Plan molded PU insoles around the formulation, cavity design and existing line. Define metering, tooling, mold handling and finishing duties for the selected production mix.

Application and Production Scope

Configure Molded PU Insoles Around the Product

Plan a molded PU insole process around the selected formulation, insole geometry, batch mix and tooling. Low-pressure metering and mixing supply the mold; material preparation, degassing, mold handling and automation are selected for the agreed line scope.

Insole Materials and Tooling

Define density, hardness, rebound, compression set and any functional requirements with the material supplier and finished-insole test plan. Prototype molds and production molds serve different batch and handling needs.

New Lines and Existing-Line Upgrades

Review the metering unit, mold carriers, available space, utilities and control interfaces before selecting new equipment or retrofit work. Automated pouring and handling are individually specified options.

The line proposal defines the selected materials, equipment, tooling, automation and acceptance responsibilities. Equipment ratings and reported project results apply to their stated configurations and conditions. For an insole upgrade, list the retained feed equipment, molds and carriers before selecting replacement modules. Assign material preparation, pouring, cure residence, demolding and trimming to the supplied equipment or the operator; agree a trial using the intended insole and daily style changes.

Производственный процесс

Molded PU Insole Production Workflow

Use the selected product, material and tooling to define the operating sequence. Commissioning, training and project milestones are specified separately in the delivery plan.

01

Prepare the Selected PU System

Condition the polyol and isocyanate components for the selected formulation. Define any drying, degassing and feed preparation with the material data and equipment scope.

MATERIAL PREPARATION AND FEED CONDITIONS
02

Prepare Insole Molds

Arrange the correct mold cavities, release procedure, inserts or substrates and mold temperature for the insole construction.

MOLD CAVITIES, INSERTS AND TEMPERATURE
03

Дозирование, смешивание и подача

Set the component ratio and shot weight for the selected formulation and cavity volume. Confirm stable dispensing during trials.

RATIO, SHOT WEIGHT AND MIXING
Configuration and Acceptance

Line Configuration and Engineering Conditions

Define the actual product, supply scope, interfaces and validation basis before setting production targets or site-service requirements.

Planning itemConfiguration and acceptance basis
Product routeMolded PU insoles; select the formulation, cavity design and any insert or substrate for the intended footwear.
Дозирование и смешиваниеReview the HF-LPM-2A1B-F insole configuration against shot weight, ratio, viscosity and the required dispensing window. Equipment ratings apply to the selected unit and conditions.
ОснасткаSpecify prototype or production molds, cavity count, release method, temperature control and handling interfaces.
ChangeoversDefine compatible material and color changes, the cleaning procedure and time to an acceptable first part in the agreed trial.
Line integrationSelect manual or automated pouring, mold movement and demolding tasks after reviewing the existing line and production schedule.
Site utilitiesSize electrical supply, compressed air and any thermal or ventilation services from the selected equipment list and site layout.
ПриёмкаAgree separate checks for equipment operation and finished-insole dimensions, rebound, compression set or other specified properties.
Delivery planningDefine equipment supply, tooling responsibilities, formulation support, commissioning, operator training and acceptance milestones in the project agreement.

Equipment Roles and Supply Interfaces

Equipment optionRole and scope
Низконапорная установка для вспенивания ПУ | Обувные стелькиReview equipment. Core low-pressure metering and mixing option for molded PU insoles. Production molds, carriers and automated tasks are defined separately in the line proposal.

Related Footwear Planning

Footwear factory planning | Independent PU sole molding | PU safety shoe production

Final ratings, layout, utilities and acceptance conditions follow the selected configuration and technical agreement.
Инженерные аспекты

Configuration and Engineering Considerations

Select the process and equipment around the actual product and agreed production scope.

Подготовка материала

Coordinate component conditioning and degassing with the selected formulation and shot requirements.

Insole Tooling

Define prototype and production molds, inserts, cavity population and handling responsibilities.

Handling and Changeovers

Select automation and cleaning interfaces for the batch mix and existing production arrangement.

Product Qualification

Verify finished-insole properties using the agreed material, process and test methods.

Production Planning

Вопросы и ответы по планированию производства

Clarify the material route, tooling, equipment scope and validation requirements for your product.

Can the same line support prototypes and regular production? +
The metering duty, prototype molds, production molds and handling arrangement must each fit the batch. Review the smallest stable shot and the planned changeovers before selecting a shared configuration.
Are rebound or antimicrobial properties machine specifications? +
They are material and finished-insole properties. Specify the formulation, required properties and test methods separately from equipment operation and metering acceptance.
Is a fixed color-change time included? +
The timing depends on feed circuits, material compatibility, cleaning and the acceptable first-part criterion. Agree a changeover trial with the intended materials instead of applying one time to every formulation.
Can an existing circular or banana-shaped line be upgraded? +
Assess carriers, mold access, utilities, controls and current cycle tasks first. The proposal then identifies reusable equipment, new modules and remaining manual work.
What information is needed for an insole proposal? +
Insole drawings or samples, shot weight, material data, cavity count, batch sizes, daily style changes, shift schedule and existing carrier, control and utility interfaces. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.
How should an insole upgrade be divided into retained and new equipment? +
Create a module list showing what stays, what is replaced and who supplies each connection. Check mold access, carrier motion, material feed, controls and operator tasks together. Use the selected formulation and tooling to agree the changeover and first-acceptable-part checks.

Discuss Your PU Insole Line

Share the following for this application: Insole drawings or samples, shot weight, material data, cavity count, batch sizes, daily style changes, shift schedule and existing carrier, control and utility interfaces. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Связаться с нами

О том, как мы обрабатываем информацию из вашего запроса, читайте в Политика конфиденциальности.

Сроки ответа подтверждаются по запросу Расчёт без обязательств Возможно подписание NDA
Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube