is a manufacturer specializing in automobile headrests, producing about 700,000 headrest foamed parts per year with revenue of about RMB 150 million in 2025. Challenges Manual small-shot injection caused density fluctuation of ±8%, a defect rate of 6%–10% and frequent pressure build-up and dripping. Haifeng Solution The customer adopted the Haifeng turnkey headrest PIP foaming line, integrating an HF-HPM high-pressure foaming machine, a mixing head and a 12-station turntable line. Results Per-line capacity rose about 50%, density fluctuation fell to ≤±3%, defect rate to ≤2%, manpower dropped from 20 to 10, with annual savings of about RMB 1.14 million and a payback period of about 3.3 years.
Turnkey Line Configuration
The customer selected the Haifeng headrest PIP polyurethane foaming line turnkey solution, consisting of an HF-HPM high-pressure foaming machine, a mixing head and a 12-station turntable line.
| Equipment | Model | Qty | Function |
|---|---|---|---|
| HF-HPM Series High-Pressure Foaming Machine (Headrest PIP) | HF-HPM-1A1B-HeadrestPIP | 1 set | Two-component high-pressure impingement mixing & metered injection; dosing accuracy ≤±0.3% (Full Dynamic Range) for the specified HF-HPM-1A1B-HeadrestPIP configuration. Measurement and acceptance conditions follow the project agreement. |
| Mixing Head | 1 set | High-pressure mixing, precise shot volume, self-cleaning | |
| 12-Station Turntable Line | 1 set | Cyclic mold operation: injection–foaming–mold opening–part removal | |
| Electrical Control System | 1 set | PLC intelligent control with parameter setting, status monitoring and fault alarm |
Related Equipment Families
Catalog references describe related equipment families. The delivered model, auxiliaries and acceptance conditions follow the project configuration.
Upgrade Results

Looking for a Similar Solution?
Explore our turnkey headrest PIP foaming line to upgrade your headrest production.