Medical Furniture Integral Skin PU Line Project in Russia Banner background

Medical Furniture Integral Skin PU Line Project in Russia

Integral-Skin Medical Furniture Components in Russia project reference: Metering, mold filling, tilting fixtures, thermal control and finishing for the specified integral-skin components.

Project Reference and Configuration

Illustration notice. Process illustrations are not verified photographs of this installation.

Project reference basis. Figures and configuration details are reported in the supplied project brief. They are reference values for the stated application, rather than verified acceptance results or a guarantee for another installation. Confirm the source records, material, tooling, operating schedule and test method when assessing a comparable project.

This project reference describes metering, mold filling, tilting fixtures, thermal control and finishing for the specified integral-skin components.

Configuration and numerical values are reproduced from the supplied project brief for discussion. Original production, inspection and acceptance records have not been verified; these values do not establish certification or performance for another configuration.

Configuration Listed in the Project Brief

Solution ModuleTypical Panels / PartsCore MaterialMain ProcessTypical Production Mode
Furniture & Comfort FoamMedical Furniture Armrests & HeadrestsIntegral Skin PU (Water-Blown)In-Mold Reaction FoamingTilting Multi-Fixture Workcell

Equipment References in the Project Brief

The supplied brief lists the following equipment references. Model identities, quantities and the actual delivery scope follow the original equipment schedule.

1. Precision Integral Skin Dosing Machine: Micro-shot stoichiometric ratio metering and high-velocity impingement injection
2. Multi-Angle Hydraulic Tilting Clamp: Automated pneumatic/hydraulic mold tilting (0°–45°) for mold venting
3. Dual-Circuit Dynamic TCU System: Precision dynamic fluid and mold thermal balancing for medical tooling
4. Master Automation PLC Control Cabinet: Complete recipe storage, tilt sequencing, and cycle timing management

Installation, training, warranty and service arrangements follow the project agreement; durations in this brief are references.

EquipmentModelQtyFunction
Precision Integral Skin Dosing MachineHF-HP-SKIN201 UnitMicro-shot stoichiometric ratio metering and high-velocity impingement injection
Multi-Angle Hydraulic Tilting ClampHF-TILT-CLAMP6 UnitsAutomated pneumatic/hydraulic mold tilting (0°–45°) for mold venting
Dual-Circuit Dynamic TCU SystemHF-TCU-362 UnitsPrecision dynamic fluid and mold thermal balancing for medical tooling
Master Automation PLC Control CabinetHF-PLC-COMPACT1 SetComplete recipe storage, tilt sequencing, and cycle timing management

Project Reference Values

100% reported sample
Reference: Disinfectant-Test
Project-brief reference; original records pending. The brief lists a sample pass result after 5,000 alcohol wipes, compared with deterioration after 200 wipes on the baseline. Confirm disinfectant concentration, specimen count and acceptance criteria; it does not establish universal chemical resistance.
120 s
Reference: Submitted Demolding-Time
Project-brief reference; original records pending. The brief lists 120 s for injection, skin cure and demolding, compared with 360 s on the baseline. Confirm the full station-entry-to-demold cycle, cavities and output interval separately.
0 reported defects
Reference: Surface-Inspection
Project-brief reference; original records pending. The brief lists no detected pinholes in a 500-part visual sample and an 8.4% baseline defect rate. Confirm the inspection procedure; this finite sample is not a future defect-free promise.

Start a Similar Project

Discuss your furniture product, material formulation, capacity and automation requirements with Haifeng.