Automobile Acoustic Pad Foaming Line Upgrade Case | Jiangsu
A Jiangsu automotive acoustic-pad upgrade integrating high-pressure PU foaming and hydraulic mold carriers with automatic trimming to replace manual operations.
PU Acoustic Pad Foaming Line Upgrade in Jiangsu
Project Background Located in an auto parts industrial park in Jiangsu Province, the customer is a manufacturer specializing in automotive acoustic interiors, producing about 120,000 acoustic pads per year with revenue of about RMB 28 million in 2025. Challenges Manual pouring and manual trimming caused density fluctuation of ±15% and a defect rate of 8%–12%, blocking OEM NVH audits. Haifeng Solution The customer adopted the Haifeng turnkey automobile acoustic pad PU foaming line, integrating an HF-HPM high-pressure foaming machine and four hydraulic mold carriers with automatic edge trimming. Results Per-line capacity rose about 67%, density fluctuation fell to ≤±3%, defect rate to ≤2%, manpower dropped from 12 to 5, with annual savings of about RMB 1.02 million and a payback period of about 3.3 years.
Turnkey Line Configuration
The customer selected the Haifeng automobile acoustic pad PU foaming line turnkey solution, consisting of an HF-HPM series high-pressure foaming machine and hydraulic mold carriers.
| Equipment | Model | Qty | Function |
|---|---|---|---|
| HF-HPM Series High-Pressure Foaming Machine (Automobile Acoustic Pad) | HF-HPM-1A1B-AcousticPad | 1 set | Two-component high-pressure impingement mixing & metered pouring, dosing accuracy ≤±0.3% |
| Hydraulic Mold Carrier (Automobile Acoustic Pad) | 4 sets | Opening, closing, locking, mold-plate up/down, clamping and edge-trimming motions, hydraulically driven and PLC-controlled | |
| Electrical Control System | 1 set | PLC intelligent control with parameter setting, status monitoring and fault alarm |
Related Equipment Families
Catalog references describe related equipment families. The delivered model, auxiliaries and acceptance conditions follow the project configuration.
Upgrade Results
Related Projects
View All ProjectsLooking for a Similar Solution?
Explore our turnkey PU acoustic pad foaming line to upgrade your acoustic interior production.
Plan Your Polyurethane Production Project
Our engineering team is ready to design a customized PU machinery solution that matches your production targets, quality standards, and investment plan. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.