Solvent-Free Material Batching Project
Explore a Haifeng solvent-free material batching installation with preparation, dispersion and transfer equipment in a multi-level arrangement.
A Haifeng-Delivered Chemical Processing Application
Haifeng delivered this solvent-free chemical material batching project. The engineering task combined material preparation, dispersion and transfer equipment within a multi-level installation for the selected material system.
Engineering Task and Delivered Scope
| Project area | Published delivery information |
|---|---|
| Preparation and batching | The delivered scope covers the selected solvent-free material preparation application. |
| Dispersion and transfer | Preparation equipment is coordinated with the material’s dispersion and downstream transfer duties. |
| Multi-level installation | The site photographs document the equipment and supporting arrangement; the process illustration is identified separately. |
Customer and supplier identities, location, formulation and numerical operating records are withheld. Project photographs are edited to remove identifying details; any concept illustrations are captioned separately.
Project Questions
Does this case establish that the entire factory uses no solvents?
No. The reference concerns the selected solvent-free preparation and batching application. Cleaning and other factory operations are outside that statement.
Can its process illustration be used as a construction drawing?
No. It explains the application. The as-supplied equipment, interfaces and installation documents are specific to the agreed project.
Equipment and Integration Scope
The project brings material preparation, dispersion and transfer into a coordinated installation. Site photographs are used as installation evidence and the process concept is labeled as illustrative. The solvent-free description concerns the selected production formulation; it does not certify every cleaning procedure or factory operation.
Installation and Process Views



Discuss a Similar Project
Send your application, material data and factory-interface requirements. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.