
حل تغليف العضو الثابت الطويل للمغليف المغناطيسي
إعداد البولي يوريثان المعبأ، وقياس الجرعات بثلاثة مسارات، والتوزيع تحت التفريغ، والمعالجة الخاصة بكل مادة لمكونات stator الطويلة الكهربائية.
Dielectric Integrity & Thermal Dissipation for 600 km/h Maglev Propulsion
Configure filled-polyurethane preparation, three-stream metering, vacuum dispensing and material-specific curing for long-stator electrical components. Core interfaces cover filled-resin conditioning, wear-resistant metering and dynamic mixing, a configured vacuum chamber and process controls. Stator preheating and electrical testing are separate options. Powder, resin, dry gas, utilities and final insulation qualification are agreed separately.
المنتج والمواد والتجهيزات القالبية
Core interfaces cover filled-resin conditioning, wear-resistant metering and dynamic mixing, a configured vacuum chamber and process controls. Stator preheating and electrical testing are separate options. Powder, resin, dry gas, utilities and final insulation qualification are agreed separately.
السعة والقبول
راجع جميع مراحل التحضير والتوزيع والمعالجة والمناولة والفحص. وتتطلب نتائج المواد والمكونات ظروف اختبار متفقًا عليها بشكل منفصل.
Separate filler dispersion, conditioned holding, wear-resistant delivery, chamber potting and electrical testing. Specify where temperature, vacuum and material properties are measured; cured thermal/electrical results do not follow from the premixer alone.
Turnkey Maglev Stator Encapsulation Workflow
تسلسل العملية المقدم هو مرجع للإعداد. وتُؤكَّد إعدادات الحرارة والضغط والإنتاج وزمن المعالجة للمادة والتجهيزات القالبية المختارة.
Alumina Vacuum Dehydration & High-Shear Mixing
Configured reference: Micronized alumina powders are inducted into polyol streams under 0.05 kPa vacuum and dispersed via turbine blades to break all agglomerations.
Three-Component Heated Circulation & Nitrogen Blanketing
Configured reference: Filled polyol, isocyanate, and liquid catalyst are circulated through thermal oil jackets at 65°C ± 0.5°C under dry nitrogen blankets.
Core Preheating & Vacuum Chamber Evacuation
Configured reference: The 3-meter stator core is preheated to 75°C in an infrared tunnel, loaded into the vacuum potting chamber, and evacuated down to 0.05 kPa.
النطاق الهندسي للحل المرجعي
قيم منقولة من موجز التكوين المقدَّم. خصائص المواد ومعايير المنتج النهائي هي أهداف تحقق منفصلة، وليست ضمانات عامة للمعدات.
| المعامل | القيمة / الوحدة | التكوين / الظروف المطبَّقة |
|---|---|---|
| Potting Vacuum Level | Absolute pressure ≤ 0.05 kPa | Dual-stage rotary vane vacuum system with cold trap; supplied reference requiring configuration or test verification |
| Cured Thermal Conductivity | Greater than 1.1 W/(m·K) | 50 wt% micro-scale alumina dispersion matrix; supplied reference requiring configuration or test verification |
| قوة الانهيار العازل | Greater than 22.0 kV/mm | Tested under 50 Hz high-voltage electrical field; supplied reference requiring configuration or test verification |
| Metering Delivery Capacity | 2.0 to 18.0 kg/min | Tungsten-carbide abrasive-resistant gear pump skid; supplied reference requiring configuration or test verification |
| Flame Retardancy Standards | DIN 5510-2 Class S4 / SR2 / ST2 | Zero-halogen railway passenger transit compliance; supplied reference requiring configuration or test verification |
| Stator Component Length | Up to 3,200 mm | Long vacuum chamber with motorized mold carriage; supplied reference requiring configuration or test verification |
واجهات التغذية والمراحل اللاحقة ذات الصلة
The linked filler premixing station is auxiliary preparation. Main metering/mixing, vacuum chamber and stator handling require separate confirmation.
Core Advantages of Haifeng Maglev Potting Systems
وظائف هندسية وواجهات مطوّرة للمنتج ونظام المواد المحددين.
Filler preparation
Define dispersion, moisture and sampling for the chosen powder/resin.
Wear and settling
Select material-contact parts and a validated hold/recirculation procedure.
Chamber filling
Coordinate preheat, vacuum and dispensing around the actual stator.
Electrical inspection
Identify specimen versus assembly tests and maintain the agreed records.
مشاريع ذات صلة
The long-stator project supports its documented filler, potting and test arrangement, not a property guarantee from any premixing station.
الأسئلة الشائعة
أسئلة فنية لتحديد نطاق المعدات ونافذة المواد وخطة التحقق.
How is the thermal-conductivity target verified?
Why is a vacuum chamber considered for stator potting?
How is filler settling managed?
How are metering components selected for filled resins?
ما المدخلات اللازمة لهذا التكوين؟
What should be agreed for a filled-resin preparation-to-potting interface?
Request a Maglev Motor Encapsulation Proposal
Share the following for this application: Stator/cavity drawing, filler/loading data, viscosity/settling, shot, thermal limits, vacuum/cure and electrical tests. Our team will reply within one business day. Once requirements are clear, we provide a preliminary proposal within two business days.
