Storage Tank Polyurea Lining Retrofit Project in China

Project draft for review

Project Overview

Illustration notice. Process illustrations are not verified photographs of this installation.

Project reference basis. Figures and configuration details are reported in the supplied project brief. They are reference values for the stated application, rather than verified acceptance results or a guarantee for another installation. Confirm the source records, material, tooling, operating schedule and test method when assessing a comparable project.

A leading coastal petrochemical storage terminal operator deployed Haifeng’s high-pressure hydraulic polyurea spraying equipment to execute a major lining retrofit for a 50,000 m³ vertical crude oil storage vessel. The project required replacing a degraded epoxy glass-flake coating with an impervious 2.0 mm pure polyurea elastomeric barrier across 18,000 m² of internal sidewall and bottom steel surfaces.

The client had encountered premature cracking and interfacial blisters in the legacy lining after just 36 months of service, caused by corrosive sulfur compounds and acidic brine bottoms settling in the tank sump. The key challenge was achieving continuous atomization across an 18-meter wall elevation without pressure drops, which cause fatal stoichiometry imbalances and microscopic pinholes.

Haifeng engineered a complete field spraying package centered on the HF-PU200-HYD hydraulic proportioner. Paired with 90-meter insulated heated hoses and high-elevation pneumatic drum transfer pumps, the system enabled uninterrupted high-velocity impingement spraying, meeting the client’s fast-track turnaround schedule.

Solutions Delivery

Haifeng configured a heavy-duty field deployment capable of handling the large vertical scale of the petrochemical storage tank. Two mobile hydraulic proportioning skids were stationed at ground level adjacent to the tank manway. High-volume transfer pumps drew amine curatives and isocyanates directly from 200 L drums through sealed desiccant breathers.

To combat coastal temperature drops during nighttime shifts, the chemical streams were heated to 68°C within the machine’s primary heaters and pumped through 90-meter copper-mesh jacketed hoses routed up internal scaffolding. Constant hydraulic fluid displacement ensured that fluid pressures remained at 18.0 MPa without pulsing during hydraulic valve reversals.

Spray technicians operated mechanical-purge impingement spray guns, laying down successive multi-pass coats to build a seamless 2.0 mm membrane. The mechanical purge rod kept spray orifices clear during brief repositioning pauses without venting solvents inside the confined storage tank.

EquipmentModelQtyFunction
Hydraulic High-Pressure ProportionerHF-PU200-HYD2 setsCore hydraulic metering and fluid heating to 18 MPa and 68°C.
Long-Reach Heated Hose AssemblyHF-HH-90M2 sets90-meter copper-mesh insulated hoses maintaining fluid temperature up to scaffolding levels.
Mechanical-Purge Spray GunHF-MPG-024 unitsSolvent-free impingement atomization and automated mechanical clearing.
Pneumatic Feed Pump SetHF-FP-3002 pairsContinuous transfer of chemical components from 200 L drums to primary heaters.

Reported Project Results — Pending Record Verification

0
High-Voltage Pinhole Defects
Reported in the supplied project brief: Reported across 100% of the 18,000 m² polyurea lining via 15 kV continuous spark testing.
35%
Turnaround Time Savings
Reported in the supplied project brief: Completed lining operations in 22 operating days versus 34 days planned for traditional coatings.
18.0 MPa
Continuous Spray Pressure
Reported in the supplied project brief: Stable hydraulic delivery throughout 90-meter vertical hose runs with less than 0.2 MPa drift.