Water Tank Insulation Foaming Solution Banner background
حلول التصنيع

حل رغوة عزل خزان المياه

جهّز عزل البولي يوريثان بالقذفات الصغيرة حول خزانات المياه الخاصة بالأجهزة المنزلية باستخدام تجهيزات قالبية مفهرسة، وتوزيع مُتحكَّم فيه، وسلامة هيكل خاصة بالمشروع.

هدف الإنتاج

Plug-and-Play Precision Insulation for Compact Water Heating Boilers

Configure small-shot polyurethane insulation around appliance water tanks with indexed tooling, controlled dispensing and project-specific enclosure safety. Core interfaces cover micro-shot metering and mixing, rotary tooling, temperature controls and takeoff handling. Hydrocarbon ventilation, detection, interlocks, discharge routing and hazardous-area classification remain site-specific design requirements, including equipment outside the enclosure.

المنتج والمواد والتجهيزات القالبية

Core interfaces cover micro-shot metering and mixing, rotary tooling, temperature controls and takeoff handling. Hydrocarbon ventilation, detection, interlocks, discharge routing and hazardous-area classification remain site-specific design requirements, including equipment outside the enclosure.

السعة والقبول

راجع جميع مراحل التحضير والتوزيع والمعالجة والمناولة والفحص. وتتطلب نتائج المواد والمكونات ظروف اختبار متفقًا عليها بشكل منفصل.

Treat enclosure protection as a continuous operating requirement, not an isolated production step. Balance small-shot delivery, loading, indexing and material cure on one workstation schedule; installed ventilation and blowing-agent interfaces need their actual site basis.

سير عمل التصنيع

Turnkey Compact Tank Foaming Workflow

تسلسل العملية المقدم هو مرجع للإعداد. وتُؤكَّد إعدادات الحرارة والضغط والإنتاج وزمن المعالجة للمادة والتجهيزات القالبية المختارة.

01

Boiler Loading & Pneumatic Mold Clamping

Configured reference: The operator loads the stainless vessel into Station 1 of the rotary indexer, where pneumatic clamps seal aluminum tooling shells around the tank.

LOAD TIME < 8 S; PNEUMATIC CLAMPING FORCE 15 KN
02

Micro-Flow High-Pressure Impingement Shot

Configured reference: The miniature mixing head docks at Station 2, injecting 115 g of cyclopentane-polyurethane at 16.0 MPa in 1.1 seconds with ±0.2 g accuracy.

SHOT RATE 50–200 G/S; SHOT REPEATABILITY ±0.2 G
03

Enclosed Forced-Draft Hydrocarbon Ventilation

Engineer ventilation, detection thresholds, interlocks and exhaust routing for the installed hydrocarbon process. A self-contained booth does not establish certification or eliminate the site hazard assessment.

SUPPLIED VENTILATION REFERENCE 1,500 M³/H; SETPOINTS AND HAZARDOUS-AREA BOUNDARIES REQUIRE DESIGN VALIDATION
المدخلات الهندسية

النطاق الهندسي للحل المرجعي

قيم منقولة من موجز التكوين المقدَّم. خصائص المواد ومعايير المنتج النهائي هي أهداف تحقق منفصلة، وليست ضمانات عامة للمعدات.

المعاملالقيمة / الوحدةالتكوين / الظروف المطبَّقة
Workstation External Dimensions2,200 mm x 2,100 mm x 2,350 mmSelf-contained enclosure fitting standard lean cell; supplied reference requiring configuration or test verification
Continuous Hourly Output100 to 120 finished vessels/hour4-station automated rotary indexing on 30s tact; supplied reference requiring configuration or test verification
Chemical Injection Output50.0 to 200.0 g/sMiniature servo axial piston high-pressure skid; supplied reference requiring configuration or test verification
Single Shot Weight AccuracyWithin ±0.2 gramsHigh-precision micro-metering at 120 g shot; supplied reference requiring configuration or test verification
Standby Electric Loss Cut18% thermal loss reductionSeamless polyurethane wrap vs preformed clamshells; supplied reference requiring configuration or test verification
ATEX Explosion-Proof ComplianceProject-specific assessment and documented scopeHazardous-area classification, components, detection, ventilation and installed interfaces require engineering and original certification records
Curing residence follows the agreed station sequence and indexing time. Site safety engineering and applicable hazardous-area requirements are assessed for the complete installation.
تكوين العملية

Core Advantages of Haifeng Compact Tank Systems

وظائف هندسية وواجهات مطوّرة للمنتج ونظام المواد المحددين.

Small-shot verification

Calibrate the selected shot and inspect cutoff with the actual material.

Tank positioning

Define supports, cavity seals and changeover for each vessel family.

Installed enclosure

Coordinate material supply, exhaust, detection and interlocks with the site.

Residence balance

Include cure and removal in the indexing/output calculation.

أسئلة التخطيط

الأسئلة الشائعة

أسئلة فنية لتحديد نطاق المعدات ونافذة المواد وخطة التحقق.

What safety assessment is required for the installed enclosure? +
A local enclosure does not remove the need for a site-specific hazardous-area assessment. Cyclopentane supply, exhaust discharge, utilities and certification scope are reviewed for the installed system.
Can different vessel sizes share the workstation? +
Interchangeable tools and recipes can support different vessels. Model changeover time and seal checks depend on the actual tooling arrangement.
How is nozzle cutoff quality verified? +
A shutoff mechanism can support controlled cutoff. Dripping, stringing and port contamination require validation for viscosity, reaction speed and nozzle design.
Can different blowing-agent systems be considered? +
The metering system can be assessed for water-blown or hydrocarbon-blown recipes. Material compatibility, ratios, temperature and safety controls must be confirmed for each chemistry.
ما المدخلات اللازمة لهذا التكوين؟ +
Vessel/cavity drawings, shot and material, sizes/changeovers, indexing/cure sequence, enclosure, utilities and site interfaces. Identify retained equipment and the required acceptance documents.
How should a compact tank cell balance indexing and cure? +
Follow each vessel through preparation, injection, residence and removal, including simultaneous tasks and operator work. Compare the output target with that schedule rather than equating a short motion with a fully cured vessel.

Request a Compact Tank Insulation Proposal

Share the following for this application: Vessel/cavity drawings, shot and material, sizes/changeovers, indexing/cure sequence, enclosure, utilities and site interfaces. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

اتصل بنا

لمعرفة كيفية تعاملنا مع معلومات استفسارك، اقرأ سياسة الخصوصية.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube