
حل إنتاج صفائح SMC والقولبة بالضغط للسيارات
Plan heated compression molding of prepared SMC charges with defined tooling and handling interfaces.
حل إنتاج صفائح SMC والقولبة بالضغط للسيارات
For the route described here, a prepared sheet-molding-compound charge is placed in a heated matched mold, compressed, cured and removed. Charge placement, press movement and thermal conditions follow the selected SMC and part. Upstream sheet manufacture and liquid-resin impregnation are separate operations.
نطاق توريد محدد
Confirm whether the supply is a compression cell or also includes upstream material preparation. Do not treat an associated liquid-PU metering project as proof of the same prepared-sheet process without its process records.
المدخلات لاختيار العملية
SMC data, charge drawing, part CAD, mold envelope and mass, required force/thermal cycle, output and upstream supply boundary.
Equipment scope, retained factory interfaces and acceptance are agreed for the selected material and part. Confirm whether the supply is a compression cell or also includes upstream material preparation. Do not treat an associated liquid-PU metering project as proof of the same prepared-sheet process without its process records.
Automotive SMC Sheet and Compression Molding Workflow
Define the SMC charge → Load the heated tool → Compress and cure → Demold and inspect. Define preparation, filling, cure and output timing separately for the selected configuration.
Define the SMC charge
Confirm sheet material, charge pattern, storage and handling.
Load the heated tool
Position the charge and any inserts in the selected mold.
Compress and cure
Coordinate press motion and thermal control with the material instructions.
Material, process and acceptance data
مراجع التكوين الحالي والاختبار. تُعد إعدادات المعدات ونتائج المواد ونتائج التجميع النهائي منفصلة؛ ويُطبَّق كل قيمة فقط على التكوين والظروف الموثقة الخاصة بها.
| Material definition | SMC is a pre-compounded, fiber-reinforced resin sheet; its resin chemistry is selected for the application and is not inherently polyurethane. |
|---|---|
| Process | Cut sheet charges are placed in a matched heated mold and compression molded; charge coverage and placement affect material flow and part quality. |
| Equipment planning | Press force, platen size, tool heating, sheet loading, demolding and trim interfaces are selected from the part envelope, material and production target. |
| LFI distinction | LFI cuts glass-fiber roving in line, wets it with PU and deposits it into an open mold. It should not be labelled conventional SMC sheet molding. |
| Haifeng solution scope | Engineering scope: SMC sheet and charge-layout planning, heated matched-mold press integration, part take-out, trimming and inspection; equipment scope follows the confirmed project requirements. |
معدات Haifeng ذات الصلة
تُختار مراجع المعدات وفق عمليتها الموثّقة. القياس الرئيسي للجرعات والإمداد المساعد والمسارات البديلة ليست حزمة قياسية واحدة.
ضوابط العملية وفحوص التطبيق
قيّم هذه الوظائف باستخدام المادة والتجهيزات القالبية الموجزة الإنتاجية المختارة. تتطلب نتائج الأجزاء النهائية أدلة قبول خاصة بها.
Clear material entry point
Prepared SMC charge molding is distinguished from resin injection and chopped-fiber deposition.
Press and tool coordination
Select usable force, platen envelope and thermal controls for the part and tool.
Evidence matched to the route
Use project records only after confirming resin, reinforcement introduction and actual delivery scope.
Automotive process FAQs
Process, material selection and validation for Traditional Sheet Molding Compound (SMC) compression molding for automotive structural and exterior parts.
Does this page include SMC sheet manufacture?
Can RIM or LFI results be used as SMC performance evidence?
ما المعلومات المطلوبة لإعداد تكوين أولي؟
أرسل أهداف إنتاجك
Share the following with your production brief: SMC data, charge drawing, part CAD, mold envelope and mass, required force/thermal cycle, output and upstream supply boundary. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.