Storage Tank PU and Polyurea Coating Solution
Organize tank coating or secondary-containment spraying around the substrate, stored medium and access constraints.
Build the Process Around Your Product
Organize tank coating or secondary-containment spraying around the substrate, stored medium and access constraints.
Product and material first
Start with the finished-product drawing, material system and acceptance requirements. The process route and equipment configuration are assessed together.
Capacity across the whole process
Define output with preparation, forming/reaction, curing, handling and inspection included. The slowest stage and product changes determine practical line capacity.
Spray proportioning and application equipment form the core proposal. Site preparation, access, substrate repair and owner release procedures have separately agreed responsibilities.
From Preparation to Qualified Product
A planning sequence for the specified route. Final settings and acceptance conditions are established through material and part review.
Define containment duty
Distinguish internal tank lining, external coating and secondary containment; identify substrate and chemical exposure.
Survey and prepare
Plan repairs, surface preparation, primer and masking for walls, floor, joints and penetrations.
Prepare spray system
Confirm ratio, component temperature, hose layout and site services.
Information Needed to Configure the Line
Provide these inputs so the equipment range, interfaces and validation plan can be defined.
| Design input | Information required |
|---|---|
| Tank information | Substrate, dimensions, access, joints and service history |
| Stored medium | Chemical composition, temperature and immersion conditions |
| Coating design | Material system, primer, thickness and inspection requirements |
| Site conditions | Access, isolation, ventilation and utilities |
Core Equipment and Integrated Interfaces
Spray proportioning and application equipment form the core proposal. Site preparation, access, substrate repair and owner release procedures have separately agreed responsibilities.
Coordinate the Equipment With the Process
Evaluate repeatability, handling and acceptance across the full workflow.
Material-specific configuration
Component circuits, thermal control, mixing and receiving equipment are matched to the approved chemistry and processing window.
Defined interfaces
Spray proportioning and application equipment form the core proposal. Site preparation, access, substrate repair and owner release procedures have separately agreed responsibilities.
Documented acceptance
The proposal defines trials, process records, inspection responsibilities and product-specific acceptance conditions.
Related Project Records and Industry References
Review the evidence type on each record. Haifeng project figures describe their own configuration; public industry references identify third-party sources and are not Haifeng deliveries.
Frequently Asked Questions
Clarify the production route before selecting a machine.
Can a secondary-containment example prove internal tank compatibility?
What information is needed to size the production line?
What is included in the equipment package?
Are cycle time and finished-product performance fixed?
Submit Your Production Goals
Share the finished product, material, target capacity, automation requirements and factory conditions to discuss a project-specific line configuration.