Solución de amortiguación para canal de vía embebido

Planificar el llenado continuo de canales ferroviarios con poliuretano bicomponente, con dosificación sincronizada con el avance, múltiples cabezales de dispensación, preparación de la superficie y curado controlado.

Objetivo de producción

Continuous Elastic Support for Quiet, Low-Maintenance Transit Lines

Plan continuous two-component polyurethane rail-channel filling with travel-synchronized metering, multiple dispensing heads, surface preparation and controlled curing. The configured scope covers mobile material handling, conditioned two-component feed, multi-head metering and mixing, travel encoders and primer interfaces. Carrier geometry, access, ventilation, power, track gauge and structural clearances require a site-specific design; a suspended monorail is not assumed to accept a standard road-rail vehicle.

Producto, material y utillaje

The configured scope covers mobile material handling, conditioned two-component feed, multi-head metering and mixing, travel encoders and primer interfaces. Carrier geometry, access, ventilation, power, track gauge and structural clearances require a site-specific design; a suspended monorail is not assumed to accept a standard road-rail vehicle.

Capacidad y aceptación

Revise todas las etapas de preparación, dispensación, curado, manipulación e inspección. Los resultados de materiales y componentes requieren condiciones de ensayo acordadas por separado.

Use the channel section and carrier survey to define travel-linked volume, head balance and the finished fill level. Turns, stops, switches and clearances need explicit operating sequences; an application on suspended track is not automatically evidence for an embedded-rail carrier.

Flujo de fabricación

Turnkey Embedded Rail Channel Grouting Process

La secuencia de proceso suministrada es una referencia de configuración. La temperatura, la presión, la producción y los ajustes de curado se confirman para el material y el utillaje seleccionados.

01

Trough Debris Evacuation & Primer Application

Configured reference: High-velocity air blowers evacuate debris from concrete troughs, followed by automated spray application of moisture-barrier polyurethane primer.

SURFACE MOISTURE < 8%; PRIMER DRY FILM 50–80 µM
02

Road-Rail Vehicle Alignment & Track Coupling

Select the carrier, guide wheels, access and power arrangement for the actual track architecture. Standard-gauge road-rail access is not assumed for a suspended monorail.

CARRIER GEOMETRY, CLEARANCE AND POWER CONFIRMED AFTER SITE SURVEY
03

Optical Speed Slaving & Four-Stream Metering

Configured reference: Optical ground encoders measure vehicle crawling velocity (1–5 m/min), dynamically commanding four servo gear pumps to maintain constant flow.

VEHICLE CREEP 1.0–5.0 M/MIN; METERING PRECISION ±0.5%
Datos de ingeniería

Envolvente de ingeniería de la solución de referencia

Valores transcritos del informe de configuración suministrado. Las propiedades de los materiales y los parámetros de referencia del producto terminado son objetivos de validación independientes, no garantías generales del equipo.

ParámetroValor / UnidadConfiguración / Condiciones aplicables
Combined Dispensing Flow Rate10.0 to 50.0 kg/minFour-channel servo-driven rotary gear pumps; supplied reference requiring configuration or test verification
Vehicle Creep Working Speed1.0 to 5.0 m/minHydraulic stepless crawl drive with encoder slaving; supplied reference requiring configuration or test verification
Finished Surface Height VarianceWithin ±1.0 mmContinuous speed-slaved automatic level regulation; supplied reference requiring configuration or test verification
Steel-to-Elastomer Bond StrengthGreater than 3.0 MPaASTM D4541 pull-off testing on primed steel rails; supplied reference requiring configuration or test verification
Roadside Vibration AttenuationUp to 12 dB dropMeasured against standard rigid fastener trackbeds; supplied reference requiring configuration or test verification
Daily Construction Progress1.5 to 2.0 km/dayDouble-track continuous four-channel dispensing; supplied reference requiring configuration or test verification
Embedded-channel installation and suspended-monorail applications require different access and carrier arrangements. Noise and vibration targets use the agreed measurement quantity and test method.
Configuración del proceso

Core Advantages of Haifeng Embedded Rail Systems

Funciones de ingeniería e interfaces desarrolladas para el producto y el sistema de materiales especificados.

Travel-linked delivery

Relate material demand to the surveyed channel section and calibrated travel.

Equilibrio de cabezales

Check combined delivery and each head path through starts and turns.

Surface and primer

Inspect preparation and bonding for the actual rail/channel substrates.

Carrier access

Confirm clearance, switches, utilities and safe access for the real track architecture.

Resumen del proyecto relacionado

Related track-grouting reference

The linked suspended-track grouting record is related process experience, not proof that its carrier or geometry matches an embedded channel.

Revisar proyecto
Preguntas de planificación

Preguntas frecuentes

Preguntas técnicas para definir el alcance del equipo, la ventana de materiales y el plan de validación.

How is dispensing synchronized to travel speed? +
Travel encoders can command output per unit length. Channel area, density, head calibration and level feedback are established for the actual installation.
How are bond durability and electrical properties verified? +
Adhesion, water exposure, salt and electrical insulation are evaluated for the specified substrate, primer and formulation. General polyurethane chemistry does not guarantee these results.
When can a treated track be reopened? +
Reopening is authorized against material cure, bond development, loading and railway operating requirements. The supplied four-hour reference is not a universal permission to run trains.
How is the carrier configured for different track architectures? +
Channel geometry, switches, access and carrier clearance are surveyed before selecting boom paths and dispensing sequences.
¿Qué datos se necesitan para esta configuración? +
Channel/rail drawing, cross-section changes, primer/material, head paths, turns/stops, carrier clearance, power and possession window. Identify retained equipment and the required acceptance documents.
How should travel interruptions and changing channel sections be handled? +
Define deceleration, dispense cutoff, restart and material working-time limits with head calibration. Trial the actual channel transitions and agree level, bond and cure inspection before reopening.

Request an Embedded Rail Channel Grouting Proposal

Share the following for this application: Channel/rail drawing, cross-section changes, primer/material, head paths, turns/stops, carrier clearance, power and possession window. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.

Contáctenos

Para saber cómo tratamos la información de su consulta, lea nuestra Política de privacidad.

Haifeng Polyurethane Machinery on TikTok
Haifeng Polyurethane Machinery on Instagram
Haifeng Polyurethane Machinery on Facebook
Haifeng Polyurethane Machinery on X
Haifeng Polyurethane Machinery on LinkedIn
Contact Haifeng Polyurethane Machinery on WhatsApp
Haifeng Polyurethane Machinery on YouTube