Polyurea Tank Containment Industry Project Reference
Industry Application Reference · Public Sources · Not a Haifeng Delivery
Industry Reference: Source and Application
Illustration notice. Process illustrations are not verified photographs of this installation.
Project reference basis. Figures and configuration details are reported in the supplied project brief. They are reference values for the stated application, rather than verified acceptance results or a guarantee for another installation. Confirm the source records, material, tooling, operating schedule and test method when assessing a comparable project.
Industry application reference based on public sources. This is not a Haifeng customer delivery record.
Publicly documented application
The public project describes spray-applied polyurea over a geotextile secondary-containment arrangement around storage tanks. Site preparation, masking and plural-component application formed part of the reported work.
Evidence scope
Supplier-published third-party project; client and contractor names omitted from this summary
Source and date
Published tank secondary-containment project
1 September 2015; accessed 3 October 2026
Planning implications for a new line
This example concerns secondary containment, rather than proof of compatibility for an immersed internal tank lining. For a Haifeng spray-system proposal, provide the containment drawing, substrate, approved material data, chemical exposure and required inspection plan. Heating, proportioning, spray access and site services must be selected for that duty.
Names identifying the end user and contractor are omitted in this summary. Source attribution remains visible. Machine counts, delivery dates, factory location and training/warranty details are left unspecified unless this page expressly reports them from the source.
Published Process Configuration
Plural-component spray application to geotextile secondary containment. This describes the public reference architecture, not equipment supplied by Haifeng. The proposed Haifeng configuration is determined separately from the production brief.
Published Reference Data and Conditions