Storage Tank and Vessel PU Insulation Solution Banner background

Storage Tank and Vessel PU Insulation Solution

Configure PU spray or annular-fill equipment for tanks and vessels, with material conditioning and application interfaces selected for tank geometry and insulation requirements.

Spray / Fill Separately configured application routes
12–50kg/min Supplied annular-fill reference; selected dosing package
Cryogenic Qualified material and insulation design required
Petrochemical & Cryogenic Storage

High-Performance Polyurethane Solutions for Storage Tanks & Refrigerated Vessels

Configure spray or annular-fill equipment for the selected tank geometry and insulation formulation. CUI risk is managed through substrate protection, moisture control, jacketing, inspection and maintenance. Cryogenic applications require a separately qualified material and insulation design.

CUI Risk Management

Coordinate substrate coating, moisture protection, jacketing, inspection and maintenance. Foam adhesion alone does not establish corrosion immunity.

Material-Specific Temperature Range

Cryogenic and heated-service insulation use separately selected formulations and system designs. Confirm dimensional stability, thermal cycling and applicable material qualification for the intended service. Identify whether the work is external surface spraying or annular filling. Specify the material grade, free-rise and intended in-place density, reaction window and processing viscosity for that route. A blend listed for a beer tank or general vessel does not establish cryogenic qualification.

Separate ambient/heated tanks, cryogenic insulation and annular filling at the proposal stage. Each needs its own material system, temperature duty, moisture barrier and access plan. Spray-line pressure is not the allowable pressure inside a tank or jacket cavity.

Manufacturing Workflow

Production Workflow for Storage Tank & Vessel PU Insulation Machine System

The sequence is configured for the selected application and material. Temperatures, pressures, reaction timing and pass thickness are reference conditions reviewed through project trials.

01

Tank Shell Grit-Blasting & Thermal Priming

The cylindrical tank exterior is grit-blasted to Sa 2.5 cleanliness; anti-corrosive epoxy primers are applied to activate surface chemical bonding.

SURFACE CLEANLINESS: SA 2.5 | PRIMER: EPOXY | PULL-OFF: GREATER THAN 0.35 MPA
02

Precursor Heating & High-Volume Recirculation

Prepare polyol A and isocyanate B separately. Match working viscosity, material temperature, component delivery and ratio to the selected spray or annular-fill package. Heating duty and the full hose route are defined for that package rather than transferred from another machine.

STREAM HEATING: 48°C–56°C | MIX RATIO: SELECTED FORMULATION; COMPONENT CALIBRATION REQUIRED | HOSE REACH: UP TO 90 M
03

Dual-Mode High-Pressure Spray or Annular Pouring

Configure spraying or annular filling with the appropriate head, shot control and dosing package. Pass thickness, pressure, flow and reaction timing follow the selected material and equipment configuration.

INJECTION PRESSURE: 150–180 BAR | OUTPUT: UP TO 50 KG/MIN | CLOSED-CELL: ≥96%
Configuration & Process Parameters

Technical Specifications

Supplied application and equipment references for configuration review. Material properties, operating conditions and acceptance tests are agreed for the selected project.

Technical ParameterSupplied Reference / ConfigurationEngineering Context & Verification
Target ApplicationPetrochemical Storage Tanks, LNG/LPG Vessels, Beer FermentersIndustrial tank thermal envelope & CUI protection
Material MatrixRigid Polyurethane (PUR) / Polyisocyanurate (PIR)Cryogenic and high-temperature formulations
Service-Temperature Application References-160°C to +120°CSeparate cryogenic and heated-service material systems; not one universal formulation
Core Foam Density40 – 60 kg/m³Optimized for thermal insulation & compression
Thermal Conductivity (λ)0.020–0.022 (supplied reference) W/(m·K)Thermal test method, mean temperature, conditioning and aging to be agreed
Closed-Cell Content≥96%Supplied cell-content reference; water absorption and vapor permeance assessed separately
Proportioner Fluid Output12 – 50 kg/minReference annular-fill range; dosing package selected separately from the linked spray product
Equipment delivery pressure differs from enclosed-cavity expansion pressure. Pressure, flow, temperature and hose duty are checked for the selected model. Thermal properties require stated material and test conditions.
Metering, Mixing & Line Equipment

Reference Haifeng Insulation Equipment

The linked HF-SP03 is a spray-equipment reference. Its rated pressure, flow and hose configuration apply to that product; an annular-fill package is separately sized for the required shot and material. The linked spray reference does not by itself establish annular filling or cryogenic suitability. Specify the selected delivery and receiving interfaces.

Engineering Considerations

Key Engineering Advantages

Application-specific process controls, tooling and equipment integration.

CUI Risk Management

Coordinate surface protection, moisture exclusion, jacketing and maintenance.

Thermal-System Planning

Select insulation materials and thickness for the service temperature and thermal duty.

Application-Route Selection

Configure spraying or annular filling with compatible dosing, hose and application interfaces.

Access and Output Planning

Review reach, tank access, application conditions and equipment duty against the project plan.

Production Planning Questions

Frequently Asked Questions

Compare production routes, material requirements, equipment configurations and project inputs.

Does spray foam eliminate corrosion under insulation? +
CUI risk is managed through substrate protection, moisture control, jacketing, inspection and maintenance. The insulation system and its detailing are reviewed together.
Can a tank be insulated for service near −160°C? +
Cryogenic service requires a separately qualified formulation and complete insulation design, including thermal cycling and dimensional stability. The equipment is selected for the material processing requirements.
Can a crawler be included? +
Crawler integration is an optional configured scope. Review the tank surface, access, attachment method, travel limits and application controls before selecting it.
Are spraying and annular filling the same configuration? +
They use different application heads and duty requirements. The linked spray product does not establish the 12–50 kg/min annular-fill reference; the required dosing package is separately selected.
How is commissioning scheduled? +
The supplied project reference is 14–18 days on site. Site preparation, access, integration, trials and acceptance scope determine the agreed schedule.
Which material data are needed for a tank insulation proposal? +
Provide the service temperature, tank and jacket geometry, substrate system, material TDS/SDS, reaction window, working viscosity and required insulation properties. State whether each density value is free-rise or in-place and identify the associated test conditions.
How are batch or shot preparation and spray settings separated? +
Spraying uses a gun and layer sequence selected for the material and substrate. Annular filling requires its own shot quantity, sequence, venting, dosing capacity and reaction-window checks. A spray-gun rating does not establish the output or acceptance of an annular-fill package.
What inputs are needed for this configuration? +
Tank geometry, service temperatures, annular gap, substrate protection, material system, jacketing, access and outage window. Identify retained equipment and the required acceptance documents.
What distinguishes spraying from annular filling on a vessel? +
Spraying requires surface access and pass control; annular filling requires cavity dimensions, seals, vents and a validated filling sequence. Confirm different connection and pressure limits for the selected route.

Discuss Your Insulation Equipment and Application

Share the following for this application: Tank geometry, service temperatures, annular gap, substrate protection, material system, jacketing, access and outage window. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Contact us

For how we handle your inquiry information, read our Privacy Policy.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube