Recycled Rubber and PU Tire Filling Solution Banner background

Solución de relleno de neumáticos con caucho reciclado y PU

Haifeng integrates recycled rubber granule and PU tire filling with metered feeding, mixing, pressure control and curing for off-road tire casings.

2Componentes PU Liquid Metering
Engineering Tire-Cavity Filling

Recycled Rubber & PU Tire Filling Solution

Blend selected recycled rubber granules with a polyurethane filling system and pump the composite into an existing rubber tire casing. Coordinate liquid metering, independent granule feeding, blending and the discharge path as one filling process. Granule fraction, size distribution, cleanliness and moisture are specification inputs rather than fixed universal values.

Dedicated Cavity-Filling Route

Use the existing casing as the filling envelope. Do not apply high-pressure closed-mold tire-casting settings to this route.

Define the Assembly and Formulation

State tire and rim identity, load and speed conditions, formulation, ratio basis, material quantity and cure criteria in the technical specification.

Haifeng coordinates material delivery, the filling connection, controls and curing-workflow integration for the specified order. Delivery includes on-site commissioning, operator training, a 1-year machine warranty and long-term spare parts support. Treat liquid PU and recycled-granule supply as separate streams before blending and casing filling. Define the granule acceptance, storage, start/stop procedure and cleaning path so the composite remains compatible with the selected delivery system.

Filling Workflow

From Material Preparation to the Cured Tire Assembly

Four coordinated stages for the selected tire, formulation and equipment configuration.

01

Material and Tire Preparation

Select a compatible granule grade and PU system, and assess the existing tire casing, rim and filling connection. Establish the recipe and the records needed for the order.

INPUTS: RUBBER GRANULES + TWO-COMPONENT PU; SELECTED TIRE/RIM ASSEMBLY
02

Coordinated Feeding

Meter the two liquid components to the formulation requirement and control the granule feed independently. Specify a mixer and discharge path suitable for the selected particle grade.

REFERENCE EQUIPMENT: HF-LPM-1A1B-OTR-K; 60–300 KG/H LISTED OUTPUT RANGE
03

Composite Tire Filling

Blend the liquid components and granules before introducing the mixture into the existing tire cavity. Manage filling and air release with tire-specific pressure control.

EQUIPMENT WORKING-PRESSURE RANGE: 0–15 BAR; TIRE PRESSURE IS A SEPARATE SETPOINT
Configuración y parámetros del proceso

Equipment Reference and Application Inputs

Existing Haifeng equipment data are stated separately from tire-specific process settings.

ParámetroReference ValueScope
RutaRecycled rubber granules + two-component PUExisting pneumatic tire casing
Reference Haifeng ModelHF-LPM-1A1B-OTR-KDedicated filling-equipment reference
Caudal de salida60–300 kg/hEquipment configuration; operating point is application dependent
Capacidad del tanque de materia prima700 LEquipment configuration; operating point is application dependent
Capacidad de la tolva de partículas500 LEquipment configuration; operating point is application dependent
Potencia total instalada5,5 kWEquipment configuration; operating point is application dependent
Velocidad de rotación del cabezal de mezcla30–105 rpmEquipment configuration; operating point is application dependent
Precisión de dosificación≤0,3 %Equipment configuration; operating point is application dependent
Presión de trabajo0–15 barEquipment configuration; operating point is application dependent
Protección contra sobrepresiónParada automática y alarma audiovisual por sobrepresiónEquipment configuration; operating point is application dependent
Tire Filling PressureSet from tire/rim and application requirementsDistinct from mixing or equipment working pressure
Load CapacitySpecify per wheel and duty conditionsDo not derive a 12-ton rating from the filling machine
Cure ScheduleSelected PU material system data and release checkTime and temperature are formulation specific
Garantía1 añoHaifeng machine warranty
Granule Grade and FractionDefined for the selected formulation and particle-feed configurationNo universal recycled fraction or particle-size claim
Discharge flow, working-pressure range and installed power describe equipment. They do not specify a tire load rating, universal recipe or tire-cavity pressure.
Dosificación, mezcla y equipos de línea

Reference Haifeng Tire-Filling Equipment

The granule-filling reference includes a distinct particle path; liquid metering, hopper/feeding, blending and casing connection must be reviewed together.

Aspectos técnicos a considerar

Configuration Priorities

Define each control function around the tire and formulation.

Metering and Recipe Control

Specify the liquid components and ratio basis independently of any granule feed.

Separate Pressure Settings

Define the tire-cavity setpoint and the equipment operating limits separately.

Coordinated Filling Integration

Match the mixing, material path and filling connection to the liquid or particulate mixture.

Batch and Release Records

Record material batches, filled quantity, pressure and cure-release checks for each order.

Preguntas sobre planificación de la producción

Preguntas frecuentes sobre la planificación de la producción

Selección, alcance de suministro y validación para esta ruta de producción.

How does rubber-granule filling differ from pure PU filling? +
Granules require defined sorting, preparation and feed interfaces in addition to the selected PU system. See the pure PU tire-filling route for liquid-only filling.
What granule data is needed? +
Provide particle-size distribution, loading, moisture, contamination limits and recycled-material variability together with PU formulation data.
How are blockage and settling reviewed? +
Select preparation, agitation and conveying or dispensing paths for the tested mixture. Define cleaning and inspection procedures for the installed configuration.
What determines filled-tire acceptance? +
Casing condition, geometry, fill distribution, cure, duty load and speed are assessed under the agreed filling and service test plan.
¿Qué datos se necesitan para esta configuración? +
Casing/rim data, granule source and grading, moisture/cleanliness, PU system, granule fraction and stop/start needs. Identify retained equipment and the required acceptance documents.
How should granule quality and interruption handling be specified? +
Agree particle-size distribution, contamination and moisture acceptance, then trial feeding, blending, discharge and restart. Liquid calibration does not establish granule fraction or prevent settling and blockage.

Plan Your Engineering Tire-Filling System

Share the following for this application: Casing/rim data, granule source and grading, moisture/cleanliness, PU system, granule fraction and stop/start needs. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Contáctenos

Para saber cómo tratamos la información de su consulta, lea nuestra Política de privacidad.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube