
حل التغليف بالبولي يوريثان لخلايا بطاريات المركبات الكهربائية
Configure PU dispensing for battery-cell or module potting with defined void inspection and process traceability.
Precision High-Pressure PU Potting for EV Cell Safety
Battery potting coordinates material preparation, mixing, dispensing and cure around the actual cell or module geometry. Thermal, electrical and mechanical properties depend on the cured material and assembly. Equipment records can support traceability, but do not by themselves establish complete pack qualification.
نطاق توريد محدد
Specify preparation, dispensing, optional vacuum/handling and the recorded data fields. Define inspection coverage and exception handling rather than assuming a bubble-free fill or complete production history.

المدخلات لاختيار العملية
Assembly drawing, potting material/filler data, fill mass, allowed voids, temperature limits, electrical tests and required MES fields.


Equipment scope, retained factory interfaces and acceptance are agreed for the selected material and part. Specify preparation, dispensing, optional vacuum/handling and the recorded data fields. Define inspection coverage and exception handling rather than assuming a bubble-free fill or complete production history.
EV Battery Cell PU Potting Workflow
Define the assembly and fill → Prepare and meter the material → Dispense and cure → Inspect and record. Define preparation, filling, cure and output timing separately for the selected configuration.
Define the assembly and fill
Review cavities, sensitive parts, fill mass and allowed thermal/pressure conditions.
Prepare and meter the material
Confirm filler behavior, conditioning, ratio and mixing with the material supplier.
Dispense and cure
Validate the filling path, air release and material-specific cure.
المواصفات الهندسية والمعلمات الفنية
مراجع التكوين الحالي والاختبار. تُعد إعدادات المعدات ونتائج المواد ونتائج التجميع النهائي منفصلة؛ ويُطبَّق كل قيمة فقط على التكوين والظروف الموثقة الخاصة بها.
| المعلمة الفنية | المواصفة القياسية / القيمة | السياق الهندسي & التحقق |
|---|---|---|
| التطبيق المستهدف | Cylindrical (21700/4680) & Prismatic Cell Modules | EV battery pack thermal isolation & potting |
| تركيبة المادة | Dual-Component Flame-Retardant PU Microcellular Foam | Flame rating requires the selected formulation test report |
| قدرة إخراج قياس الجرعات | 5 – 30 kg/min (Customizable) | مضخات مكبسية محورية بمحرك سيرفو مع قفل النسبة |
| Dispensing Weight Repeatability | ±1.0% | Reference target; confirm the calibration procedure and records |
| Chemical Viscosity Tolerance | Up to 15,000 mPa·s | Dynamic high-pressure circulation |
| Thermal Containment Rating | Project-specific pack test required | Battery-system safety validation; not an equipment certificate |
| Dielectric Insulation Resistance | ≥100 Ω/V (DC Circuit) | Confirm electrical insulation by the agreed assembly test |
| Dispensing Head Shut-Off | 0.3 seconds | Anti-drip hydraulic clean needle cut-off |
| نطاق التوريد | Turnkey (Potting Skid, Gantry, TCU + Optional MES/Fixtures) | Complete workcell delivery or cleanroom integration |
ضوابط العملية وفحوص التطبيق
قيّم هذه الوظائف باستخدام المادة والتجهيزات القالبية الموجزة الإنتاجية المختارة. تتطلب نتائج الأجزاء النهائية أدلة قبول خاصة بها.
Assembly-specific fill planning
Match the delivery path to cavity geometry and allowable exposure.
Defined inspection coverage
Agree void detection, sampling, limits and repair handling for the actual assembly.
Scoped traceability
Identify the stored fields, identity links, retention and handling of missing data.
مشاريع ذات صلة
هذه مراجع تطبيقية ذات صلة. قارن المادة الفعلية والعملية والوحدات المسلّمة؛ فأرقام المشاريع المبلَّغ عنها ليست نتائج قبول لخط آخر.
الأسئلة الشائعة
أسئلة هندسية وشرائية حول مسار إنتاج البولي يوريثان هذا.
How does this potting line help fulfill the GB 38031-2025 safety regulation?
How should electrical and void criteria be specified?
ما المعلومات المطلوبة لإعداد تكوين أولي؟
Discuss Your EV Battery Potting Project with Haifeng
Share the following with your production brief: Assembly drawing, potting material/filler data, fill mass, allowed voids, temperature limits, electrical tests and required MES fields. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.
