Geodesic Dome Complex PU Insulation Project in Saudi Arabia
Haifeng deployed an adaptive spray PU system in Saudi Arabia, achieving 100% anti-sag adhesion and 0.32 MPa bond strength across a 68m geodesic landmark dome.
Project Overview
Illustration notice. Process illustrations are not verified photographs of this installation.
Project reference basis. Figures and configuration details are reported in the supplied project brief. They are reference values for the stated application, rather than verified acceptance results or a guarantee for another installation. Confirm the source records, material, tooling, operating schedule and test method when assessing a comparable project.
Haifeng successfully engineered and deployed an adaptive spray polyurethane foam (SPF) insulation system for a premier cultural center landmark contractor in Saudi Arabia, achieving a 100% pass rate in overhead anti-sag adhesion across a 68-meter-diameter freeform geodesic dome. The turnkey project delivered a high-pressure hydraulic proportioning machine, 75 meters of heated delivery line, specialized anti-sag airless spray guns, and precision pneumatic transfer pumps.
Prior to commissioning, the project engineers faced design bottlenecks with traditional insulation boards on the compound-curved dome. Conventional flat insulation boards could not conform to the varying 3D radius of the metal latticework without leaving thousands of wedge-shaped gaps that ruined thermal insulation and risked detachment onto visitors below. The client required an agile on-site chemical spraying setup capable of atomizing fast-curing polyurethane formulations continuously across steep vertical and inverted overhead angles, locking the volumetric ratio at 1:1, and creating a seamless 60mm acoustic and thermal barrier.
Operating from elevated articulated boom lifts, the contractor's teams applied up to 700 m² daily. By deploying Haifeng's closed-loop Ratio Lock flow controls and fast-cream anti-sag formulations, the contractor applied an unbroken, acoustically dampening insulation blanket that adheres to complex curves without dripping and reduces interior reverberation noise.
Project Technical Specification Matrix:
| Solution Module | Target Area | Core Material | Main Process | Typical Operation Mode |
|---|---|---|---|---|
| Special & Industrial | Irregular Geodesic Domes | Rigid Open/Closed PU (42 kg/m³) | High-Pressure Airless Spraying | Articulated Boom Lift In-Situ Rig |
Solutions Delivery
Haifeng deployed an industrial high-pressure spray platform engineered for complex 3D curved architecture:
1. Hydraulic Ratio Lock Proportioning: High-pressure hydraulic drive delivers chemicals at 165 bar, preventing fluid pressure drops during continuous elevation changes on boom lifts.
2. Multi-Zone Heated Delivery Hoses: Insulated delivery lines ensure chemical precursors remain at 54°C (±1.0°C) across runs up to 75 meters inside the vaulted dome.
3. Anti-Sag Airless Spray Guns: Mechanical purge impingement guns atomize fast-cream chemicals that gel within 2.5 seconds, preventing sagging or dripping on inverted ceiling angles.
4. Seamless Acoustic & Thermal Layering: Successive multi-pass applications built up a uniform 60mm layer across complex steel framing nodes, completely eliminating acoustic flanking paths.
Installation and commissioning: 16 days. Operator training: 4 days. Machine warranty: 1 year. Long-term spare parts and remote equipment support are available.
| Equipment | Model | Qty | Function |
|---|---|---|---|
| Hydraulic High-Pressure Spray Unit | HF-SPF-H180 | 1 Unit | Primary fluid heating, hydraulic ratio metering & high-pressure delivery |
| 75m Multi-Zone Heated Hose Line | HF-HOSE-75M | 1 Set | Maintaining precursor chemical temperature across 3D dome elevations |
| Anti-Sag Impingement Spray Gun | HF-GUN-ANTISAG | 2 Units | Mechanical purge mixing and fan atomization for vertical and inverted ceilings |
| Pneumatic Chemical Transfer Skids | HF-PUMP-2:1 | 2 Units | Continuous chemical drum feeding to the primary proportioner |
| Master Automation PLC Control Cabinet | HF-PLC-MOBILE | 1 Set | Complete recipe storage, hose heating regulation & safety interlocks |
Project Results
Plan a Similar Insulation Equipment Project
Share the application, substrate or pipe geometry, insulation formulation, output and site conditions with Haifeng.