Warehouse Flat Roof SPF Insulation Project in Saudi Arabia

Haifeng deployed an SPF roofing system in Saudi Arabia, cutting solar heat penetration by 60% and HVAC power use by 42% on a 32,000 m² logistics warehouse.

Project Overview

Illustration notice. Process illustrations are not verified photographs of this installation.

Project reference basis. Figures and configuration details are reported in the supplied project brief. They are reference values for the stated application, rather than verified acceptance results or a guarantee for another installation. Confirm the source records, material, tooling, operating schedule and test method when assessing a comparable project.

Haifeng successfully commissioned a commercial spray polyurethane foam (SPF) roofing system for a premier temperature-controlled logistics hub developer in Saudi Arabia, slashing solar heat penetration through flat concrete roofs by 60% while eliminating roof membrane puncture risks. The turnkey installation included a heavy-duty hydraulic proportioner, a 75-meter heated fluid delivery line, pneumatic drum agitators, and self-cleaning airless spray guns.

Prior to commissioning, the logistics developer experienced soaring HVAC operating costs. In the desert climate of Riyadh, intense solar radiation elevated concrete roof deck surface temperatures beyond 70°C, overloading chillers and causing localized thermal degradation in food warehousing sections. The client required an industrial in-situ chemical spraying setup capable of pumping high-viscosity polyols in hot climates, locking the volumetric ratio at 1:1, and applying a monolithic 60mm closed-cell foam insulation barrier directly across 32,000 m² of flat concrete roof area.

Operating during early morning and evening temperature windows, the application team completed up to 1,500 m² daily. By deploying Haifeng's closed-loop Ratio Lock flow controls and high-velocity impingement guns, the contractor applied an unbroken, wind-uplift-resistant cellular insulation blanket that cuts warehouse cooling electricity consumption by over 40%.

Project Technical Specification Matrix:

Solution Module Target Area Core Material Main Process Typical Operation Mode
Roof Insulation Logistics Warehouses (32,000 m²) Closed-Cell Rigid PU (42 kg/m³) High-Pressure Airless Spraying Mobile Commercial Contractor Setup

Solutions Delivery

Haifeng deployed an industrial high-pressure spray platform engineered for high-temperature desert flat roof environments:

1. Hydraulic Ratio Lock Proportioning: High-pressure displacement pumps maintain a precise 1:1 chemical delivery at 170 bar, preventing ratio drift in high ambient heat.
2. Multi-Zone Heated Hose Delivery: Insulated delivery lines ensure precursor chemical temperatures remain within 52°C (±1.0°C), preventing premature surface skinning.
3. Pneumatic Chemical Transfer Skids: Heavy-duty drum transfer pumps with dynamic agitators circulate polyol drums to keep formulation additives evenly dispersed.
4. Protective Reflective Coating: After foam curing, a high-albedo elastomeric coating was applied to reflect solar radiation and shield the foam matrix.

Installation and commissioning: 12 days. Operator training: 3 days. Machine warranty: 1 year. Long-term spare parts and remote equipment support are available.

Equipment Model Qty Function
Hydraulic High-Pressure Spray Unit HF-SPF-H180 1 Unit Primary fluid heating, hydraulic ratio metering & high-pressure delivery
75m Multi-Zone Heated Hose Line HF-HOSE-75M 1 Set Maintaining precursor chemical temperature and pressure across flat roofs
Airless Mechanical Spray Gun HF-GUN-AIRLESS 2 Units Impingement mixing and wide-pattern fan atomization for flat concrete
Pneumatic Chemical Transfer Pumps HF-PUMP-2:1 2 Units Feeding chemicals from 200L drums into the primary proportioner
Master Electrical System Cabinet HF-PLC-MOBILE 1 Set Multi-zone temperature regulation, ratio monitoring & emergency interlocks

Project Results

60%
Solar Heat Reduction
Thermal flux reduction measured entering warehouse interior through flat concrete deck. Baseline: Uninsulated bare concrete roof baseline. Measurement conditions: Heat flux transducer testing under 48°C ambient.
42%
HVAC Cooling Power Savings
Chiller electrical power savings achieved following 60mm SPF roof application. Baseline: Historical summer warehouse power draw. Measurement conditions: 90-day post-retrofit summer electrical audit.
1,500 m²
Daily Application Output
Peak square-meter coverage applied per operational working shift across open roofs. Baseline: 500 m² on manual board laying. Measurement conditions: Field construction progress logs across 32,000 m².

Plan a Similar Insulation Equipment Project

Share your application, material system, target output and factory conditions. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube