Auditorium Theater Seating PU Line Project in Kazakhstan Banner background

Auditorium Theater Seating PU Line Project in Kazakhstan

Haifeng delivered a 24-station molded PU seating line in Kazakhstan, achieving BS 5852 Crib 5 fire compliance and 62% high-resilience comfort for theater seats.

Project Overview

Illustration notice. Process illustrations are not verified photographs of this installation.

Project reference basis. Figures and configuration details are reported in the supplied project brief. They are reference values for the stated application, rather than verified acceptance results or a guarantee for another installation. Confirm the source records, material, tooling, operating schedule and test method when assessing a comparable project.

Haifeng successfully engineered and commissioned an automated 24-station flame-retardant molded polyurethane seating line for a premier commercial auditorium and cinema seating manufacturer in Kazakhstan, achieving certified compliance with British Standard BS 5852 Crib 5 fire safety standards. The turnkey project covered the complete delivery of high-pressure multi-stream dosing machinery with flame-retardant slurry recirculation, an automated mold carousel, robotic trajectory pouring, and vacuum de-gassing systems.

Prior to commissioning, the manufacturer experienced severe quality rejections during commercial fire safety audits. Legacy low-pressure machines allowed dense flame-retardant powder additives to settle in chemical tanks, causing erratic isocyanate index shifts and leaving seats susceptible to localized combustion. The client required an advanced high-pressure dispensing setup featuring continuous magnetic-drive recirculation, high-accuracy closed-loop Ratio Lock flow regulation, and uniform mold temperature conditioning to ensure homogenous fire retardant dispersion.

Operating since June 2022 on a two-shift daily schedule across a 550 m² facility, the production plant outputs over 2,000 heavy commercial theater seating cushions daily. By deploying Haifeng's slurry-handling high-pressure technology and synchronized carousel automation, the client reliably manufactures luxury, fire-safe public seating complying with strict international fire codes.

Project Technical Specification Matrix:

Solution ModuleTypical Panels / PartsCore MaterialMain ProcessTypical Production Mode
Furniture & Comfort FoamTheater & Auditorium SeatingFlame-Retardant HR PU FoamIn-Mold High-Pressure Foaming24-Station Turntable Carousel

Solutions Delivery

Haifeng deployed a heavy-duty molded foam workcell optimized for high-viscosity, flame-retardant flexible polyurethane formulations:

1. Slurry Recirculation Metering Skid: Heavy-duty axial piston pumps equipped with hardened carbide internals circulate polyols containing liquid and solid flame retardants at 180 bar without settling.
2. Robotic Pouring & Needle Shut-Off: A 6-axis robot guides an L-shaped impingement mixing head, executing rapid 0.3s anti-drip needle shut-offs over heavy steel-insert theater molds.
3. 24-Station Multi-Cavity Carousel: A continuous turntable conveyor with water-jacketed tooling holds mold temperatures steady at 62°C (±0.8°C), ensuring rapid, complete exothermic polymerization.
4. Mechanical Vacuum-Assisted Crusher: Freshly demolded heavy cinema cushions pass through an integrated multi-roller crusher, fully rupturing closed cell membranes to restore bounce.

Installation and commissioning: 24 days. Operator training: 4 days. Warranty: 1 year. Long-term spare parts and remote PLC diagnostic support are available.

EquipmentModelQtyFunction
Flame-Retardant High-Pressure Dosing SkidHF-HP-FR601 UnitStoichiometric ratio metering with anti-abrasive slurry recirculation
6-Axis Pouring Robot WorkstationHF-ROBOT-6AX1 SetRobotic trajectory dispensing inside oversized theater chair molds
24-Station Heavy Carousel SystemHF-CAROUSEL-241 SetHeavy-duty turntable line with pneumatic mold locking and thermal circuits
High-Capacity Seating Roller CrusherHF-CRUSH-2501 UnitAutomated cell window rupturing for heavy-density commercial cushions
Master Automation PLC CabinetHF-PLC-TH-V41 SetComplete process logic, flame-retardant recipe logging & safety interlocks

Project Results

100% Pass
BS 5852 Crib 5 Compliance
Full-scale open-flame wooden crib burn test passed without progressive smoldering. Baseline: 68% pass rate on legacy low-pressure equipment. Measurement conditions: Accredited independent laboratory burn testing.
62%
Ball Rebound Resilience
High comfort elasticity achieved despite high concentrations of solid flame retardants. Baseline: 45% on generic commercial public seats. Measurement conditions: ISO 8307 ball rebound quality audit.
190 s
Demold Cycle Cadence
Continuous production cycle achieved per high-density auditorium backrest. Baseline: 360 s on manual single-clamping fixtures. Measurement conditions: Timed continuous multi-shift production runs.

Start a Similar Project

Discuss your furniture product, material formulation, capacity and automation requirements with Haifeng.