HJT Module Frame Structural Grouting Solution Banner background
Производственные решения

Решение для конструктивного заполнения рам модулей HJT

Координация позиционирования рамки солнечного модуля по четырём кромкам, дозирования двухкомпонентного клея, сборки углов и отдельно контролируемого этапа обработки с отверждением без нагрева.

Цель производства

Buffer-Free Fast Structural Framing for Large-Format Dual-Glass Modules

Coordinate four-edge solar module frame positioning, two-component adhesive dispensing, corner assembly and a separately verified green-cure handling stage. The described scope includes frame positioning and pressing, proportioning, multi-head dispensing and conveyor interfaces. Adhesive, extrusions, glass, handling fixtures and cure residence are confirmed for the module. This assembles existing frames; it is distinct from manufacturing composite profiles.

Изделие, материал и оснастка

The described scope includes frame positioning and pressing, proportioning, multi-head dispensing and conveyor interfaces. Adhesive, extrusions, glass, handling fixtures and cure residence are confirmed for the module. This assembles existing frames; it is distinct from manufacturing composite profiles.

Производительность и приёмка

Рассмотрите все этапы подготовки, дозирования, отверждения, обращения и контроля. Для результатов по материалам и компонентам требуются отдельно согласованные условия испытаний.

Map frame positioning, clamping, multi-head dispensing and the green-strength buffer as separate stages. Structural adhesive, glass/frame preparation and final cure require their own validation; an early handling strength is not final bond qualification.

Производственный процесс

Turnkey Automated Dual-Glass Framing Workflow

Приведённая последовательность процесса служит справочной конфигурацией. Параметры температуры, давления, производительности и отверждения подтверждаются для выбранного материала и оснастки.

01

Dual-Glass Infeed & Automatic Centering

Configured reference: Laminated G12 dual-glass panels transfer via motor rollers into the machine bed, centered within ±0.5 mm by pneumatic aligning pushers.

PANEL FORMAT 2384 X 1303 MM; ALIGNMENT TOLERANCE ±0.5 MM
02

4-Corner Synchronous Hydraulic Pressing

Configured reference: Four servo-hydraulic cylinders drive corner keys into frame extrusions under 50 kN force, squaring the frame around glass edges.

CLAMPING FORCE UP TO 50 KN; SQUARING TOLERANCE ±0.5 MM
03

Closed-Loop Two-Component High-Pressure Metering

Configured reference: Servo gear pumps displace structural polyol and modified isocyanate at 9.0 MPa under Coriolis mass flow measurement within ±0.2% accuracy.

DOSING PRESSURE 8.0–10.0 MPA; RATIO TOLERANCE ±0.2%
Исходные данные для проектирования

Технические характеристики эталонного решения

Значения перенесены из предоставленного технического задания на конфигурацию. Свойства материалов и показатели готовой продукции являются отдельными целями валидации, а не общими гарантиями оборудования.

ПараметрЗначение / единица измеренияПрименимая конфигурация / условия
Single-Module Framing Tact TimeLess than or equal to 25 secondsSynchronous 4-corner pressing and 4-head cavity grouting; supplied reference requiring configuration or test verification
Handling Green Cure DurationLess than or equal to 180 secondsRoom-temperature chemical crosslinking (25°C ambient); supplied reference requiring configuration or test verification
Combined Chemical Injection Rate15.0 to 60.0 g/sFour independent servo-controlled dynamic mixing channels; supplied reference requiring configuration or test verification
Cured Matrix Lap Shear StrengthGreater than 12.0 MPaMaterial/joint target; appropriate substrate-specific test needed. ASTM D1002 metal-to-metal specimens do not directly establish aluminum-to-glass bond performance.
Module Mechanical Wind/Snow LoadUp to 8,500 Pa static loadreported under IEC 61215-2 mechanical load sequence; supplied reference requiring configuration or test verification
Factory Floor Space SavingsUp to 1,500 m² savedElimination of multi-tier 4-hour silicone curing buffers; supplied reference requiring configuration or test verification
Framing cycle, green-cure residence and handling are coordinated in the line layout. Ratio settings include their mass or volume basis. Joint performance and production output follow the agreed substrate, test conditions and working schedule.
Конфигурация процесса

Core Advantages of Haifeng HJT Framing Systems

Инженерные функции и интерфейсы, разработанные для указанного изделия и системы материалов.

Frame positioning

Verify squareness, datum and corner assembly for the actual module.

Adhesive supply

Prepare and meter the chosen material with defined substrate conditions.

Head balance

Check each path and combined output through starts, stops and purge.

Supported green cure

Provide the agreed residence and handling limit before final cure.

Вопросы планирования

Часто задаваемые вопросы

Технические вопросы для определения состава оборудования, диапазона материалов и плана валидации.

How does green strength differ from final adhesive cure? +
A selected two-component system can develop handling strength through chemical reaction. A 180-second green-cure reference is not full cure and depends on temperature, bond geometry and material.
Can different frame substrates be considered? +
Fixture design can be assessed for aluminum or composite extrusions. Surface preparation, corner geometry and adhesion require validation for each substrate.
How is delivery balanced across four heads? +
Head calibration and the distribution circuit determine shot balance. The 110 g total reference implies 27.5 g per head only if equal distribution is validated.
How are interruption and purge limits configured? +
Pause limits and purge cycles depend on gel time, mixed volume and head design. An automatic purge reference is not a universal guarantee against plugging.
Какие исходные данные нужны для этой конфигурации? +
Module/frame sections, corner/joint gap, adhesive, combined/per-head shot, clamping, handling load, buffer and final bond tests. Identify retained equipment and the required acceptance documents.
How should the framing takt and green-cure buffer be coordinated? +
Track modules leaving the framing station through the required supported residence before handling. Specify allowable load at that stage, interruptions and final cure separately, with head delivery measured on the same combined or individual basis.

Request an HJT Module Structural Framing Proposal

Share the following for this application: Module/frame sections, corner/joint gap, adhesive, combined/per-head shot, clamping, handling load, buffer and final bond tests. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Связаться с нами

О том, как мы обрабатываем информацию из вашего запроса, читайте в Политика конфиденциальности.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube