Solución de amortiguación para canal de vía embebido
Planificar el llenado continuo de canales ferroviarios con poliuretano bicomponente, con dosificación sincronizada con el avance, múltiples cabezales de dispensación, preparación de la superficie y curado controlado.
Continuous Elastic Support for Quiet, Low-Maintenance Transit Lines
Plan continuous two-component polyurethane rail-channel filling with travel-synchronized metering, multiple dispensing heads, surface preparation and controlled curing. The configured scope covers mobile material handling, conditioned two-component feed, multi-head metering and mixing, travel encoders and primer interfaces. Carrier geometry, access, ventilation, power, track gauge and structural clearances require a site-specific design; a suspended monorail is not assumed to accept a standard road-rail vehicle.
Producto, material y utillaje
The configured scope covers mobile material handling, conditioned two-component feed, multi-head metering and mixing, travel encoders and primer interfaces. Carrier geometry, access, ventilation, power, track gauge and structural clearances require a site-specific design; a suspended monorail is not assumed to accept a standard road-rail vehicle.
Capacidad y aceptación
Revise todas las etapas de preparación, dispensación, curado, manipulación e inspección. Los resultados de materiales y componentes requieren condiciones de ensayo acordadas por separado.
Use the channel section and carrier survey to define travel-linked volume, head balance and the finished fill level. Turns, stops, switches and clearances need explicit operating sequences; an application on suspended track is not automatically evidence for an embedded-rail carrier.
Turnkey Embedded Rail Channel Grouting Process
La secuencia de proceso suministrada es una referencia de configuración. La temperatura, la presión, la producción y los ajustes de curado se confirman para el material y el utillaje seleccionados.
Trough Debris Evacuation & Primer Application
Configured reference: High-velocity air blowers evacuate debris from concrete troughs, followed by automated spray application of moisture-barrier polyurethane primer.
Road-Rail Vehicle Alignment & Track Coupling
Select the carrier, guide wheels, access and power arrangement for the actual track architecture. Standard-gauge road-rail access is not assumed for a suspended monorail.
Optical Speed Slaving & Four-Stream Metering
Configured reference: Optical ground encoders measure vehicle crawling velocity (1–5 m/min), dynamically commanding four servo gear pumps to maintain constant flow.
Envolvente de ingeniería de la solución de referencia
Valores transcritos del informe de configuración suministrado. Las propiedades de los materiales y los parámetros de referencia del producto terminado son objetivos de validación independientes, no garantías generales del equipo.
| Parámetro | Valor / Unidad | Configuración / Condiciones aplicables |
|---|---|---|
| Combined Dispensing Flow Rate | 10.0 to 50.0 kg/min | Four-channel servo-driven rotary gear pumps; supplied reference requiring configuration or test verification |
| Vehicle Creep Working Speed | 1.0 to 5.0 m/min | Hydraulic stepless crawl drive with encoder slaving; supplied reference requiring configuration or test verification |
| Finished Surface Height Variance | Within ±1.0 mm | Continuous speed-slaved automatic level regulation; supplied reference requiring configuration or test verification |
| Steel-to-Elastomer Bond Strength | Greater than 3.0 MPa | ASTM D4541 pull-off testing on primed steel rails; supplied reference requiring configuration or test verification |
| Roadside Vibration Attenuation | Up to 12 dB drop | Measured against standard rigid fastener trackbeds; supplied reference requiring configuration or test verification |
| Daily Construction Progress | 1.5 to 2.0 km/day | Double-track continuous four-channel dispensing; supplied reference requiring configuration or test verification |
Core Advantages of Haifeng Embedded Rail Systems
Funciones de ingeniería e interfaces desarrolladas para el producto y el sistema de materiales especificados.
Travel-linked delivery
Relate material demand to the surveyed channel section and calibrated travel.
Equilibrio de cabezales
Check combined delivery and each head path through starts and turns.
Surface and primer
Inspect preparation and bonding for the actual rail/channel substrates.
Carrier access
Confirm clearance, switches, utilities and safe access for the real track architecture.
Related track-grouting reference
The linked suspended-track grouting record is related process experience, not proof that its carrier or geometry matches an embedded channel.
Preguntas frecuentes
Preguntas técnicas para definir el alcance del equipo, la ventana de materiales y el plan de validación.
How is dispensing synchronized to travel speed?
How are bond durability and electrical properties verified?
When can a treated track be reopened?
How is the carrier configured for different track architectures?
¿Qué datos se necesitan para esta configuración?
How should travel interruptions and changing channel sections be handled?
Request an Embedded Rail Channel Grouting Proposal
Share the following for this application: Channel/rail drawing, cross-section changes, primer/material, head paths, turns/stops, carrier clearance, power and possession window. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.