Caso de mejora de línea de espumado de asientos de automóvil de doble densidad | Hubei, China

Un proyecto de asientos de automoción en Hubei que combina espumado de PU de tres componentes y doble densidad, vertido robótico y una mesa giratoria para sustituir líneas de producción independientes.

Dual-Density Car Seat Foaming Line Upgrade in Hubei

Project Background Located in an auto parts industrial park in Hubei Province, the customer is a manufacturer specializing in automotive seat foamed parts, producing about 450,000 cushion, backrest and headrest parts per year with revenue of about RMB 120 million in 2025. Challenges Soft-density and high-resilience parts ran on two separate lines, with density fluctuation of ±10%, a defect rate of 5%–8% and changeover time over 1 hour. Haifeng Solution The customer adopted the Haifeng turnkey dual-density car seat PU foaming line, integrating a 3-component dual-density high-pressure foaming machine, a pouring robot and a turntable line. Results Per-line capacity rose about 57%, density fluctuation fell to ≤±3%, defect rate to ≤2%, manpower dropped from 16 to 8, with annual savings of about RMB 1.4 million and a payback period of about 3.5 years.

Turnkey Line Configuration

The customer selected the Haifeng dual-density car seat PU foaming line turnkey solution, consisting of a 3-component dual-density high-pressure foaming machine, a pouring robot and a turntable line.

EquiposModeloCant.Función
3-Component Dual-Density High-Pressure Foaming MachineHF-HPM-2A1B-DualDensityCarSeat1 unidadThree material circuits (2 POLY + 1 ISO); mixing-head inlet and chamber configuration follows the approved equipment specification. Closed-loop metering with flow meters + VFDs.
Robot de vertido1 unidadVertido automático siguiendo trayectorias definidas, distribución uniforme y posicionamiento preciso
Turntable Line1 unidadMulti-station turntable, cyclic mold carrier operation: pouring–foaming–mold opening–part removal
Sistema de control eléctrico1 unidadControl inteligente por PLC con ajuste de parámetros, supervisión de estado y alarma de fallos

Upgrade Results

+57%
Per-Line Capacity
Per-line capacity up from about 700 to 1,100 pcs/day
≤2%
Finished-Product Defect Rate
Project-reported defect rate reduced from 5%–8% to ≤2%. Figures apply to the stated project conditions; no single relative reduction is inferred from the baseline range.
-50%
Manpower
Operators cut from 16 to 8
Dual-Density Car Seat Foaming Line Upgrade Case Hubei, China

Looking for a Similar Solution?

Explore our turnkey dual-density car seat foaming line to upgrade your seat production.

Solución de línea de espumado de asientos de coche de doble densidad | Asientos de automoción

Planifique su proyecto de producción de poliuretano

Nuestro equipo de ingeniería está listo para diseñar una solución personalizada de maquinaria de PU que se ajuste a sus objetivos de producción, estándares de calidad y plan de inversión. Nuestro equipo responderá en un plazo de un día hábil. Una vez claros los requisitos, presentamos una propuesta preliminar en un plazo de dos días hábiles.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube