PU Injection Machine | Rain Boots
Select PU rain boot injection equipment around boot height, lining, mold clearance, color dosing, material delivery and the required demolding sequence.
PU Flow (Linear Reference)
20-station linear reference: 20–60 g/s; this is a mass rate, not a per-shot volume
Stations (Linear Reference)
20-station linear reference: 20; customizable
Tank Capacity (Linear Reference)
20-station linear reference: 120 L; customizable
Feed Components (Linear Reference)
20-station linear reference: 2, 3 or 4; selected for the material system
Product Overview and Selection
Review the application, material or workpiece, tooling interfaces and selected equipment scope before choosing a configuration.
PU rain boot equipment is configured for the shaft, lining, sole structure and color arrangement of the intended boot. The general arrangement combines PU metering and mixing, mold actuation, material conditioning and PLC/HMI control.
A separate linear reference configuration lists 20 mold stations, 20–60 g/s PU mass flow and customizable 120 L tanks. These values describe that configuration and do not replace the general equipment options. Flow, station time and rotational-speed references have different duties and are listed separately in the specification table.
Use the tallest boot and largest size to review mold space, opening clearance and demolding. Protective inserts, tooling, trials and automation responsibilities are defined in the project scope. Finished-boot properties follow the selected material, construction and tests.
Production Workflow
Define the Boot and Mold Space
Use the tallest boot, largest size, lining, layer structure and inserts to review opening and removal clearance.
Prepare and Meter the PU System
Condition the selected components and define the ratio, flow, temperature and color-dosing duties.
Fill, Mold and Hold
Coordinate material delivery, mold actuation and residence using the actual boot tooling and selected line arrangement.
Demold and Inspect the Boot
Confirm removal, finishing, appearance and the agreed waterproofing, bonding or protective-product tests.
Need a quote for your footwear equipment?
Request a QuoteTechnical Specifications
The listed configuration requires review against the actual materials, tooling and production goals. The linear 20-station reference below is a separate configuration. Listed flow is a mass rate, station timing is a time interval, and neither establishes a guaranteed pair output. Rotating-part duty, tank allocation, pump displacement basis and installed electrical scope follow the ordered specification.
| Technical Parameter | Linear 20-station reference configuration | |
|---|---|---|
| Material and products | PU; multicolor single-density or dual-density rain boots | – |
| Mold actuation | Toggle-type opening and closing mechanism | – |
| Metering and mixing | Automatically controlled metering pump; high-speed mixing head | – |
| Material tanks and color dosing | Insulated, pressure-resistant tanks; independent multicolor dosing unit | – |
| Control and drive | PLC/HMI; fully hydraulic drive | – |
| Numerical operating limits | Flow rate, clamping force, boot height, size range and production output require confirmation | – |
| Raw-material feed components | – | 2, 3 or 4; selected for the material system |
| Listed tank capacity | – | 120 L; customizable |
| PU dispensing mass flow | – | 20–60 g/s; this is a mass rate, not a per-shot volume |
| Metering pump size reference | – | 20 cm³; confirm the pump displacement basis in the ordered specification |
| Listed screw diameter | – | 25 mm |
| Metering pump drive power | – | 1.5 kW × 2; inverter or servo configuration |
| Injection unit main drive power | – | 9 kW |
| Mixing motor power | – | 0.75 kW × 2 |
| Traveling carriage motor power | – | 5.5 kW |
| Material tank heating power | – | 4 kW × 2 |
| Mold heating power | – | 0.5 kW × 20 |
| Mold stations | – | 20; customizable |
| Rotational-speed reference | – | 15,000–24,000 r/min; rotating-part duty is defined in the selected configuration |
| Station timing reference | – | 5–20 s/station; timing endpoints follow the selected operating sequence |
| Compressed-air reference | – | >0.8 MPa, 25 L/min; confirm operating supply and reference conditions |
| Power supply reference | – | Three-phase 380 V AC, 50 Hz |
Equipment Functions and Configuration
Functions and options are selected for the material, tooling and tasks included in the order.
Toggle mold actuation
Toggle-type mold opening and closing.
Metering and mixing
Automatically controlled metering pump and high-speed mixing head.
Independent color dosing
Independent multicolor dosing.
Hydraulics and PLC/HMI
Fully hydraulic drive with PLC/HMI control.
Material tank conditioning
Insulated, pressure-resistant material tanks; confirm their operating limits for the formulation.
Need help selecting your equipment configuration?
Share your product, materials, tooling and production target. Equipment scope and commissioning requirements are agreed for each project.
Compare Footwear Equipment
Compare these equipment routes by material, sole structure and integration scope. Listed alternatives are not interchangeable without a tooling and process review.
Equipment Selection FAQ
What boot height and size range can the machine handle?
Are protective toe caps and penetration-resistant inserts included?
Can this machine replace a sole direct injection machine?
What information is needed to assess a multicolor boot project?
What happens after I send the project requirements?
Ready to discuss your project?
Contact Our Team