Offshore Marine Solar Frame Solution Banner background
Soluciones de fabricación

Solución para marcos solares marinos en alta mar

Develop closed-box PU injection pultrusion for marine PV frame profiles with defined material and module tests.

Objetivo de producción

Heavy Structural Composite Framing for Offshore Floating Solar

Marine framing requires a specified profile, reinforcement, resin, connections and exposure assessment. Sealed resin conditioning and controlled injection support processing but do not independently establish corrosion life or electrical suitability. Metering pumps deliver the liquid resin components; they do not convey the continuous reinforcement.

Alcance de suministro definido

Agree the conditioning, mixing and injection-box scope with the die, puller, dry-gas and cutting interfaces. Alternative glass, basalt or carbon reinforcement requires its own process and component review.

Insumos para la selección del proceso

Profile and connection drawings, fiber form/content basis, resin data, marine exposure, electrical requirements and line interfaces.

Equipment scope, retained factory interfaces and acceptance are agreed for the selected material and part. Agree the conditioning, mixing and injection-box scope with the die, puller, dry-gas and cutting interfaces. Alternative glass, basalt or carbon reinforcement requires its own process and component review.

Ruta de producción

Offshore Marine Solar Frame Workflow

Define profile and exposure → Prepare sealed resin supply → Inject and pultrude → Qualify profile and module. Define preparation, filling, cure and output timing separately for the selected configuration.

01

Define profile and exposure

Review frame section, connections, reinforcement and marine duty.

02

Prepare sealed resin supply

Establish conditioning, dry-gas and container-change procedures.

03

Inject and pultrude

Validate wet-out, die control and pulling for the selected fiber content.

Datos de ingeniería

Envolvente de ingeniería de la solución de referencia

Configuración existente y referencias de ensayo. Los ajustes del equipo, los resultados del material y los resultados del conjunto terminado son independientes; aplique cada valor solo a su configuración y condiciones documentadas.

ParámetroValor / UnidadConfiguración / Condiciones aplicables
Dosing Output Capacity1.0 to 10.0 kg/minHastelloy-coated servo-driven axial piston metering skid; supplied reference requiring configuration or test verification
Presión de trabajo del fluido12.0 to 15.0 MPaContinuous high-pressure closed-die impingement injection; supplied reference requiring configuration or test verification
Supported Fiber VolumeUp to 83% (Vf)E-CR glass, basalt, or carbon fiber dense structural packing; supplied reference requiring configuration or test verification
Salt Spray Durability LimitGreater than 9,000 hoursASTM B117 testing with flexural retention > 92%; supplied reference requiring configuration or test verification
Profile Wall ThicknessUp to 4.5 mm (Heavy section)Engineered for 4-meter wave slap and typhoon wind loads; supplied reference requiring configuration or test verification
Continuous Pulling Speed0.8 to 1.2 m/minSynchronized heavy hydraulic caterpillar puller; supplied reference requiring configuration or test verification
Existing application note: Offshore durability and strength or modulus retention apply to the selected laminate, exposure duration and test method. Fiber content includes its measurement basis. Original process references, with their existing values: Nitrogen pressure 0.05 MPa; Chemical moisture < 30 ppm; Metering pressure 12.0–15.0 MPa; Ratio tolerance ±0.2%; Impingement velocity > 100 m/s; In-line gel tracking; Cavity backpressure 1.8 MPa; Fiber volume > 82%; Die temp 160–195°C; Line speed 0.8–1.2 m/min. The existing process example uses 14.5 MPa metering. Confirm its actual pump, resin and measurement circuit; the value does not itself establish fiber wet-out or marine qualification. Confirm the configuration, material, test method and cycle endpoints before using reference values as acceptance commitments.
Shared equipment references

Equipos principales de esta solución

Las referencias de equipos se seleccionan según su proceso documentado. La dosificación principal, el suministro auxiliar y las rutas alternativas no constituyen un único paquete estándar.

Configuración del proceso

Controles de proceso y verificaciones de aplicación

Evalúe estas funciones con el material, los moldes y el resumen de producción seleccionados. Los resultados de las piezas acabadas requieren su propia evidencia de aceptación.

Defined reinforcement handling

Keep fiber guidance separate from the resin pump and mixing circuits.

Wet-out evidence

Verify the actual reinforcement fraction and impregnation rather than inferring quality from pressure.

Marine-system validation

Assess resin, fiber, connections and module performance under the intended exposure.

Resumen del proyecto relacionado

Proyectos relacionados

Estas son referencias de aplicación relacionadas. Compare el material, el proceso y los módulos entregados reales; las cifras de proyecto reportadas no son resultados de aceptación para otra línea.

Revisar proyecto
Preguntas de planificación

Preguntas frecuentes

Preguntas técnicas para definir el alcance del equipo, la ventana de materiales y el plan de validación.

Does a salt-spray duration establish offshore service life? +
No. Use the original specimen, coating/connection construction and test method, then assess the intended environment and failure criteria.
Can every listed fiber use the same settings? +
No. Fiber form, sizing, content and resin compatibility affect wet-out and die behavior. Validate the selected combination.
¿Qué información se necesita para una configuración preliminar? +
Profile and connection drawings, fiber form/content basis, resin data, marine exposure, electrical requirements and line interfaces. Identify the equipment and interfaces to retain, plus the required test and acceptance documents.

Request an Offshore Marine Solar Frame Proposal

Share the following with your production brief: Profile and connection drawings, fiber form/content basis, resin data, marine exposure, electrical requirements and line interfaces. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Contáctenos

Para saber cómo tratamos la información de su consulta, lea nuestra Política de privacidad.

Revisión de la configuración basada en la aplicación y los datos del material Documentación acordada de equipo, interfaces y aceptación Formación y soporte definidos para el paquete suministrado
Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube