Pipe and Pipeline PU Insulation Solution Banner background

حل عزل الأنابيب وخطوط الأنابيب بالبولي يوريثان

هيّئ معدات عزل البولي يوريثان للأنبوب-داخل-الأنبوب وفق أبعاد الأنبوب والحجم الحلقي وبيانات المواد والإنتاجية. ويُنسّق التمركز والإحكام والجرعات والمناولة بما يتوافق مع نظام الأنابيب المختار.

DN50–1200 Reference pipe-diameter range
≥0.12MPa Supplied axial-shear reference; test conditions apply
30–80كغ/دقيقة Reference dosing range; configuration dependent
Subterranean & Overhead Fluid Thermal Protection

Precision Pipe-in-Pipe Polyurethane Injection Solutions for District Energy & Process Lines

Configure pipe-in-pipe metering, centering, sealing and handling for the selected pipe dimensions and PU formulation. Jacket integrity, joints, moisture protection and thermal-expansion design are assessed for the complete pipe system.

Pipe-System Design

Bonding, pipe supports, joints and thermal movement are reviewed for the selected system. EN 253 applies to its specified factory-made bonded hot-water pipe construction; other applications require their own standards and acceptance plan.

Filling and Material Selection

Confirm annular volume, shot mass, venting and reaction timing through material and pipe trials. Closed-cell foam is considered together with jacket and joint integrity.

Size pipe centering, sealing, venting and PU injection for the actual annulus and length. Thermal, bond and expansion requirements belong to the complete pipe construction. Resolve differing flow references through the selected working point rather than substituting a number.

سير عمل التصنيع

Production Workflow for Pipe & Pipeline Polyurethane Insulation Line

تم ضبط التسلسل وفقًا للتطبيق والمادة المختارين. تُعد درجات الحرارة والضغوط وتوقيت التفاعل وسُمك الطبقة ظروفًا مرجعية تُراجَع من خلال تجارب المشروع.

01

Steel Pipe Shot-Blasting & Casing Centering

Steel pipes are blasted to Sa 2.5; snap-on plastic centering spiders are attached to center the steel pipe precisely inside the outer HDPE casing pipe.

STEEL PREP: SA 2.5 | CENTERING TOLERANCE: ±2.0 MM | PIPE LENGTH: UP TO 12 M
02

Pipe End Flange Clamping & Venting Setup

Pneumatic or hydraulic end-sealing flanges clamp onto both ends of the pipe assembly, sealing the annular gap while providing micro-perforated air-venting channels.

CLAMPING PRESSURE: 4–6 BAR | AIR VENTING: HIGH-PERMEABILITY FILTER PLUGS
03

High-Pressure Annular Cavity Injection

An L-shaped impingement mixing head docks with the central injection port; servo displacement pumps inject liquid precursors at up to 180 bar within 3–8 seconds.

INJECTION OUTPUT: 30–60 KG/MIN | PRESSURE: 160–180 BAR | SHOT REPEATABILITY: ±0.5% REFERENCE UNDER DEFINED CONDITIONS
الإعداد & معايير العملية

المواصفات الفنية

مراجع التطبيق والمعدات المقدمة لمراجعة الإعداد. تُتفق خصائص المواد وظروف التشغيل واختبارات القبول للمشروع المحدد.

المعلمة الفنيةالمرجع المقدم / الإعدادالسياق الهندسي & التحقق
التطبيق المستهدفDistrict Chilled-Water Lines, Chemical Process PipingUnderground direct-buried & overhead pipelines
مصفوفة الموادRigid Polyurethane Foam (PUR / PIR)Material and pipe-system design selected for the service conditions
Applicable Pipe DiametersDN50 to DN1200 (2 Inch to 48 Inch)Small building risers to giant district trunks
كثافة الرغوة الأساسية60 – 80 kg/m³High compressive and axial shear capability
التوصيل الحراري (λ)0.024–0.026 (supplied reference) W/(m·K)Supplied thermal reference; applicable pipe-system standard and test conditions to be confirmed
Axial Shear Strength≥0.12 MPa (At 23°C and 140°C)Supplied bond reference; define test method and thermal-movement design
إنتاج السائل من جهاز النسب30 – 80 kg/minHigh-output capability for large annular volumes
Equipment delivery pressure differs from enclosed-cavity expansion pressure. Pressure, flow, temperature and hose duty are checked for the selected model. Thermal properties require stated material and test conditions. Generic-model shot repeatability reference: ±0.5% for material viscosity of 100–20,000 cP under operating conditions; the ordered model and agreed test conditions apply.
اعتبارات هندسية

المزايا الهندسية الرئيسية

ضوابط عملياتية وتجهيزات قالبية وتكامل للمعدات مصمّمة وفق التطبيق.

Moisture-Protection Planning

Coordinate jacket integrity, joints and inspection with the insulation design.

Thermal-Performance Review

Specify formulation, thickness and thermal test conditions for the pipe system.

Bond and Movement Verification

Review bond tests and thermal-expansion design for the complete pipe assembly.

Coordinated Pipe Handling

Arrange centering, clamping, injection and transfer around the required pipe duty.

أسئلة تخطيط الإنتاج

الأسئلة الشائعة

قارن مسارات الإنتاج ومتطلبات المواد وتكوينات المعدات ومدخلات المشروع.

How is filling selected for a 12 m pipe? +
Calculate annular volume and shot mass, then validate material distribution, venting, reaction timing and filling through representative pipe trials.
Does EN 253 cover every insulated pipe application? +
EN 253 addresses a defined factory-made bonded hot-water pipe construction. District cooling and industrial process piping require standards and acceptance criteria selected for their own operating conditions.
Can the line process pipes up to DN1200? +
DN50–DN1200 is the supplied reference range. Carrier and jacket diameters, pipe length, annular volume, shot duration and handling loads determine the ordered configuration.
How is the commissioning schedule agreed? +
The supplied project reference is 16–20 days on site. Site readiness, equipment interfaces, trial scope and acceptance milestones determine the agreed schedule.
ما المدخلات اللازمة لهذا التكوين؟ +
Inner/outer pipe sizes, length, jacket, insulation thickness, formulation, vents, handling and thermal-movement requirements. Identify retained equipment and the required acceptance documents.
What determines the filling arrangement for a long pipe? +
Review annular volume, material reaction window, inclination, seals, vents and the allowed cavity conditions. Verify delivery and air release on the intended pipe; total length alone does not select the pump.

ناقش معدات العزل والتطبيق لديك

Share the following for this application: Inner/outer pipe sizes, length, jacket, insulation thickness, formulation, vents, handling and thermal-movement requirements. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

اتصل بنا

لمعرفة كيفية تعاملنا مع معلومات استفسارك، اقرأ سياسة الخصوصية.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube