Storage Tank and Vessel PU Insulation Solution Banner background

Storage Tank and Vessel PU Insulation Solution

High-output polyurethane spray and cavity pouring systems engineered for petrochemical tanks and refrigerated vessels, eliminating corrosion under insulation (CUI).

100% CUI Corrosion Prevention
50kg/min Max Annular Injection Output
-160°C Cryogenic Material/Application Reference
Petrochemical & Cryogenic Storage

High-Performance Polyurethane Solutions for Storage Tanks & Refrigerated Vessels

Storage tanks for heated bitumen, crude oil, beer fermentation, and liquefied natural gas (LNG) demand thermal protection that prevents temperature drift while protecting massive steel assets from catastrophic corrosion. Traditional insulation methods—such as banding pre-formed curved foam blocks or mineral wool under protective aluminum cladding—inevitably permit ambient moisture and rain ingress into the annular gap. This trapped moisture causes aggressive Corrosion Under Insulation (CUI), degrading tank walls invisibly until rupture occurs. Haifeng’s tanks and vessels polyurethane insulation solution injects or sprays high-density closed-cell formulations directly against primed steel walls. Chemically fusing to the metal with >0.35 MPa adhesion, it eliminates annular air gaps, repels moisture drive, and delivers certified thermal barriers operating from -160°C up to +120°C.

Total Prevention of Corrosion Under Insulation (CUI)

In-situ chemical bonding creates an impenetrable seal directly against the steel tank skin, permanently blocking water and oxygen ingress to prevent hidden tank corrosion.

Deep Cryogenic Stability (-160°C Containment)

Specialized low-temperature elastomeric formulations flex under thermal contraction stress without cracking or cell rupturing, ensuring boil-off gas rates remain minimal.

Haifeng delivers complete field application packages—from mobile high-output proportioners and heated extended hoses to automated tank crawler robots—enabling industrial insulation contractors to execute mission-critical tank projects safely. Haifeng provides equipment and process integration, on-site commissioning and operator training, a 1-year machine warranty and long-term spare parts support. Site construction and material supply follow the project delivery scope.

Manufacturing Workflow

Production Workflow for Storage Tank & Vessel PU Insulation Machine System

The workflow for Storage Tank & Vessel PU Insulation Machine System covers Surface Prep, Thermal Conditioning, In-Situ Application, Cladding & Seal. Confirm the sequence and equipment interfaces against the selected material system and product design.

01

Tank Shell Grit-Blasting & Thermal Priming

The cylindrical tank exterior is grit-blasted to Sa 2.5 cleanliness; anti-corrosive epoxy primers are applied to activate surface chemical bonding.

SURFACE CLEANLINESS: SA 2.5 | PRIMER: EPOXY | PULL-OFF: GREATER THAN 0.35 MPA
02

Precursor Heating & High-Volume Recirculation

Dual proportioner heaters and heated hoses condition polyol and isocyanate streams at 48°C–56°C, ensuring dynamic viscosity balance for rapid high-volume pours.

STREAM HEATING: 48°C–56°C | RATIO LOCK: 1:1 ±0.5% | HOSE REACH: UP TO 90 M
03

Dual-Mode High-Pressure Spray or Annular Pouring

For open tanks, spray guns apply multi-pass 25mm layers up to 100mm; for jacketed vessels, injection lances pour timed shots into annular gaps under controlled backpressure.

INJECTION PRESSURE: 150–180 BAR | OUTPUT: UP TO 50 KG/MIN | CLOSED-CELL: ≥96%
Configuration & Process Parameters

Technical Specifications

Configuration and application values from the supplied engineering brief. Material properties and project results apply to their stated conditions.

Technical ParameterStandard Specification / ValueEngineering Context & Verification
Target ApplicationPetrochemical Storage Tanks, LNG/LPG Vessels, Beer FermentersIndustrial tank thermal envelope & CUI protection
Material MatrixRigid Polyurethane (PUR) / Polyisocyanurate (PIR)Cryogenic and high-temperature formulations
Operating Temperature Range-160°C to +120°CLiquid gas storage to heated bitumen tanks
Core Foam Density40 – 60 kg/m³Optimized for thermal insulation & compression
Thermal Conductivity (λ)≤0.020 – 0.022 W/(m·K)ASTM C518 heat flow meter verification
Closed-Cell Content≥96%Prevents liquid and vapor moisture transmission
Proportioner Fluid Output12 – 50 kg/minHigh-output capability for large annular cavities
Mixing and delivery pressure are equipment parameters; enclosed-cavity pressure is controlled separately. Thermal properties describe the selected insulation formulation and application.
Metering, Mixing & Line Equipment

Reference Haifeng Insulation Equipment

Listed equipment shows its current application configuration. The metering unit, hose, gun or injection head and optional modules are selected for this project.

Engineering Considerations

Key Engineering Advantages

Application-specific process controls, tooling and equipment integration.

100% CUI Corrosion Elimination

Continuous chemical adhesion to steel shells stops water intrusion, permanently preventing corrosion under insulation.

Minimal Boil-Off Gas Loss

Low thermal conductivity (λ ≤ 0.020) preserves cryogenic liquid temperatures, drastically cutting vapor boil-off flare loss.

Dual Application Versatility

Switches easily between open-tank automated spray crawlers and jacketed-tank annular cavity injection probes.

Rapid High-Output Application

Pumps up to 50 kg/min continuously, slashing project scaffolding and insulation scheduling by 50%.

Production Planning Questions

Frequently Asked Questions

Process selection, site conditions and equipment integration.

How does spray PU foam stop Corrosion Under Insulation (CUI)? +
Traditional insulation leaves an annular air gap where trapped rainwater condenses and rusts the steel tank unseen. Spray foam bonds directly to the blasted metal with >0.35 MPa adhesion, eliminating the air gap entirely.
Can this system insulate cryogenic storage tanks down to -160°C? +
Yes. Haifeng equipment processes specialized cryogenic PIR formulations engineered with modified crosslink networks that flex under extreme thermal contraction without cracking.
Can automated crawler robots be used with Haifeng proportioners? +
Yes. Our high-pressure proportioners integrate with automated magnetic climbing crawlers to spray tall storage tank shells with uniform thickness without extensive scaffolding.
What is the typical installation and commissioning timeline on-site? +
Equipment uncrating, high-pressure proportioner calibration, heated hose assembly, and live trial tank spraying take 14 to 18 days on-site.

Discuss Your Insulation Equipment and Application

For Storage Tank & Vessel PU Insulation Machine System, send finished-product drawings or samples, material data, target output, automation needs and factory conditions. Haifeng can use these inputs to discuss the line configuration and technical interfaces.

Contact us