PU Steering Wheel Foaming Line Upgrade in Zhejiang

Project Background Located in an auto parts industrial park in Zhejiang Province, the customer is a manufacturer specializing in automobile steering wheels and interior parts, producing about 300,000 steering wheels and interior parts per year with revenue of about RMB 92 million in 2025. Challenges The original semi-automatic lines relied on manual metering and color mixing, causing a defect rate of 8%–10%, poor two-color consistency, low efficiency and safety risks that blocked high-end OEM orders. Haifeng Solution The customer adopted the Haifeng turnkey PU steering wheel foaming line, integrating an HF-HPM high-pressure foaming machine, a six-station hydraulic mold frame line, a two-pigment six-mixing-head system and an electrical safety control system. Results Output rose from 600 to 1,080 pcs/day, defect rate fell to ≤2%, manpower dropped from 12 to 4, with annual savings of about RMB 850,000 and a payback period of about 3.1 years.

Configuración de la línea llave en mano

The customer selected the Haifeng PU steering wheel foaming line turnkey solution, consisting of an HF-HPM high-pressure foaming machine, a six-station hydraulic mold frame line, a two-pigment six-mixing-head system and an electrical safety control system.

Equipos Modelo Cant. Función
Máquina de espumado a alta presión de la serie HF-HPM HF-HPM-1A1B-SteeringWheel 1 unidad 1 unidad hidráulica, 2 unidades de dosificación de componentes, 2 unidades de dosificación de pigmento, 6 cabezales de mezcla; mezcla por impacto a alta presión y vertido dosificado
Marcos de molde hidráulicos 6 unidades Accionados por 2 unidades hidráulicas; apertura, cierre, bloqueo, extracción de machos y expulsión, controlados por PLC
Sistema eléctrico y de control de seguridad 1 unidad 1 main control cabinet + 2 pigment control cabinets + 6 mold frame control boxes + 6 safety light curtains
Unidad de control de temperatura 1 unidad Heating 4×3 kW, cooling 15,000 kcal/h, keeping material temperature stable

Resultados de la actualización

+80%
Producción diaria
Output up from 600 to 1,080 pcs/day
≤2%
Tasa de defectos del producto terminado
Project-reported defect rate reduced from 8%–10% to ≤2%. Figures apply to the stated project conditions; no single relative reduction is inferred from the baseline range.
-67%
Mano de obra
Operators cut from 12 to 4
PU Steering Wheel Foaming Line Upgrade Case Zhejiang, China-2
PU Steering Wheel Foaming Line Upgrade Case Zhejiang, China-1

¿Busca una solución similar?

Explore our turnkey PU steering wheel foaming line to upgrade your steering wheel and interior part production.

PU Steering Wheel Foaming Line Solution | Automotive InteriorsPU

Planifique su proyecto de producción de poliuretano

Nuestro equipo de ingeniería está listo para diseñar una solución personalizada de maquinaria de PU que se ajuste a sus objetivos de producción, estándares de calidad y plan de inversión. Nuestro equipo responderá en un plazo de un día hábil. Una vez claros los requisitos, presentamos una propuesta preliminar en un plazo de dos días hábiles.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube