Heavy-Duty Solid Wheel Casting Solution Banner background

حل صب العجلات الصلبة للخدمة الشاقة

إنتاج مُهيَّأ لعجلات البولي يوريثان الصلبة، يشمل واجهات تجهيز القلب والتسخين المسبق بالحث والتوزيع ثنائي التدفق والمعالجة في قوالب مُفهرسة.

تخطيط خط الإنتاج

Extreme Interfacial Bonding for Heavy-Load Material Handling Wheels

Configured polyurethane solid-wheel production with core preparation interfaces, induction preheating, dual-flow dispensing and indexed mold curing. The package covers material preparation, dual-flow dynamic mixing, induction hub preheating, the specified heated mold line and controls. Automatic blasting/cleaning and hydraulic demolding are optional. Prepolymer and bonding agents are supplied separately; site power and compressed air are customer interfaces. Capacity depends on parallel mold positions, cycle stages and product size.

Hub Induction Preheating

The specified induction stage conditions the metal hub; adhesive selection and actual bonding performance require validation.

Dual-Flow Dispensing

Programmed leading and main-fill rates are selected for hub clearance and tread cavity geometry.

Balance hub preparation, induction preheat, dosing, indexing and mold cure as separate stages. Parallel tooling can change the output interval, but it does not shorten the material cure automatically. Verify bonding and wheel endurance on the intended assembly.

سير عمل التصنيع

Turnkey Automated Wheel Casting Workflow

A synchronized, automated manufacturing sequence from raw metal hub preparation to finished solid polyurethane wheels.

01

Hub Surface Blasting & Bonding Primer Coating

Forged steel or cast iron wheel cores are automatically grit-blasted to Sa 2.5 cleanliness and spray-coated with Chemlok adhesive in an automated booth.

SURFACE CLEANLINESS SA 2.5; PRIMER THICKNESS 15–25 µM
02

Medium-Frequency Rapid Induction Heating

The primed cores pass through an automated induction coil, heating the metal to 90°C ± 2°C in 45 seconds to activate adhesive bonding groups.

INDUCTION CYCLE 45 S; HUB TEMP 90°C ± 2°C
03

High-Accuracy Closed-Loop Servo Metering

Servo gear pumps meter MDI prepolymer and 1,4-BDO crosslinker through heated lines under Coriolis feedback, holding mix ratio accuracy within ±0.2%.

RATIO TOLERANCE WITHIN ±0.2%; TEMP 85–100°C
الإعداد & معايير العملية

النطاق الهندسي للحل المرجعي

مراجع التكوين المورَّدة. تعتمد القيم على التركيبة والتجهيزات القالبية وظروف التشغيل المذكورة؛ وتتطلب مؤهلات المكوّنات ونتائج المشروع المُبلَّغ عنها سجلات منفصلة.

المعاملالقيمة / الوحدةالتكوين / الظروف المطبَّقة
Continuous Casting Output2.0 to 18.0 kg/minDual-flow matrix servo gear pump skid
Induction Preheating Rate45 seconds per hubMedium-frequency automated induction heating unit
Target Metal Hub Temperature90°C ± 2°CInfrared pyrometer closed-loop temperature control
Interfacial Bonding StrengthGreater than 30 kN/mASTM D429 Method B 90° peel adhesion test; applies to the selected specimen and method
Dispensing / Indexing ReferenceLess than 90 secondsDistinct from 15-minute mold cure; actual sequence to be verified
Daily Shift Wheel CapacityUp to 800 finished wheelsPlanning reference for the agreed parallel positions, cavity count, line balance and shift schedule
Day tank volumes, induction coil inner diameters, and indexing conveyor lengths are custom-engineered according to client wheel diameter spectrum and shift production targets. Values are configuration references and require confirmation under the stated material and operating conditions.
معدات قياس الجرعات والخلط والخطوط

المعدات الأساسية لهذا الحل

The linked automatic wheel line has selected hub-heating, dispensing and heated-mold interfaces; preparation and removal automation must be itemized.

اعتبارات هندسية

Core Advantages of Haifeng Wheel Systems

ضوابط عملية وواجهات هندسية مُهيّأة لحزمة المعدات المختارة.

Hub Induction Preheating

The specified induction stage conditions the metal hub; adhesive selection and actual bonding performance require validation.

Dual-Flow Dispensing

Programmed leading and main-fill rates are selected for hub clearance and tread cavity geometry.

Material and Endurance Testing

Rolling heat and bond durability are verified for wheel size, compound, load and speed rather than inferred from the dispenser.

Indexed Production Interfaces

Mold indexing and curing can operate in parallel. Total output requires a complete line balance and operating record.

التطبيقات والمشاريع ذات الصلة

مشاريع ذات صلة

The AGV wheel case does not by itself establish all forklift loads, rolling heat or endurance; match wheel design and service conditions.

مراجعة المشروع
أسئلة تخطيط الإنتاج

الأسئلة الشائعة

Find answers about Heavy-Duty Solid Wheel Casting Solution, including material selection, equipment configuration and the information needed to plan a production line.

How are hub preheating and bonding targets validated? +
Hub preheating is selected against the adhesive and substrate. The supplied 90°C/45-second reference does not by itself guarantee >30 kN/m bond strength; verify the complete bonded system and original peel-test conditions.
How does dispensing time differ from in-mold curing time? +
Leading and main-fill flow profiles are developed for wheel clearance and cavity volume. The stated 90-second dispensing/indexing reference is distinct from the supplied 15-minute in-mold cure.
How are wheel rolling temperature and durability verified? +
Rolling heat depends on wheel geometry, compound, loading, speed and environment. The supplied ≤45°C result is a project test claim, not a temperature guarantee for every MDI/PTMG wheel.
How is the complete wheel-line shift output established? +
The reference output of up to 800 wheels per eight-hour shift depends on a coordinated parallel or multi-cavity layout. Actual output follows the station cycle, curing residence, working hours and equipment availability.
ما المدخلات اللازمة لهذا التكوين؟ +
Wheel/hub CAD, covering thickness, material/primer, preheat, shot, molds, load/speed and shift requirements. Identify retained equipment and the required acceptance documents.
How should a complete wheel-line shift output be calculated? +
Include hub preparation, preheat, actual filling, mold residence, demolding, interruptions and accepted yield. State optional automatic blasting or demolding separately from the listed core package.

Request a Solid Wheel Casting Equipment Proposal

Share the following for this application: Wheel/hub CAD, covering thickness, material/primer, preheat, shot, molds, load/speed and shift requirements. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

اتصل بنا

لمعرفة كيفية تعاملنا مع معلومات استفسارك، اقرأ سياسة الخصوصية.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube