Geodesic Dome Complex PU Insulation Project in Saudi Arabia Banner background

Geodesic Dome Complex PU Insulation Project in Saudi Arabia

Haifeng deployed an adaptive spray PU system in Saudi Arabia, achieving 100% anti-sag adhesion and 0.32 MPa bond strength across a 68m geodesic landmark dome.

Project Overview

Illustration notice. Process illustrations are not verified photographs of this installation.

Project reference basis. Figures and configuration details are reported in the supplied project brief. They are reference values for the stated application, rather than verified acceptance results or a guarantee for another installation. Confirm the source records, material, tooling, operating schedule and test method when assessing a comparable project.

Haifeng successfully engineered and deployed an adaptive spray polyurethane foam (SPF) insulation system for a premier cultural center landmark contractor in Saudi Arabia, achieving a 100% pass rate in overhead anti-sag adhesion across a 68-meter-diameter freeform geodesic dome. The turnkey project delivered a high-pressure hydraulic proportioning machine, 75 meters of heated delivery line, specialized anti-sag airless spray guns, and precision pneumatic transfer pumps.

Prior to commissioning, the project engineers faced design bottlenecks with traditional insulation boards on the compound-curved dome. Conventional flat insulation boards could not conform to the varying 3D radius of the metal latticework without leaving thousands of wedge-shaped gaps that ruined thermal insulation and risked detachment onto visitors below. The client required an agile on-site chemical spraying setup capable of atomizing fast-curing polyurethane formulations continuously across steep vertical and inverted overhead angles, locking the volumetric ratio at 1:1, and creating a seamless 60mm acoustic and thermal barrier.

Operating from elevated articulated boom lifts, the contractor's teams applied up to 700 m² daily. By deploying Haifeng's closed-loop Ratio Lock flow controls and fast-cream anti-sag formulations, the contractor applied an unbroken, acoustically dampening insulation blanket that adheres to complex curves without dripping and reduces interior reverberation noise.

Project Technical Specification Matrix:

Solution ModuleTarget AreaCore MaterialMain ProcessTypical Operation Mode
Special & IndustrialIrregular Geodesic DomesRigid Open/Closed PU (42 kg/m³)High-Pressure Airless SprayingArticulated Boom Lift In-Situ Rig

Solutions Delivery

Haifeng deployed an industrial high-pressure spray platform engineered for complex 3D curved architecture:

1. Hydraulic Ratio Lock Proportioning: High-pressure hydraulic drive delivers chemicals at 165 bar, preventing fluid pressure drops during continuous elevation changes on boom lifts.
2. Multi-Zone Heated Delivery Hoses: Insulated delivery lines ensure chemical precursors remain at 54°C (±1.0°C) across runs up to 75 meters inside the vaulted dome.
3. Anti-Sag Airless Spray Guns: Mechanical purge impingement guns atomize fast-cream chemicals that gel within 2.5 seconds, preventing sagging or dripping on inverted ceiling angles.
4. Seamless Acoustic & Thermal Layering: Successive multi-pass applications built up a uniform 60mm layer across complex steel framing nodes, completely eliminating acoustic flanking paths.

Installation and commissioning: 16 days. Operator training: 4 days. Machine warranty: 1 year. Long-term spare parts and remote equipment support are available.

EquipmentModelQtyFunction
Hydraulic High-Pressure Spray UnitHF-SPF-H1801 UnitPrimary fluid heating, hydraulic ratio metering & high-pressure delivery
75m Multi-Zone Heated Hose LineHF-HOSE-75M1 SetMaintaining precursor chemical temperature across 3D dome elevations
Anti-Sag Impingement Spray GunHF-GUN-ANTISAG2 UnitsMechanical purge mixing and fan atomization for vertical and inverted ceilings
Pneumatic Chemical Transfer SkidsHF-PUMP-2:12 UnitsContinuous chemical drum feeding to the primary proportioner
Master Automation PLC Control CabinetHF-PLC-MOBILE1 SetComplete recipe storage, hose heating regulation & safety interlocks

Project Results

100% Pass
Overhead Anti-Sag Adhesion
Zero foam dripping or sagging recorded during inverted overhead dome spraying. Baseline: Heavy sagging on standard spray formulations. Measurement conditions: Inverted ceiling adhesion pull-off testing.
0.32 MPa
Tensile Bond to Curved Steel
High-strength chemical bond achieved directly against curved painted steel backing. Baseline: 0.05 MPa on glued board systems. Measurement conditions: ASTM D1623 pull-off tensile adhesion testing.
700 m²
Daily Application Output
Completed 3D compound curve coverage applied per shift from articulated lifts. Baseline: 150 m² on manual board fitting. Measurement conditions: Field construction progress logs across 68m dome.

Plan a Similar Insulation Equipment Project

Share the application, substrate or pipe geometry, insulation formulation, output and site conditions with Haifeng.